Bridge Statistics for Pittsburgh, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 739Number of bridges
  • 14,564ft / 4,439mTotal length
  • $433,022,000Total costs
  • 8,123,148Total average daily traffic
  • 545,684Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pittsburgh
  • No street view available for this location

New bridges in Pittsburgh, PA - historical statistics
  • New bridges - historical statistics
  • 5Before 1900
  • 211900-1909
  • 101910-1919
  • 631920-1929
  • 431930-1939
  • 161940-1949
  • 1261950-1959
  • 1341960-1969
  • 441970-1979
  • 1941980-1989
  • 421990-1999
  • 172000-2009
  • 232010-2019
  • 12020-2022
Reconstructed bridges in Pittsburgh, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 11940-1949
  • 21950-1959
  • 21960-1969
  • 171970-1979
  • 351980-1989
  • 301990-1999
  • 452000-2009
  • 352010-2019
  • 22020-2022
Average Bridge Daily Traffic in Pittsburgh, PA
Average Bridge Truck Traffic in Pittsburgh, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.9%Very good
  • 47.6%Good
  • 23.6%Satisfactory
  • 14.4%Fair
  • 3.7%Poor
  • 1.1%Serious
  • 0.7%Critical
  • 0.4%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.4%Very good
  • 32.0%Good
  • 29.9%Satisfactory
  • 22.1%Fair
  • 2.5%Poor
  • 1.1%Serious
  • 1.1%Critical
  • 0.7%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.6%Excellent
  • 30.2%Very good
  • 34.9%Good
  • 21.7%Satisfactory
  • 7.5%Fair
  • 1.1%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.2%Excellent
  • 13.5%Very good
  • 18.8%Good
  • 27.1%Satisfactory
  • 26.0%Fair
  • 9.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 16.7%Good
  • 44.4%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1019,  Location: Fort Pitt Bridge (Lat: 40.438747,  Lng: -80.011600),  Route carried "on" structure: Interstate 376,  Year Built: 1959,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 36.79m (120.70ft),  Average Daily Traffic: 43,694 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 52,022 (year 2032),  Design Load: HS 20,  Features Intersected: MON R, NS RR, SR 0837,  Facility Carried by Structure: Fort Pitt Bridge
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 32.975,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Navigation Control: Yes ( Vertical Clearance: 14.3m (46.9ft), Horizontal Clearance: 2100.1m (6,890.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 229.2m (752.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 36.80m (120.73ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: April 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102,  Location: Fort Pitt Bridge (Lat: 40.439678,  Lng: -80.009969),  Route carried "on" structure: Interstate 279,  Year Built: 1958,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 14.11m (46.29ft),  Average Daily Traffic: 14,596 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 19,685 (year 2032),  Design Load: HS 20,  Features Intersected: POINT ST PARK MON RIVER,  Facility Carried by Structure: RAMP D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 12.2m (40.0ft), Horizontal Clearance: 44.5m (146.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 17.50m (57.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: April 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1022,  Location: Fort Duquesne Bridge (Lat: 40.450000,  Lng: -80.008333),  Route carried "on" structure: Interstate 279,  Year Built: 1968,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 13.78m (45.21ft),  Average Daily Traffic: 13,781 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,585 (year 2032),  Design Load: HS 20,  Features Intersected: SR279 SB RP SR 8041 RP D,  Facility Carried by Structure: 1039 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.380,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 9.1m (29.9ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 13.80m (45.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $583,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1023,  Location: Fort Duquesne Bridge (Lat: 40.444172,  Lng: -80.009131),  Route carried "on" structure: Interstate 279,  Year Built: 1959,  Status: Open,  Structure Length: 28.07m (92.09ft),  Average Daily Traffic: 13,726 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,512 (year 2032),  Design Load: HS 20,  Features Intersected: FT DUQ BR SB,ALLEG RVR,  Facility Carried by Structure: FORT. DUQ BRG (UP)
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.380,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 150.9m (495.1ft), Horizontal Clearance: 1311.9m (4,304.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 128.9m (422.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 28.10m (92.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $759,000,  Total Project Cost: $3,478,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1027,  Location: Fort Duquesne Bridge (Lat: 40.450000,  Lng: -80.016667),  Route carried "on" structure: Interstate 279,  Year Built: 1968,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 14,596 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 19,685 (year 2032),  Design Load: HS 20,  Features Intersected: I-279 NB RAMP D ALLGY RI,  Facility Carried by Structure: RAMP F
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.364,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 9.1m (29.9ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $421,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1028,  Location: Fort Duquesne Bridge (Lat: 40.446481,  Lng: -80.009528),  Route carried "on" structure: Interstate 279,  Year Built: 1985,  Status: Open,  Structure Length: 27.40m (89.90ft),  Average Daily Traffic: 13,726 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,512 (year 2032),  Design Load: HL 93,  Features Intersected: SR 0279SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.380,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 19 degrees,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 27.40m (89.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103,  Location: Fort Duquesne Bridge (Lat: 40.466667,  Lng: -80.016667),  Route carried "on" structure: Interstate 279,  Year Built: 1986,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 68.09m (223.39ft),  Average Daily Traffic: 13,726 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,512 (year 2032),  Design Load: HS 20,  Features Intersected: VARIOUS CITY STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.380,  Lanes on structure: 2,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 20,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 68.10m (223.43ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Critical Feature Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032,  Location: Fort Duquesne Bridge (Lat: 40.466667,  Lng: -80.016667),  Route carried "on" structure: Interstate 279,  Year Built: 1986,  Status: Open,  Structure Length: 55.84m (183.20ft),  Average Daily Traffic: 14,673 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 19,690 (year 2032),  Design Load: HS 20,  Features Intersected: VARIOUS CITY STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.364,  Lanes on structure: 2,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 19,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 63.10m (207.02ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Critical Feature Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1041,  Location: 301132 OV 1021 2D (3132) (Lat: 40.456522,  Lng: -79.998119),  Route carried "on" structure: City street ,  Year Built: 1987,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 1,500 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I279,I579 NB&SB,HOV,  Facility Carried by Structure: TRIPOLI STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 60,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1042,  Location: 301133 NORTH SIDE (3133) (Lat: 40.457133,  Lng: -79.998289),  Route carried "on" structure: City street ,  Year Built: 1987,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 5,000 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,117 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I279,I579 NB&SB, HOV,  Facility Carried by Structure: NORTH AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 18,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1047,  Location: 301134 NORTH SIDE (3134) (Lat: 40.458564,  Lng: -79.998778),  Route carried "on" structure: Ramp City street ,  Year Built: 1987,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 2,000 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,447 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I279 NB&SB,HOV&RAMP-S,  Facility Carried by Structure: East St, Ramp Q
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1056,  Location: I-279 OVER SUFFOLK ST. (Lat: 40.468903,  Lng: -80.002186),  Route carried "on" structure: Interstate 279,  Year Built: 1987,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 47,594 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 62,751 (year 2032),  Design Load: HS 20,  Features Intersected: SUFFOLK ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 47.4m (155.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106,  Location: D11136 OVER I-279 (Lat: 40.476797,  Lng: -80.007575),  Route carried "on" structure: ServiceCity street ,  Year Built: 1986,  Status: Open,  Structure Length: 10.79m (35.40ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2021),  Design Load: HS 25 or greater,  Features Intersected: I-279(LR 1021)NB,SB&HOV,  Facility Carried by Structure: MILROY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 29,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.80m (35.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1062,  Location: D11137 OVER I-279 (Lat: 40.483136,  Lng: -80.007569),  Route carried "on" structure: ServiceCity street ,  Year Built: 1986,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 2,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,000 (year 2022),  Design Load: HS 25 or greater,  Features Intersected: I-279(LR 1021-3),  Facility Carried by Structure: EAST ST
Minimum Vertical Clearance: 13.72m (45.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.70m (44.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $404,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1068,  Location: McKnight Interchange (Lat: 40.493728,  Lng: -80.010786),  Route carried "on" structure: Interstate 279,  Year Built: 1986,  Status: Open,  Structure Length: 25.42m (83.40ft),  Average Daily Traffic: 19,196 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,116 (year 2032),  Design Load: HS 20,  Features Intersected: SR 4003 4009 8102
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.049,  Lanes on structure: 3,  Lanes under structure: 67,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 40.5m (132.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.90m (84.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $718,000,  Total Project Cost: $3,292,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1069,  Location: McKnight Interchange (Lat: 40.493625,  Lng: -80.011322),  Route carried "on" structure: Interstate 279,  Year Built: 1986,  Status: Open,  Structure Length: 24.23m (79.49ft),  Average Daily Traffic: 13,660 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,584 (year 2032),  Design Load: HL 93,  Features Intersected: SR 4003,4009, & RAMP J
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.137,  Lanes on structure: 2,  Lanes under structure: 40,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 24.20m (79.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $126,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $1,698,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1116,  Location: Fort Pitt Bridge (Lat: 40.439306,  Lng: -80.010278),  Route carried "on" structure: Interstate 376,  Year Built: 1953,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 24.29m (79.69ft),  Average Daily Traffic: 43,321 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,944 (year 2032),  Design Load: HS 20,  Features Intersected: MON RIVER & WARF, 376 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.996,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Navigation Control: Yes ( Vertical Clearance: 46.9m (153.9ft), Horizontal Clearance: 750.1m (2,461.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 69.5m (228.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 83.60m (274.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Underwater Inspection Date: April 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 112,  Location: Fort Pitt Bridge (Lat: 40.439586,  Lng: -80.009347),  Route carried "on" structure: Interstate 376,  Year Built: 1958,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 15.42m (50.59ft),  Average Daily Traffic: 43,694 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 52,022 (year 2032),  Design Load: HS 20,  Features Intersected: LR1039 RP A(F),MON RIVER
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 32.975,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.6m (24.9ft), Horizontal Clearance: 228.6m (750.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 55.8m (183.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 15.40m (50.52ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: April 2017,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $1,584,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1133,  Location: 1/4 MI. E.OF LIBERTY BR. (Lat: 40.434000,  Lng: -79.994011),  Route carried "on" structure: Interstate 376,  Year Built: 1956,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 53.34m (175.00ft),  Average Daily Traffic: 46,177 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,203 (year 2032),  Design Load: HS 20,  Features Intersected: ABDN RR,2ND AVE,10TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.064,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 5,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 53.30m (174.87ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $2,012,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1137,  Location: EB OVER SECOND AVENUE (Lat: 40.435000,  Lng: -79.985000),  Route carried "on" structure: Interstate 376,  Year Built: 1953,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 23.26m (76.31ft),  Average Daily Traffic: 42,465 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,601 (year 2032),  Design Load: HS 20,  Features Intersected: SECOND AVE,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.095,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.80m (78.08ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $1,406,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1143,  Location: BRADY ST (Lat: 40.433333,  Lng: -79.966667),  Route carried "on" structure: Interstate 376,  Year Built: 1956,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 35.20m (115.49ft),  Average Daily Traffic: 22,961 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 31,238 (year 2032),  Design Load: HS 20,  Features Intersected: BRADY STREET& PED. TRAIL
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 36.709,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 35.70m (117.13ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $529,000,  Total Project Cost: $2,425,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1145,  Location: BRADY ST. INTERCHANGE (Lat: 40.433333,  Lng: -79.966667),  Route carried "on" structure: Interstate 376,  Year Built: 1956,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 22,859 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 31,100 (year 2032),  Design Load: HS 20,  Features Intersected: BRADY STREET,  Facility Carried by Structure: PENN LINCOLN PKWY
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 36.662,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1152,  Location: BATES ST. INTERCHANGE (Lat: 40.431625,  Lng: -79.959044),  Route carried "on" structure: Interstate 376,  Year Built: 1952,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 66,291 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 61,822 (year 2032),  Design Load: HS 20,  Features Intersected: BATES STREET,  Facility Carried by Structure: PENN LINCOLN PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.514,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 27.1m (88.9ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $738,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1153,  Location: BATES ST. INTERCHANGE (Lat: 40.431183,  Lng: -79.958375),  Route carried "on" structure: Interstate 376,  Year Built: 1952,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 66,291 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 61,822 (year 2032),  Design Load: HS 20,  Features Intersected: RAMP B (BATES ST),  Facility Carried by Structure: PENN LINCOLN PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.514,  Lanes on structure: 6,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $133,000
Find on map >>   Show street view

Structure Number: 1157,  Location: Frazier Street Bridge (Lat: 40.427417,  Lng: -79.953361),  Route carried "on" structure: Interstate 376,  Year Built: 1951,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 30.94m (101.51ft),  Average Daily Traffic: 97,444 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 68,855 (year 2032),  Design Load: HS 20,  Features Intersected: CSX RR,SWINEBURN,FRAZIER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.318,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 80.5m (264.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.90m (101.38ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $3,336,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1159,  Location: SALINE STREET BRIDGE (Lat: 40.433333,  Lng: -79.958333),  Route carried "on" structure: Interstate 376,  Year Built: 1951,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 97,444 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 68,855 (year 2032),  Design Load: HS 20,  Features Intersected: SALINE STREET,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.228,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.60m (47.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $710,000,  Total Project Cost: $3,254,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1163,  Location: @ INT W/ FORWARD AVE (Lat: 40.428333,  Lng: -79.916667),  Route carried "on" structure: Interstate 376,  Year Built: 1952,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 94,161 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 53,599 (year 2032),  Design Load: HS 20,  Features Intersected: FORWARD AVE, RAMP H,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.734,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 27.2m (89.2ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $1,679,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1167,  Location: COMMERCIAL STREET BRIDGE (Lat: 40.425564,  Lng: -79.905081),  Route carried "on" structure: Interstate 376,  Year Built: 1950,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 26.30m (86.29ft),  Average Daily Traffic: 94,161 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 53,599 (year 2032),  Design Load: HS 20,  Features Intersected: COMMERCIAL ST. & NINE MI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.678,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 53.6m (175.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.30m (86.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $597,000,  Total Project Cost: $2,737,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1217,  Location: TR 380 W.B.OVER 7TH AVE (Lat: 40.441667,  Lng: -79.996667),  Route carried "on" structure: State highway 380,  Year Built: 1960,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 7,665 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,283 (year 2032),  Design Load: HS 20,  Features Intersected: 7TH AVE,  Facility Carried by Structure: BIGELOW BLVD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $572,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1219,  Location: NEAR US STEEL BLDG (Lat: 40.441289,  Lng: -79.992783),  Route carried "on" structure: State highway 380,  Year Built: 1962,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 10,523 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,090 (year 2032),  Design Load: HS 20,  Features Intersected: 7th Ave. over I-579,  Facility Carried by Structure: RAMP G RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 33,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1222,  Location: Crosstown Blvd (Lat: 40.443033,  Lng: -79.992733),  Route carried "on" structure: State highway 380,  Year Built: 1986,  Status: Open,  Structure Length: 31.09m (102.00ft),  Average Daily Traffic: 7,665 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,283 (year 2032),  Design Load: HL 93,  Features Intersected: I-579 NB, SB, RAMP B,  Facility Carried by Structure: BIGELOW BLVD WB
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 3,  Length of Maximum Span: 51.5m (169.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 31.10m (102.03ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1229,  Location: 1 MI.S.OF BLOOMFIELD BR. (Lat: 40.454044,  Lng: -79.950550),  Route carried "on" structure: State highway 380,  Year Built: 1975,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 21,402 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 43,672 (year 2032),  Design Load: HS 20,  Features Intersected: CSX RR, PAT EAST BUSWAY,  Facility Carried by Structure: BAUM BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.406,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 58.5m (191.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $61,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $825,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 123,  Location: 301008 BAUM BLVD BRDG # 2 (Lat: 40.455331,  Lng: -79.944197),  Route carried "on" structure: State highway 380,  Year Built: 1913,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 21,402 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 52,000 (year 2030),  Design Load: HS 20,  Features Intersected: N-S RR PAT EAST BUSWAY,  Facility Carried by Structure: BAUM BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.406,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.5m (146.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.30m (37.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1234,  Location: I579 NB.OVER 5TH AVENUE (Lat: 40.439025,  Lng: -79.993656),  Route carried "on" structure: Interstate 579,  Year Built: 1962,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 29,197 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,463 (year 2032),  Design Load: HS 20,  Features Intersected: FIFTH AVE,  Facility Carried by Structure: CROSSTOWN BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $218,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing