Bridge Statistics for Oklahoma City, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,901Number of bridges
  • 21,391ft / 6,520mTotal length
  • $2,061,419,000Total costs
  • 30,433,195Total average daily traffic
  • 3,708,300Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oklahoma City
  • No street view available for this location

New bridges in Oklahoma City, OK - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71910-1919
  • 541920-1929
  • 491930-1939
  • 1831940-1949
  • 1481950-1959
  • 2111960-1969
  • 2811970-1979
  • 2861980-1989
  • 2571990-1999
  • 2292000-2009
  • 1382010-2019
  • 572020-2022
Reconstructed bridges in Oklahoma City, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 61950-1959
  • 151960-1969
  • 231970-1979
  • 521980-1989
  • 421990-1999
  • 372000-2009
  • 182010-2019
  • 22020-2022
Average Bridge Truck Traffic in Oklahoma City, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.0%Excellent
  • 44.8%Very good
  • 27.4%Good
  • 13.4%Satisfactory
  • 2.0%Fair
  • 3.1%Poor
  • 0.5%Serious
  • 3.1%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.1%Excellent
  • 26.6%Very good
  • 27.4%Good
  • 24.7%Satisfactory
  • 12.6%Fair
  • 2.1%Poor
  • 3.1%Serious
  • 0.5%Critical
  • 3.1%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.3%Excellent
  • 14.8%Very good
  • 29.6%Good
  • 23.4%Satisfactory
  • 20.5%Fair
  • 6.5%Poor
  • 3.1%Serious
  • 0.7%Critical
  • 3.1%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.3%Excellent
  • 19.5%Very good
  • 25.1%Good
  • 28.1%Satisfactory
  • 17.4%Fair
  • 5.3%Poor
  • 1.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 0.2%Excellent
  • 10.6%Very good
  • 38.1%Good
  • 38.9%Satisfactory
  • 7.7%Fair
  • 1.2%Poor
  • 3.4%Serious
Find on map >>   Show street view

Structure Number: 28963,  Location: .5 MILE S. OF WESTERN (Lat: 35.455833,  Lng: -97.516111),  Route carried "under" structure: Ramp Interstate 40,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-40/ SLWC R.R. UNDER,  Facility Carried by Structure: ROBINSON AVE
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 13.998,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 2907,  Location: 36.3E OF CADDO C/L (Lat: 35.460000,  Lng: -97.688611),  Route carried "under" structure: Interstate 40,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 63,000 (year 2020),  Truck Traffic: 43%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: MORGAN RD. (SPUI)
Minimum Vertical Clearance: 5.14m (16.86ft),  Kilometerpoint: 58.503,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 29589,  Location: 6E CANADIAN C/L (Lat: 35.461069,  Lng: -97.565925),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 56,650 (year 2020),  Truck Traffic: 12%,  Features Intersected: MAY AVE. UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 2962,  Location: .5E OF I235 (Lat: 35.530003,  Lng: -97.504169),  Route carried "under" structure: Ramp US 177,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 6,550 (year 2020),  Truck Traffic: 3%,  Features Intersected: U.S. 77 NB RAMP UNDER,  Facility Carried by Structure: U.S. 77 RAMP
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 2962,  Location: .5E OF I235 (Lat: 35.530003,  Lng: -97.504169),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 6,550 (year 2020),  Truck Traffic: 3%,  Features Intersected: U.S. 77 NB RAMP UNDER,  Facility Carried by Structure: U.S. 77 RAMP
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 29621,  Location: I-44 & I-235 JCT (Lat: 35.526386,  Lng: -97.514281),  Route carried "under" structure: Interstate 235,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 75,510 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-44/I-235/CREEK UNDER
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 19.394,  Lanes on structure: 1,  Lanes under structure: 8,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 29621,  Location: I-44 & I-235 JCT (Lat: 35.526386,  Lng: -97.514281),  Route carried "under" structure: Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 92,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-44/I-235/CREEK UNDER
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 19.394,  Lanes on structure: 1,  Lanes under structure: 8,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 29621,  Location: I-44 & I-235 JCT (Lat: 35.526386,  Lng: -97.514281),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-44/I-235/CREEK UNDER
Minimum Vertical Clearance: 6.23m (20.44ft),  Kilometerpoint: 19.394,  Lanes on structure: 1,  Lanes under structure: 2,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 29621,  Location: I-44 & I-235 JCT (Lat: 35.526386,  Lng: -97.514281),  Route carried "under" structure: Ramp Interstate 235,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-44/I-235/CREEK UNDER
Minimum Vertical Clearance: 16.85m (55.28ft),  Kilometerpoint: 19.394,  Lanes on structure: 1,  Lanes under structure: 1,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 29621,  Location: I-44 & I-235 JCT (Lat: 35.526386,  Lng: -97.514281),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-44/I-235/CREEK UNDER
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 19.394,  Lanes on structure: 1,  Lanes under structure: 1,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 29622,  Location: I-44 & I-235 JCT (Lat: 35.528586,  Lng: -97.516381),  Route carried "under" structure: Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 92,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-235/I-44 UNDER
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 19.394,  Lanes on structure: 2,  Lanes under structure: 8,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.3m (158.5ft)

Find on map >>   Show street view

Structure Number: 29622,  Location: I-44 & I-235 JCT (Lat: 35.528586,  Lng: -97.516381),  Route carried "under" structure: Interstate 235,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 75,510 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-235/I-44 UNDER,  Facility Carried by Structure: I-44 EB TO U.S. 77
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 19.394,  Lanes on structure: 2,  Lanes under structure: 8,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.3m (158.5ft)

Find on map >>   Show street view

Structure Number: 29622,  Location: I-44 & I-235 JCT (Lat: 35.528586,  Lng: -97.516381),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-235/I-44 UNDER
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 19.394,  Lanes on structure: 2,  Lanes under structure: 1,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.3m (158.5ft)

Find on map >>   Show street view

Structure Number: 29623,  Location: I-44 & I-235 JCT (Lat: 35.528586,  Lng: -97.516381),  Route carried "under" structure: Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 46,150 (year 2020),  Truck Traffic: 13%,  Features Intersected: I-44/LINCOLN RAMPS UNDER
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 19.525,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 29623,  Location: I-44 & I-235 JCT (Lat: 35.528586,  Lng: -97.516381),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-44/LINCOLN RAMPS UNDER
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 19.525,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 29623,  Location: I-44 & I-235 JCT (Lat: 35.528586,  Lng: -97.516381),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-44/LINCOLN RAMPS UNDER
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 19.525,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 29669,  Location: .6S OF SW 44 (Lat: 35.411667,  Lng: -97.601111),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 20,125 (year 2020),  Truck Traffic: 5%,  Features Intersected: SW 54TH ST UNDER,  Facility Carried by Structure: S MERIDIAN AVE SB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 2967,  Location: .6S OF SW 44 (Lat: 35.411667,  Lng: -97.601111),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 20,125 (year 2020),  Truck Traffic: 5%,  Features Intersected: SW 54TH ST UNDER,  Facility Carried by Structure: S MERIDIAN AVE (NB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 29949,  Location: 6 E CANADIAN C\L (Lat: 35.460506,  Lng: -97.565922),  Route carried "under" structure: City street 9301,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 7%,  Features Intersected: MAY AVE UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 9.606,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 3006,  Location: 4.7 N I-40 (Lat: 35.522375,  Lng: -97.516344),  Route carried "under" structure: Interstate 235,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 80,600 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-235/ R.R./ CREEK UNDER,  Facility Carried by Structure: NW 50TH ST.
Minimum Vertical Clearance: 19.20m (62.99ft),  Kilometerpoint: 12.170,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Mixed types,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: 30229,  Location: .5 E OF MAY AVE. (Lat: 35.461950,  Lng: -97.556203),  Route carried "under" structure: City street ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: AGNEW AVE. UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 30424,  Location: JCT I-40 & S.H. 4 (Lat: 35.467778,  Lng: -97.724722),  Route carried "under" structure: Interstate 40,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 59,500 (year 2020),  Truck Traffic: 43%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: S.H. 4
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 55.077,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 3072,  Location: 5.1 N I-40 (Lat: 35.529558,  Lng: -97.514011),  Route carried "under" structure: Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 75,510 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-44 UNDER,  Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 12.117,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.4m (135.8ft)

Find on map >>   Show street view

Structure Number: 31105,  Location: 11.2 MI N E JCT I-35 (Lat: 35.637222,  Lng: -97.233056),  Route carried "under" structure: Interstate 44,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 24,900 (year 2020),  Truck Traffic: 36%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: HOGBACK RD (5580C)
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 18.182,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.5m (152.6ft)

Find on map >>   Show street view

Structure Number: 31181,  Location: 1 N. JCT KILPATRICK TP (Lat: 35.623056,  Lng: -97.586194),  Route carried "under" structure: Ramp State highway 74,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: N.W. 150TH UNDER
Minimum Vertical Clearance: 6.60m (21.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 31181,  Location: 1 N. JCT KILPATRICK TP (Lat: 35.623056,  Lng: -97.586194),  Route carried "under" structure: Ramp State highway 74,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: N.W. 150TH UNDER
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 31181,  Location: 1 N. JCT KILPATRICK TP (Lat: 35.623056,  Lng: -97.586194),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: N.W. 150TH UNDER,  Facility Carried by Structure: S.H. 74
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 31182,  Location: 1 N JCT KILPATRICK TP (Lat: 35.623056,  Lng: -97.585833),  Route carried "under" structure: Ramp State highway 74,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: N.W. 150TH UNDER
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 31182,  Location: 1 N JCT KILPATRICK TP (Lat: 35.623056,  Lng: -97.585833),  Route carried "under" structure: Ramp State highway 74,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: N.W. 150TH UNDER
Minimum Vertical Clearance: 6.60m (21.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 31182,  Location: 1 N JCT KILPATRICK TP (Lat: 35.623056,  Lng: -97.585833),  Route carried "under" structure: City street ,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: N.W. 150TH UNDER,  Facility Carried by Structure: S.H. 74
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 31379,  Location: 1.2 E JCT I-240 (Lat: 35.392778,  Lng: -97.265000),  Route carried "under" structure: City street 9661,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 7,800 (year 2020),  Truck Traffic: 5%,  Features Intersected: CHOCTAW RD. UNDER,  Facility Carried by Structure: I-40
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 21.239,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 3138,  Location: 1.2 E JCT I-240 (Lat: 35.392500,  Lng: -97.264722),  Route carried "under" structure: City street 9661,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 7,800 (year 2020),  Truck Traffic: 5%,  Features Intersected: CHOCTAW RD. UNDER,  Facility Carried by Structure: I-40
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 21.239,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 31829,  Location: 3.3 E JCT I-240 (Lat: 35.384167,  Lng: -97.230278),  Route carried "under" structure: Interstate 40,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 46,100 (year 2020),  Truck Traffic: 36%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: TRIPLE X ROAD
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 24.538,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 31832,  Location: 4.3 E JCT I-240 (Lat: 35.384444,  Lng: -97.212778),  Route carried "under" structure: County highway ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 5,060 (year 2020),  Truck Traffic: 6%,  Features Intersected: PEEBLY ROAD UNDER,  Facility Carried by Structure: I-40
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 32065,  Location: 5.3 E JCT I-240 (Lat: 35.383889,  Lng: -97.195000),  Route carried "under" structure: Ramp Other road 40,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,180 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: LUTHER RD.
Minimum Vertical Clearance: 6.80m (22.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32065,  Location: 5.3 E JCT I-240 (Lat: 35.383889,  Lng: -97.195000),  Route carried "under" structure: Ramp Other road 40,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,180 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: LUTHER RD.
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32065,  Location: 5.3 E JCT I-240 (Lat: 35.383889,  Lng: -97.195000),  Route carried "under" structure: Interstate 40,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 46,100 (year 2020),  Truck Traffic: 36%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: LUTHER RD.
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 44.667,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32094,  Location: 4.6 E JCT I-40 (Lat: 35.532758,  Lng: -97.460039),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: DEEP FORK CR. SERVICE RD,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 32095,  Location: 4.6 N JCT I-40 (Lat: 35.532850,  Lng: -97.459567),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Features Intersected: DEEP FORK CR. SERVICE RD,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 32364,  Location: 4E OF JCT I-35 (Lat: 35.391294,  Lng: -97.423731),  Route carried "under" structure: Interstate 240,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 17,050 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-240 UNDER,  Facility Carried by Structure: S.H. 77H SOONER RD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 22.217,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.9m (127.6ft)

Find on map >>   Show street view

Structure Number: 32404,  Location: .4W OF S LUTHER RD (Lat: 35.420686,  Lng: -97.202222),  Route carried "under" structure: Interstate ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 30,400 (year 2020),  Truck Traffic: 12%,  Features Intersected: KICKAPOO TP UNDER,  Facility Carried by Structure: SE 44TH ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 7.096,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.5m (116.5ft)

Find on map >>   Show street view

Structure Number: 32412,  Location: .63W N LUTHER & NE 122ND (Lat: 35.593986,  Lng: -97.204964),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 7%,  Features Intersected: NE 122ND ST UNDER,  Facility Carried by Structure: KICKAPOO TP NB
Minimum Vertical Clearance: 6.72m (22.05ft),  Kilometerpoint: 41.069,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 32413,  Location: .63W N LUTHER & NE 122ND (Lat: 35.593986,  Lng: -97.205375),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 7%,  Features Intersected: NE 122ND ST UNDER,  Facility Carried by Structure: KICKAPOO TP SB
Minimum Vertical Clearance: 6.72m (22.05ft),  Kilometerpoint: 41.069,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 32414,  Location: .63W N LUTHER&E MEMORIAL (Lat: 35.608750,  Lng: -97.205542),  Route carried "under" structure: Interstate ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 30,400 (year 2020),  Truck Traffic: 12%,  Features Intersected: KICKAPOO TP UNDER,  Facility Carried by Structure: NE136TH/E MEMORIAL
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 41.639,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 32425,  Location: 1.4E PEEBLY RD & I-40 (Lat: 35.384444,  Lng: -97.187500),  Route carried "under" structure: Interstate ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 10,354 (year 2020),  Features Intersected: I-40 UNDER,  Facility Carried by Structure: KICKAPOO NB RP E-N
Minimum Vertical Clearance: 6.33m (20.77ft),  Kilometerpoint: 45.445,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 32426,  Location: 1.4E PEEBLY RD &1-40 (Lat: 35.384444,  Lng: -97.187778),  Route carried "under" structure: Interstate ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 10,354 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: KICKAPOO TP
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 45.704,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 32428,  Location: 35.3 E. of CADDO Co line (Lat: 35.460497,  Lng: -97.706908),  Route carried "under" structure: Ramp Other road ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 5,950 (year 2020),  Truck Traffic: 10%,  Features Intersected: I-40 KILPATRICK TP RAMPS,  Facility Carried by Structure: SARA RD.
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 56.910,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32428,  Location: 35.3 E. of CADDO Co line (Lat: 35.460497,  Lng: -97.706908),  Route carried "under" structure: ServiceOther road ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-40 KILPATRICK TP RAMPS,  Facility Carried by Structure: SARA RD.
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 91.588,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32428,  Location: 35.3 E. of CADDO Co line (Lat: 35.460497,  Lng: -97.706908),  Route carried "under" structure: ServiceOther road ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-40 KILPATRICK TP RAMPS,  Facility Carried by Structure: SARA RD.
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 91.588,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32428,  Location: 35.3 E. of CADDO Co line (Lat: 35.460497,  Lng: -97.706908),  Route carried "under" structure: Ramp Other road ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 5,950 (year 2020),  Truck Traffic: 10%,  Features Intersected: I-40 KILPATRICK TP RAMPS,  Facility Carried by Structure: SARA RD.
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 56.910,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32428,  Location: 35.3 E. of CADDO Co line (Lat: 35.460497,  Lng: -97.706908),  Route carried "under" structure: Interstate 40,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 59,500 (year 2020),  Truck Traffic: 43%,  Features Intersected: I-40 KILPATRICK TP RAMPS,  Facility Carried by Structure: SARA RD.
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 56.910,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 32436,  Location: .8N OF I-40 (Lat: 35.395833,  Lng: -97.195000),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 7%,  Features Intersected: LUTHER RD UNDER,  Facility Carried by Structure: KICKAPOO TP SB
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 2.382,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 32437,  Location: .8N OF I-40 (Lat: 35.395000,  Lng: -97.195000),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 7%,  Features Intersected: LUTHER RD UNDER,  Facility Carried by Structure: KICKAPOO TP NB
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 2.382,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 32438,  Location: 1.5N I-40 .38W LUTHER RD (Lat: 35.406111,  Lng: -97.201944),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 7%,  Features Intersected: SE 59TH ST UNDER,  Facility Carried by Structure: KICKAPOO TP SB
Minimum Vertical Clearance: 6.29m (20.64ft),  Kilometerpoint: 4.453,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 32439,  Location: 1.5N I-40 .38W LUTHER RD (Lat: 35.406111,  Lng: -97.201667),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 7%,  Features Intersected: SE 59TH ST UNDER,  Facility Carried by Structure: KICKAPOO TP NB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 4.453,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Oklahoma City, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.