Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Atlanta, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 943Number of bridges
  • 11,804ft / 3,598mTotal length
  • $2,063,749,000Total costs
  • 46,196,877Total average daily traffic
  • 629,964Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Atlanta
  • No street view available for this location

New bridges in Atlanta, GA - historical statistics
  • New bridges - historical statistics
  • 31900-1909
  • 51910-1919
  • 271920-1929
  • 271930-1939
  • 121940-1949
  • 301950-1959
  • 1071960-1969
  • 271970-1979
  • 1181980-1989
  • 421990-1999
  • 162000-2009
  • 182010-2019
  • 82020-2022
Reconstructed bridges in Atlanta, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41940-1949
  • 31950-1959
  • 31960-1969
  • 461970-1979
  • 201980-1989
  • 31990-1999
  • 22000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Atlanta, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.0%Very good
  • 72.6%Good
  • 18.6%Satisfactory
  • 4.5%Fair
  • 0.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.1%Very good
  • 59.6%Good
  • 8.8%Satisfactory
  • 4.5%Fair
  • 1.1%Poor
  • 0.3%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.3%Excellent
  • 4.3%Very good
  • 79.5%Good
  • 11.2%Satisfactory
  • 4.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.5%Excellent
  • 36.0%Very good
  • 34.3%Good
  • 19.2%Satisfactory
  • 5.8%Fair
  • 1.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 73.3%Good
  • 21.7%Satisfactory
  • 5.0%Fair
Find on map >>   Show street view

Structure Number: 630056,  Location: ATLANTA AIRPORT (Lat: 33.641892,  Lng: -84.449661),  Route carried "on" structure: City street 1910,  Year Built: 1979,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 500 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-1911,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 63006,  Location: ATLANTA AIRPORT (Lat: 33.646108,  Lng: -84.445208),  Route carried "on" structure: City street 1911,  Year Built: 1979,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20,  Features Intersected: M-1912,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 630061,  Location: ATLANTA AIRPORT (Lat: 33.644072,  Lng: -84.447308),  Route carried "on" structure: City street 1913,  Year Built: 1979,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-1910- M-1914- M-1912,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 635002,  Location: 2.5 MI E OF LAKE CITY (Lat: 33.601258,  Lng: -84.287997),  Route carried "on" structure: County highway 84,  Year Built: 1984,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG COTTON INDIAN CREEK,  Facility Carried by Structure: DOUBLE BRIDGES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 635079,  Location: SOUTH LAKE MALL (Lat: 33.577681,  Lng: -84.352767),  Route carried "on" structure: City street 345,  Year Built: 2013,  Status: Open,  Structure Length: 10.29m (33.76ft),  Average Daily Traffic: 50 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 100 (year 2035),  Design Load: H 15,  Features Intersected: JESTER CREEK,  Facility Carried by Structure: OLE TOWN MORROW RO
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.34m (40.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $29,970,000,  Roadway Improvement Cost: $2,997,000,  Total Project Cost: $44,955,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 635088,  Location: 1.8 MI NW OF FOREST PARK (Lat: 33.647167,  Lng: -84.379497),  Route carried "on" structure: County highway 198,  Year Built: 1965,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 2,010 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,010 (year 2020),  Design Load: HS 20+Mod,  Features Intersected: POOLE CREEK TRIB,  Facility Carried by Structure: GILBERT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,220,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,330,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 670001,  Location: 4.8 MI SE OF SMYRNA (Lat: 33.834006,  Lng: -84.465817),  Route carried "on" structure: City street 9003,  Year Built: 1995,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 22,520 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 33,780 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD (340365U),  Facility Carried by Structure: ATLANTA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 670034,  Location: 6.1 MI S OF SMYRNA (Lat: 33.795439,  Lng: -84.507669),  Route carried "on" structure: US 78,  Year Built: 1934,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 16.46m (54.00ft),  Average Daily Traffic: 24,320 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 36,480 (year 2032),  Design Load: H 20,  Features Intersected: CHATTAHOOCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $3,261,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $4,891,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 770037,  Location: 1.5 MI W OF MORELAND (Lat: 33.292881,  Lng: -84.795008),  Route carried "on" structure: Interstate 85,  Year Built: 1973,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 47,400 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 71,100 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.764,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $235,000
Find on map >>   Show street view

Structure Number: 890001,  Location: 2.5 MI W OF DECATUR (Lat: 33.773958,  Lng: -84.336200),  Route carried "on" structure: US 23,  Year Built: 1922,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 31,650 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 47,475 (year 2031),  Design Load: H 15,  Features Intersected: LULLWATER CREEK,  Facility Carried by Structure: PONCE DE LEON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.48m (31.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $592,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $888,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 890022,  Location: 12 MI SW OF DECATUR (Lat: 33.667908,  Lng: -84.340328),  Route carried "on" structure: US 23,  Year Built: 1964,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 36,210 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 54,315 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 8,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 35.4m (116.1ft),  Out-to-Out Width: 39.4m (129.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,637,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $3,956,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890023,  Location: 11 MI SW OF DECATUR (Lat: 33.680344,  Lng: -84.346092),  Route carried "on" structure: US 23,  Year Built: 1976,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 36,210 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 54,315 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 32.7m (107.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,634,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $2,451,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890024,  Location: 10 MI SW OF DECATUR (Lat: 33.692600,  Lng: -84.349428),  Route carried "on" structure: US 23,  Year Built: 1976,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 39,000 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 28.1m (92.2ft),  Out-to-Out Width: 36.4m (119.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,459,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $2,189,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890025,  Location: 5.5 MI SW OF DECATUR (Lat: 33.717525,  Lng: -84.349511),  Route carried "on" structure: US 23,  Year Built: 1935,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 39,000 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2030),  Design Load: H 15,  Features Intersected: ENTRENCHMENT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $326,000
Find on map >>   Show street view

Structure Number: 890027,  Location: 3.35 MI NW OF DECATUR (Lat: 33.800550,  Lng: -84.337000),  Route carried "on" structure: State highway 42,  Year Built: 1939,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 14,230 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,345 (year 2031),  Design Load: H 15,  Features Intersected: S FORK PEACHTREE CREEK,  Facility Carried by Structure: BRIARCLIFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,360,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 89005,  Location: 2.6 MI S OF DECATUR (Lat: 33.739800,  Lng: -84.327158),  Route carried "on" structure: State highway 260,  Year Built: 1963,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 14,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 21,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: GLENWOOD AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $272,000
Find on map >>   Show street view

Structure Number: 890105,  Location: 9.5 MI S OF DECATUR (Lat: 33.671019,  Lng: -84.332847),  Route carried "on" structure: Interstate 285,  Year Built: 1967,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 105,190 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 157,785 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 142 HENRICO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.686,  Lanes on structure: 9,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 46.1m (151.2ft),  Out-to-Out Width: 48.1m (157.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,955,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,933,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 890157,  Location: 3.3 MI SE OF DECATUR (Lat: 33.724178,  Lng: -84.319619),  Route carried "on" structure: City street 9122,  Year Built: 1945,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 10,200 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,300 (year 2031),  Design Load: H 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: FLAT SHOALS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.33m (30.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000
Find on map >>   Show street view

Structure Number: 890164,  Location: DEKALB-FULTON C/L IN ATL (Lat: 33.760094,  Lng: -84.349164),  Route carried "on" structure: City street 9332,  Year Built: 1959,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 18,060 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,090 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 42 MORELAND AVE(US23),  Facility Carried by Structure: DEKALB AVE-GA RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 31 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 74.4m (244.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $725,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,087,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890256,  Location: 2.8 MI S OF DECATUR (Lat: 33.739697,  Lng: -84.322289),  Route carried "on" structure: State highway 260,  Year Built: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 14,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 21,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK TRIB,  Facility Carried by Structure: GLENWOOD AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.4m (7.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $216,000
Find on map >>   Show street view

Structure Number: 890261,  Location: 3.2 MI NW OF DECATUR (Lat: 33.802989,  Lng: -84.340658),  Route carried "on" structure: City street 9187,  Year Built: 1953,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 8,430 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,645 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: S FORK PEACHTREE CREEK,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890281,  Location: 5.5 MI S OF DECATUR (Lat: 33.671533,  Lng: -84.333800),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1984,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 6,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 142 HENRICO ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 83.686,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $546,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890283,  Location: 7 MI S OF DECATUR (Lat: 33.670747,  Lng: -84.330272),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1984,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 11,630 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,445 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.686,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $762,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,143,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890284,  Location: 7 MI S OF DECATUR (Lat: 33.670292,  Lng: -84.332003),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1984,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 11,630 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,445 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 142 HENRICO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.686,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890285,  Location: 7 MI S OF DECATUR (Lat: 33.669539,  Lng: -84.334819),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1984,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 11,630 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,445 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 42 RAMP TO I-285 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.295,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890293,  Location: 5 MI S OF DECATUR (Lat: 33.671469,  Lng: -84.334000),  Route carried "on" structure: Ramp Interstate 675,  Year Built: 1984,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 74,810 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 112,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-285 RAMP (SR 407)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.5m (155.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $899,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,348,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890303,  Location: IN ATLANTA (Lat: 33.745550,  Lng: -84.333789),  Route carried "on" structure: City street 9194,  Year Built: 1962,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,550 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,325 (year 2031),  Design Load: HS 20,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: MAYNARD TERR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $190,000
Find on map >>   Show street view

Structure Number: 890308,  Location: 5 MI SW OF DECATUR (Lat: 33.745481,  Lng: -84.349236),  Route carried "on" structure: US 23,  Year Built: 1992,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 39,000 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: MORELAND AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 7,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 31.2m (102.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Other Special Inspection Date: December 2020,  Bridge Improvement Cost: $2,133,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $3,200,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 89031,  Location: 2.8 MI SW OF DECATUR (Lat: 33.739853,  Lng: -84.328419),  Route carried "on" structure: State highway 260,  Year Built: 1992,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 7,770 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,655 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: GLENWOOD AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,010,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $3,015,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890314,  Location: IN ATLANTA (Lat: 33.726808,  Lng: -84.323947),  Route carried "on" structure: City street 9122,  Year Built: 1992,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 10,200 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,300 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: FLAT SHOAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,220,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,830,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890316,  Location: IN ATLANTA (Lat: 33.725200,  Lng: -84.324100),  Route carried "on" structure: City street 9174,  Year Built: 1992,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 4,960 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,440 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: FAYETTEVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $828,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,242,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890317,  Location: IN ATLANTA (Lat: 33.744653,  Lng: -84.334303),  Route carried "on" structure: City street 9194,  Year Built: 1992,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 3,550 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,325 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: MAYNARD TERR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $915,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,372,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 89032,  Location: IN ATLANTA (Lat: 33.743458,  Lng: -84.332128),  Route carried "on" structure: City street 2631,  Year Built: 1992,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: CLIFTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $996,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,495,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 895039,  Location: NE ATLANTA CITY LIMITS (Lat: 33.779439,  Lng: -84.332819),  Route carried "on" structure: County highway 1288,  Year Built: 1956,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: LULLWATER CREEK,  Facility Carried by Structure: LULLWATER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 161.85m (531.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 89504,  Location: NE ATLANTA CITY LIMITS (Lat: 33.776678,  Lng: -84.334408),  Route carried "on" structure: City street 1288,  Year Built: 1956,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: LULLWATER CREEK,  Facility Carried by Structure: LULLWATER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 161.73m (530.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 895042,  Location: 3 MI NW OF DECATUR (Lat: 33.794858,  Lng: -84.344019),  Route carried "on" structure: City street 9011,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,020 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,030 (year 2031),  Design Load: H 15,  Features Intersected: S FORK PEACHTREE CREEK,  Facility Carried by Structure: EAST ROCK SPRINGS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.87m (134.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 895116,  Location: IN ATLANTA CITY LIMITS (Lat: 33.744108,  Lng: -84.332089),  Route carried "on" structure: City street 2631,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: CLIFTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 895137,  Location: 3 MI SE OF DECATUR (Lat: 33.728139,  Lng: -84.320128),  Route carried "on" structure: City street 9174,  Year Built: 1997,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 4,960 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,440 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: FAYETTEVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $334,000
Find on map >>   Show street view

Structure Number: 1210001,  Location: 0.4 MI N CLAYTON CO LINE (Lat: 33.652858,  Lng: -84.395939),  Route carried "on" structure: US 19,  Year Built: 1984,  Status: Open,  Structure Length: 11.80m (38.71ft),  Average Daily Traffic: 17,160 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,740 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75- 2 I-75 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 16,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210002,  Location: 1.5 MI E OF EAST POINT (Lat: 33.684819,  Lng: -84.408050),  Route carried "on" structure: US 19,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 14,950 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,425 (year 2032),  Design Load: HS 20,  Features Intersected: SOUTH RIVER,  Facility Carried by Structure: METROPOLITAN AVE.U
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 1210003,  Location: IN N FULTON (Lat: 33.774528,  Lng: -84.408289),  Route carried "on" structure: US 41,  Year Built: 1952,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 19,810 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,715 (year 2032),  Design Load: HS 20,  Features Intersected: CSX + NOR SOU RAILROAD,  Facility Carried by Structure: NORTHSIDE DRIVE US
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,315,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,973,000,  Deck Structure Type: Concrete Cast-file-Place
Discuss Atlanta, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.