Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Atlanta, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 943Number of bridges
  • 11,804ft / 3,598mTotal length
  • $2,063,749,000Total costs
  • 46,196,877Total average daily traffic
  • 629,964Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Atlanta
  • No street view available for this location

New bridges in Atlanta, GA - historical statistics
  • New bridges - historical statistics
  • 31900-1909
  • 51910-1919
  • 271920-1929
  • 271930-1939
  • 121940-1949
  • 301950-1959
  • 1071960-1969
  • 271970-1979
  • 1181980-1989
  • 421990-1999
  • 162000-2009
  • 182010-2019
  • 82020-2022
Reconstructed bridges in Atlanta, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41940-1949
  • 31950-1959
  • 31960-1969
  • 461970-1979
  • 201980-1989
  • 31990-1999
  • 22000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Atlanta, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.0%Very good
  • 72.6%Good
  • 18.6%Satisfactory
  • 4.5%Fair
  • 0.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.1%Very good
  • 59.6%Good
  • 8.8%Satisfactory
  • 4.5%Fair
  • 1.1%Poor
  • 0.3%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.3%Excellent
  • 4.3%Very good
  • 79.5%Good
  • 11.2%Satisfactory
  • 4.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.5%Excellent
  • 36.0%Very good
  • 34.3%Good
  • 19.2%Satisfactory
  • 5.8%Fair
  • 1.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 73.3%Good
  • 21.7%Satisfactory
  • 5.0%Fair
Find on map >>   Show street view

Structure Number: 121063,  Location: IN ALPHARETTA CTY LIMITS (Lat: 34.090872,  Lng: -84.233353),  Route carried "on" structure: City street 9284,  Year Built: 1986,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 12,980 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,470 (year 2032),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: WINDWARD PKY (WBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $867,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1210631,  Location: IN S ATLANTA (Lat: 33.698989,  Lng: -84.404428),  Route carried "on" structure: Ramp State highway 166,  Year Built: 1987,  Status: Open,  Structure Length: 9.57m (31.40ft),  Average Daily Traffic: 4,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75- SR 166 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210632,  Location: IN ATLANTA (Lat: 33.736875,  Lng: -84.392028),  Route carried "on" structure: Interstate 75,  Year Built: 1987,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 260,300 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 390,450 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9053 GEORGIA AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 395.899,  Lanes on structure: 14,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 64.0m (210.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 67.8m (222.4ft),  Out-to-Out Width: 69.9m (229.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,205,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $4,808,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210633,  Location: IN S ATLANTA (Lat: 33.686378,  Lng: -84.401919),  Route carried "on" structure: Interstate 85,  Year Built: 1986,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 92,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 138,000 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.310,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 19 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 1210634,  Location: IN S ATLANTA (Lat: 33.688708,  Lng: -84.400058),  Route carried "on" structure: Interstate 85,  Year Built: 1987,  Status: Open,  Structure Length: 22.13m (72.60ft),  Average Daily Traffic: 92,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 138,000 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75- 2 I-75 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.310,  Lanes on structure: 2,  Lanes under structure: 13,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 73.2m (240.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210639,  Location: IN SOUTH ATLANTA (Lat: 33.688028,  Lng: -84.399578),  Route carried "on" structure: Ramp Interstate 85,  Year Built: 1988,  Status: Open,  Structure Length: 16.76m (54.99ft),  Average Daily Traffic: 4,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75- 2 I-75 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.310,  Lanes on structure: 2,  Lanes under structure: 13,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 70.7m (232.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 121064,  Location: IN COLLEGE PARK (Lat: 33.620458,  Lng: -84.464119),  Route carried "on" structure: Interstate 285,  Year Built: 1988,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 105,410 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 158,115 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-285 RMP TO I-85 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.779,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 7 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 52.7m (172.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210644,  Location: IN ATLANTA (Lat: 33.765439,  Lng: -84.385458),  Route carried "on" structure: City street 9201,  Year Built: 1987,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 16,050 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 24,075 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: PEACHTREE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,353,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $3,529,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210646,  Location: IN N ATLANTA (Lat: 33.820694,  Lng: -84.358517),  Route carried "on" structure: State highway 236,  Year Built: 1988,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 14,650 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 21,975 (year 2032),  Design Load: HS 20,  Features Intersected: NORTH FORK P'TREE CREEK,  Facility Carried by Structure: LINDBERGH DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,268,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1210647,  Location: IN W ATLANTA (Lat: 33.742728,  Lng: -84.403519),  Route carried "on" structure: City street 9170,  Year Built: 1988,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 7,340 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,010 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: MCDANIEL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 5,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,328,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,993,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210649,  Location: IN S ATLANTA (Lat: 33.695258,  Lng: -84.404758),  Route carried "on" structure: Ramp State highway 166,  Year Built: 1987,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 13,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,490 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75- SR 166 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Lanes under structure: 14,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 121065,  Location: 4.5 M NE OF UNION CITY (Lat: 33.617100,  Lng: -84.489450),  Route carried "on" structure: Ramp Interstate 85,  Year Built: 1987,  Status: Open,  Structure Length: 24.26m (79.59ft),  Average Daily Traffic: 1,370 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,055 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 14P & 2- I-285 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.045,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,110,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $4,665,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210651,  Location: I-20 & I-75 INTERCHANGE (Lat: 33.745258,  Lng: -84.391789),  Route carried "on" structure: Interstate 20,  Year Built: 1988,  Status: Open,  Structure Length: 54.41m (178.51ft),  Average Daily Traffic: 82,980 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 124,470 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: 3I75RMP-2I20RMP-3MRT-2MR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.733,  Lanes on structure: 2,  Lanes under structure: 22,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 82.3m (270.0ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $6,974,000,  Roadway Improvement Cost: $697,000,  Total Project Cost: $10,462,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210652,  Location: I-20 =I-75 INTERCHANGE (Lat: 33.745458,  Lng: -84.391969),  Route carried "on" structure: Interstate 20,  Year Built: 1988,  Status: Open,  Structure Length: 54.68m (179.40ft),  Average Daily Traffic: 82,980 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 124,470 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: 3I75RMP-2I20RMP-3MRT-2MR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.733,  Lanes on structure: 3,  Lanes under structure: 21,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 68.6m (225.1ft),  Curb-To-Curb Width: 16.7m (54.8ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $8,921,000,  Roadway Improvement Cost: $892,000,  Total Project Cost: $13,382,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210653,  Location: I-20 & I-75 INTERCHANGE (Lat: 33.744242,  Lng: -84.387767),  Route carried "on" structure: City street 9007,  Year Built: 1988,  Status: Open,  Structure Length: 16.52m (54.20ft),  Average Daily Traffic: 10,540 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,810 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-20- I-75 RMP- I-20 RMP,  Facility Carried by Structure: CAPITOL AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 6,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 59.7m (195.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,428,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $6,642,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210654,  Location: IN ATLANTA (Lat: 33.741939,  Lng: -84.391636),  Route carried "on" structure: City street 9167,  Year Built: 1988,  Status: Open,  Structure Length: 18.96m (62.20ft),  Average Daily Traffic: 1,020 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,530 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-75-3 I-75R-1 MRT-1 CS,  Facility Carried by Structure: FULTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 5,  Lanes under structure: 24,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 50.0m (164.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,419,000,  Roadway Improvement Cost: $442,000,  Total Project Cost: $6,628,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1210656,  Location: I-20 & I-75-85 INTERCHANG (Lat: 33.744786,  Lng: -84.392786),  Route carried "on" structure: Ramp Interstate 20,  Year Built: 1988,  Status: Open,  Structure Length: 42.31m (138.81ft),  Average Daily Traffic: 4,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75-3I-75R-I-20R-3MRT-2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.733,  Lanes on structure: 2,  Lanes under structure: 32,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 62.8m (206.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,423,000,  Roadway Improvement Cost: $542,000,  Total Project Cost: $8,135,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210657,  Location: I-20 & I-75-85 INTER. (Lat: 33.744650,  Lng: -84.393914),  Route carried "on" structure: Ramp Interstate 20,  Year Built: 1987,  Status: Open,  Structure Length: 21.58m (70.80ft),  Average Daily Traffic: 35,240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 52,860 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-9163- M-9164- M-9166
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.733,  Lanes on structure: 1,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,012,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $3,018,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210658,  Location: I-20 & I-75 INTERCHANGE (Lat: 33.746119,  Lng: -84.392256),  Route carried "on" structure: Ramp Interstate 20,  Year Built: 1988,  Status: Open,  Structure Length: 64.01m (210.01ft),  Average Daily Traffic: 4,990 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,485 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75-3I-75RMP-3I-20RMP-3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.733,  Lanes on structure: 1,  Lanes under structure: 34,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 73.2m (240.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $5,967,000,  Roadway Improvement Cost: $597,000,  Total Project Cost: $8,951,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210659,  Location: I-20 & I-75 INTERCHANGE (Lat: 33.745644,  Lng: -84.389506),  Route carried "on" structure: Ramp Interstate 20,  Year Built: 1988,  Status: Open,  Structure Length: 25.33m (83.10ft),  Average Daily Traffic: 4,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75-3 I75 RMPS- I20 RMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.733,  Lanes on structure: 1,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 59.4m (194.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $2,361,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,542,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 121066,  Location: IN ATLANTA (Lat: 33.741889,  Lng: -84.393308),  Route carried "on" structure: City street 9167,  Year Built: 1988,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 5,880 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,820 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9164 CENTRAL AVE.,  Facility Carried by Structure: FULTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210661,  Location: IN ATLANTA (Lat: 33.752272,  Lng: -84.379583),  Route carried "on" structure: Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 335,210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 502,815 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CS 3541 BELL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 397.508,  Lanes on structure: 15,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 73.2m (240.2ft),  Skew: 35 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 87.9m (288.4ft),  Out-to-Out Width: 89.9m (294.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,042,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $3,064,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210662,  Location: IN ATLANTA (Lat: 33.754928,  Lng: -84.378469),  Route carried "on" structure: Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 16.31m (53.51ft),  Average Daily Traffic: 312,590 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 468,885 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M9184 ED'WD- M9150 AUBU'
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 397.508,  Lanes on structure: 14,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 69.5m (228.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 66.5m (218.2ft),  Out-to-Out Width: 68.6m (225.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $8,932,000,  Roadway Improvement Cost: $893,000,  Total Project Cost: $13,397,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210663,  Location: IN ATLANTA (Lat: 33.757661,  Lng: -84.378628),  Route carried "on" structure: Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 291,150 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 436,725 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9157 IRWIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 399.118,  Lanes on structure: 14,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 62.5m (205.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 74.5m (244.4ft),  Out-to-Out Width: 76.5m (251.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,953,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,930,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210664,  Location: IN ATLANTA (Lat: 33.764247,  Lng: -84.384128),  Route carried "on" structure: City street 9007,  Year Built: 1987,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 11,780 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,670 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: COURTLAND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 14,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 51.5m (169.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 86.9m (285.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,681,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $2,521,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210665,  Location: IN ATALNTA (Lat: 33.764378,  Lng: -84.384419),  Route carried "on" structure: City street 9045,  Year Built: 1987,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 2,830 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,245 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-75 RAMP TO COURTLAND,  Facility Carried by Structure: RALPH MCGILL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $788,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210666,  Location: IN ATLANTA (Lat: 33.749850,  Lng: -84.382208),  Route carried "on" structure: City street 9152,  Year Built: 1988,  Status: Open,  Structure Length: 10.82m (35.50ft),  Average Daily Traffic: 21,390 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 32,085 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: DECATUR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Lanes under structure: 16,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 56.7m (186.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 22.7m (74.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,144,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $3,215,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210667,  Location: IN ATLANTA (Lat: 33.762189,  Lng: -84.381989),  Route carried "on" structure: City street 9153,  Year Built: 1987,  Status: Open,  Structure Length: 11.92m (39.11ft),  Average Daily Traffic: 6,470 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,705 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-75 + I-75 RAMP,  Facility Carried by Structure: BAKER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 5,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 57.0m (187.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 88.0m (288.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,778,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $4,166,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210668,  Location: IN ATLANTA (Lat: 33.737414,  Lng: -84.391906),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 22.04m (72.31ft),  Average Daily Traffic: 1,900 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,850 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-75- I-75 RMP- 2 M-RTS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 395.899,  Lanes on structure: 2,  Lanes under structure: 25,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 60.4m (198.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,825,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $4,237,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210669,  Location: IN ATLANTA (Lat: 33.736839,  Lng: -84.391228),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 5,920 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,880 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9053 GEORGIA AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 395.899,  Lanes on structure: 1,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $597,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $895,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210674,  Location: IN W ATLANTA (Lat: 33.773069,  Lng: -84.410700),  Route carried "on" structure: US 78,  Year Built: 1906,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 15,770 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,655 (year 2032),  Design Load: H 15,  Features Intersected: ATLANTA BELTLINE,  Facility Carried by Structure: DONALD LEE HOLLOWE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 36.3m (119.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $317,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1210681,  Location: IN N ATLANTA (Lat: 33.823253,  Lng: -84.457367),  Route carried "on" structure: City street 9003,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 16,800 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,200 (year 2031),  Design Load: HS 20,  Features Intersected: SEWAGE CHNL & SERVICE RD,  Facility Carried by Structure: MARIETTA BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Excellent,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $239,000
Find on map >>   Show street view

Structure Number: 1210683,  Location: IN N ATLANTA (Lat: 33.819628,  Lng: -84.454819),  Route carried "on" structure: City street 9013,  Year Built: 1935,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: H 15,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: BOLTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1210686,  Location: IN SOUTH EAST ATLANTA (Lat: 33.682947,  Lng: -84.352719),  Route carried "on" structure: City street 9089,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,570 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,855 (year 2031),  Design Load: H 15,  Features Intersected: FEDERAL PRISON BRANCH,  Facility Carried by Structure: RIVER IND. BVLD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1210697,  Location: 3.6 MI NW OF ALPHARETTA (Lat: 34.111897,  Lng: -84.339389),  Route carried "on" structure: State highway 372,  Year Built: 1989,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 9,400 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,100 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COOPER SANDY CREEK,  Facility Carried by Structure: BIRMINGHAM HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.82m (137.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 1210699,  Location: IN ATLANTA (Lat: 33.741450,  Lng: -84.391169),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 5,920 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,880 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 NB RMP TO I-20 E&WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 395.899,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 7 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $990,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,484,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 12107,  Location: IN ATLANTA (Lat: 33.742258,  Lng: -84.391158),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 4,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 NB RMP TO I-20 E&WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 395.899,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $498,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210701,  Location: IN ATLANTA (Lat: 33.742600,  Lng: -84.392158),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1988,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 4,740 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,110 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 RMP SB FROM I-20N&S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 395.899,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $1,019,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,529,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Discuss Atlanta, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.