Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pittsburgh, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 739Number of bridges
  • 14,564ft / 4,439mTotal length
  • $433,022,000Total costs
  • 8,123,148Total average daily traffic
  • 545,684Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pittsburgh
  • No street view available for this location

New bridges in Pittsburgh, PA - historical statistics
  • New bridges - historical statistics
  • 5Before 1900
  • 211900-1909
  • 101910-1919
  • 631920-1929
  • 431930-1939
  • 161940-1949
  • 1261950-1959
  • 1341960-1969
  • 441970-1979
  • 1941980-1989
  • 421990-1999
  • 172000-2009
  • 232010-2019
  • 12020-2022
Reconstructed bridges in Pittsburgh, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 11940-1949
  • 21950-1959
  • 21960-1969
  • 171970-1979
  • 351980-1989
  • 301990-1999
  • 452000-2009
  • 352010-2019
  • 22020-2022
Average Bridge Daily Traffic in Pittsburgh, PA
Average Bridge Truck Traffic in Pittsburgh, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.9%Very good
  • 47.6%Good
  • 23.6%Satisfactory
  • 14.4%Fair
  • 3.7%Poor
  • 1.1%Serious
  • 0.7%Critical
  • 0.4%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.4%Very good
  • 32.0%Good
  • 29.9%Satisfactory
  • 22.1%Fair
  • 2.5%Poor
  • 1.1%Serious
  • 1.1%Critical
  • 0.7%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.6%Excellent
  • 30.2%Very good
  • 34.9%Good
  • 21.7%Satisfactory
  • 7.5%Fair
  • 1.1%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.2%Excellent
  • 13.5%Very good
  • 18.8%Good
  • 27.1%Satisfactory
  • 26.0%Fair
  • 9.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 16.7%Good
  • 44.4%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1876,  Location: McKees Rocks Bridge (Main (Lat: 40.475972,  Lng: -80.056464),  Route carried "on" structure: State highway ,  Year Built: 1931,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 114.42m (375.39ft),  Average Daily Traffic: 22,180 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,403 (year 2041),  Features Intersected: NORFOLK S RR, OHIO RIVER,  Facility Carried by Structure: McKees Rocks Brg
Minimum Vertical Clearance: 4.38m (14.37ft),  Kilometerpoint: 0.600,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 14,  Length of Maximum Span: 228.6m (750.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 133.00m (436.35ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2019,  Critical Feature Inspection Date: November 2019,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $739,000,  Roadway Improvement Cost: $2,176,000,  Total Project Cost: $9,974,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1879,  Location: PGH.@ WEST END CIRCLE (Lat: 40.444236,  Lng: -80.028400),  Route carried "on" structure: State highway ,  Year Built: 1910,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 11,801 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,171 (year 2032),  Design Load: HS 20,  Features Intersected: SAW MILL RUN,  Facility Carried by Structure: WEST CARSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.8m (12.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $126,000
Find on map >>   Show street view

Structure Number: 1902,  Location: PITTSBURGH,NELSON RUN RD. (Lat: 40.504944,  Lng: -80.009097),  Route carried "on" structure: US 19T,  Year Built: 1946,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 37,610 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 35,553 (year 2032),  Design Load: HS 20,  Features Intersected: NELSON RUN ROAD,  Facility Carried by Structure: MCKNIGHT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.919,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 185.9m (609.9ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2023,  Location: E. OHIO ST.UNDER SR 0579 (Lat: 40.454014,  Lng: -79.997289),  Route carried "on" structure: State highway ,  Year Built: 1986,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 22,172 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,131 (year 2032),  Design Load: HS 20,  Features Intersected: I-279 NB-SB,& HOV,  Facility Carried by Structure: EAST OHIO ST
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.021,  Lanes on structure: 4,  Lanes under structure: 15,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 203,  Location: Fort Duquesne Bridge (Lat: 40.448917,  Lng: -80.006069),  Route carried "on" structure: Interstate 279,  Year Built: 1986,  Status: Open,  Structure Length: 45.96m (150.79ft),  Average Daily Traffic: 429 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,971 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: FOUR CITY STREETS,  Facility Carried by Structure: HOV
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 52,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 45.90m (150.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2032,  Location: McKnight Interchange (Lat: 40.493583,  Lng: -80.011117),  Route carried "on" structure: Interstate 279,  Year Built: 1986,  Status: Open,  Structure Length: 24.38m (79.99ft),  Average Daily Traffic: 635 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,695 (year 2032),  Design Load: HL 93,  Features Intersected: RAMPJ,  Facility Carried by Structure: HOV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.784,  Lanes on structure: 2,  Lanes under structure: 36,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 8 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 24.90m (81.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,710,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2381,  Location: AL02 6 ST TO NORTH SIDE (Lat: 40.445497,  Lng: -80.003300),  Route carried "on" structure: Business City street ,  Year Built: 1928,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 30.33m (99.51ft),  Average Daily Traffic: 12,824 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,000 (year 2025),  Design Load: HS 25 or greater,  Features Intersected: 10TH ST BYPASS,ALLEGH RV,  Facility Carried by Structure: SIXTH STREET BR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 131.1m (430.1ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.30m (99.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: June 2017,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $3,488,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2382,  Location: AL03 7TH ST BRIDGE (Lat: 40.446222,  Lng: -80.001456),  Route carried "on" structure: County highway ,  Year Built: 1926,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 32.34m (106.10ft),  Average Daily Traffic: 9,900 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,680 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ALLEGH RIV,10 ST BY-PASS,  Facility Carried by Structure: SEVENTH STREET BR
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 134.7m (441.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.30m (105.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $712,000,  Total Project Cost: $3,265,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2383,  Location: AL04 9TH ST BRIDGE (Lat: 40.446600,  Lng: -79.999700),  Route carried "on" structure: County highway ,  Year Built: 1926,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 30.33m (99.51ft),  Average Daily Traffic: 22,462 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,462 (year 2025),  Design Load: HL 93,  Features Intersected: ALLEGH RIV,10 ST BY-PASS,  Facility Carried by Structure: NINTH STREET BR
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 131.1m (430.1ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.30m (99.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $276,000,  Roadway Improvement Cost: $812,000,  Total Project Cost: $3,723,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2384,  Location: AL05 16TH ST BRIDGE (Lat: 40.451597,  Lng: -79.990800),  Route carried "on" structure: City street ,  Year Built: 1922,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 57.91m (189.99ft),  Average Daily Traffic: 14,656 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,122 (year 2026),  Design Load: HS 25 or greater,  Features Intersected: SMALLMAN ST, ALLEG. RIV.,  Facility Carried by Structure: SIXTEENTHSTREET BR
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 26,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 31,  Length of Maximum Span: 133.2m (437.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 57.90m (189.96ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $32,886,000,  Total Project Cost: $123,526,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2385,  Location: CC02 CHARTIERS CRK # 2 (Lat: 40.464011,  Lng: -80.074794),  Route carried "on" structure: City street ,  Year Built: 1985,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 26.06m (85.50ft),  Average Daily Traffic: 12,037 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,145 (year 2028),  Design Load: HS 25 or greater,  Features Intersected: EDMORE&CRKRD,RR'S&CHARCK,  Facility Carried by Structure: WINDGAP AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.10m (85.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2386,  Location: IV01 IVORY AVENUE NO. 1 (Lat: 40.496756,  Lng: -80.012511),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 8,600 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,600 (year 2025),  Design Load: HS 25 or greater,  Features Intersected: I279 RAMP J & TRUCK US19,  Facility Carried by Structure: IVORY AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 15,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2387,  Location: JA01 JACKS RUN NO 1 (Lat: 40.488300,  Lng: -80.046039),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 23.47m (77.00ft),  Average Daily Traffic: 11,263 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,000 (year 2026),  Design Load: HL 93,  Features Intersected: FARRAGUT ST, JACKS RUN,  Facility Carried by Structure: CALIFORNIA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 14,  Length of Maximum Span: 97.5m (319.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.50m (77.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $865,000,  Total Project Cost: $3,964,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2388,  Location: MA11 SOUTH 10TH ST BRDG (Lat: 40.432736,  Lng: -79.989308),  Route carried "on" structure: County highway ,  Year Built: 1933,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 38.86m (127.49ft),  Average Daily Traffic: 18,372 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,100 (year 2030),  Design Load: HS 25 or greater,  Features Intersected: I376 AND CSX RR,  Facility Carried by Structure: TENTH STREET BR
Minimum Vertical Clearance: 20.52m (67.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 221.0m (725.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 38.90m (127.62ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: May 2017,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 239,  Location: SW06 SAW MILL RUN NO. 6 (Lat: 40.396267,  Lng: -79.997906),  Route carried "on" structure: County highway ,  Year Built: 1920,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 6,348 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,500 (year 2039),  Design Load: HS 20,  Features Intersected: SAW MILL RUN STREAM,  Facility Carried by Structure: COLERAIN ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $81,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2391,  Location: SZ02 STREETS RUN #2 (Lat: 40.386681,  Lng: -79.932339),  Route carried "on" structure: State highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,883 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 15,000 (year 2028),  Design Load: HS 20,  Features Intersected: STREETS RUN,  Facility Carried by Structure: RAMP ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2392,  Location: 301001 NEAR NEPTUNE (Lat: 40.440083,  Lng: -80.033361),  Route carried "on" structure: City street ,  Year Built: 1924,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 20 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 110 (year 2026),  Design Load: H 10,  Features Intersected: SAW MILL RUN,  Facility Carried by Structure: ALEXANDER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $70,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2394,  Location: 301005 CHARLES ANDERSONBR (Lat: 40.434506,  Lng: -79.949767),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1987,  Status: Posted for load,  Structure Length: 23.77m (77.99ft),  Average Daily Traffic: 21,211 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,000 (year 2042),  Design Load: H 15,  Features Intersected: CSX RR & BIKE TRAIL,  Facility Carried by Structure: BLVD OF THE ALLIES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 109.7m (359.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 23.80m (78.08ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,207,000,  Roadway Improvement Cost: $3,555,000,  Total Project Cost: $16,296,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2395,  Location: 301006 AT RT 51 SOUTH (Lat: 40.394500,  Lng: -79.997600),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 1998,  Status: Closed,  Structure Length: 1.10m (3.61ft),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: SAW MILL RUN,  Facility Carried by Structure: ANSONIA PL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $90,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2397,  Location: 301009 BIGELOW BLVD UNPSS (Lat: 40.458842,  Lng: -79.957622),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 20,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,110 (year 2040),  Design Load: HS 20,  Features Intersected: BLOOMFIELD BRIDGE RAMP F,  Facility Carried by Structure: BIGELOW BV
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 35 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 2398,  Location: 301010 BLOOMFIELD BRIDGE (Lat: 40.460636,  Lng: -79.955969),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 46.97m (154.10ft),  Average Daily Traffic: 30,000 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 32,000 (year 2043),  Design Load: HS 20,  Features Intersected: N-S RR,CSX RR,E BSWY,PL,  Facility Carried by Structure: BLOOMFIELD BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 91.4m (299.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.80m (153.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,847,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2399,  Location: 301014 IN HAYS #1 (Lat: 40.382983,  Lng: -79.932914),  Route carried "on" structure: City street ,  Year Built: 1931,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 125 (year 2043),  Design Load: HS 20,  Features Intersected: STREETS RUN CREEK,  Facility Carried by Structure: CALERA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $96,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2402,  Location: 301020 NEAR INT/STRAKA ST (Lat: 40.452858,  Lng: -80.054553),  Route carried "on" structure: Business City street ,  Year Built: 1908,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 12,700 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,000 (year 2041),  Design Load: HS 20,  Features Intersected: PAT AIRPORT BUSWAY,  Facility Carried by Structure: CHARTIERS AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $420,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2403,  Location: 301021 AT MCKEES ROCKS (Lat: 40.464922,  Lng: -80.053564),  Route carried "on" structure: Business City street ,  Year Built: 1925,  Year Reconstructed: 1978,  Status: Posted for load,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 5,022 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,524 (year 2042),  Design Load: HS 20,  Features Intersected: CHARTIERS CREEK,  Facility Carried by Structure: WEST CARSON ST
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $225,000,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2404,  Location: 301022 OVER NSRR (Lat: 40.458597,  Lng: -80.023600),  Route carried "on" structure: City street ,  Year Built: 1907,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 1,750 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,925 (year 2023),  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: COLUMBUS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $233,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2405,  Location: 301023 CRANE AVE AT RT 51 (Lat: 40.417028,  Lng: -80.015075),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 5,200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,720 (year 2041),  Design Load: H 20,  Features Intersected: SAW MILL RUN CREEK,  Facility Carried by Structure: CRANE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 2407,  Location: 301027 OFF PARKWOOD (Lat: 40.412314,  Lng: -79.968411),  Route carried "on" structure: ServiceCity street ,  Year Built: 1952,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BRANCH OF BECKS RUN CRK,  Facility Carried by Structure: EADS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2408,  Location: 301028 AT ROUTE 51 (Lat: 40.402064,  Lng: -80.000778),  Route carried "on" structure: City street ,  Year Built: 1914,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,250 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: SAW MILL RUN CREEK,  Facility Carried by Structure: EDGEBROOK AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2409,  Location: 200' WEST OF 2ND ST (Lat: 40.406986,  Lng: -79.944050),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,300 (year 2042),  Design Load: HS 20,  Features Intersected: CSX RR,GLOSTER ST,  Facility Carried by Structure: ELIZABETH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $312,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 241,  Location: 301033 NEAR S BRADDOCK AV (Lat: 40.439525,  Lng: -79.900333),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 13.62m (44.69ft),  Average Daily Traffic: 14,500 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,000 (year 2030),  Design Load: HS 20,  Features Intersected: 9 MILE RUN & FERN HOLLOW,  Facility Carried by Structure: FORBES AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 50.6m (166.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 13.60m (44.62ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $1,522,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2411,  Location: 301034 NEAR CRAIG (Lat: 40.444553,  Lng: -79.946803),  Route carried "on" structure: State highway ,  Year Built: 1900,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 7,395 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 30,000 (year 2029),  Design Load: HS 20,  Features Intersected: CSX RR, BOUNDARY ST,  Facility Carried by Structure: FORBES AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.574,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2412,  Location: 301035 FORT PITT BLVD(EB) (Lat: 40.437694,  Lng: -80.003450),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 49.47m (162.30ft),  Average Daily Traffic: 15,955 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,000 (year 2037),  Design Load: HS 20,  Features Intersected: MON WHARF PARKING LOT,  Facility Carried by Structure: FORT PITT BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 30,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 49.50m (162.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2413,  Location: AT INTERSECTION W/ RT 51 (Lat: 40.406153,  Lng: -80.003897),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2031),  Design Load: HS 20,  Features Intersected: SAW MILL RUN CREEK,  Facility Carried by Structure: FRANUM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2414,  Location: 301038 AT CALERA ST (Lat: 40.379981,  Lng: -79.934678),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 55 (year 2032),  Design Load: HS 20,  Features Intersected: STREETS RUN CREEK,  Facility Carried by Structure: CORLEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $98,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Pittsburgh, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.