Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oklahoma City, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,901Number of bridges
  • 21,391ft / 6,520mTotal length
  • $2,061,419,000Total costs
  • 30,433,195Total average daily traffic
  • 3,708,300Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oklahoma City
  • No street view available for this location

New bridges in Oklahoma City, OK - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71910-1919
  • 541920-1929
  • 491930-1939
  • 1831940-1949
  • 1481950-1959
  • 2111960-1969
  • 2811970-1979
  • 2861980-1989
  • 2571990-1999
  • 2292000-2009
  • 1382010-2019
  • 572020-2022
Reconstructed bridges in Oklahoma City, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 61950-1959
  • 151960-1969
  • 231970-1979
  • 521980-1989
  • 421990-1999
  • 372000-2009
  • 182010-2019
  • 22020-2022
Average Bridge Truck Traffic in Oklahoma City, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.0%Excellent
  • 44.8%Very good
  • 27.4%Good
  • 13.4%Satisfactory
  • 2.0%Fair
  • 3.1%Poor
  • 0.5%Serious
  • 3.1%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.1%Excellent
  • 26.6%Very good
  • 27.4%Good
  • 24.7%Satisfactory
  • 12.6%Fair
  • 2.1%Poor
  • 3.1%Serious
  • 0.5%Critical
  • 3.1%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.3%Excellent
  • 14.8%Very good
  • 29.6%Good
  • 23.4%Satisfactory
  • 20.5%Fair
  • 6.5%Poor
  • 3.1%Serious
  • 0.7%Critical
  • 3.1%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.3%Excellent
  • 19.5%Very good
  • 25.1%Good
  • 28.1%Satisfactory
  • 17.4%Fair
  • 5.3%Poor
  • 1.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 0.2%Excellent
  • 10.6%Very good
  • 38.1%Good
  • 38.9%Satisfactory
  • 7.7%Fair
  • 1.2%Poor
  • 3.4%Serious
Find on map >>   Show street view

Structure Number: 25831,  Location: .1E OF SE25/SANTA FE (Lat: 35.439225,  Lng: -97.512139),  Route carried "on" structure: City street E1080,  Year Built: 1973,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,440 (year 2040),  Design Load: HS 20,  Features Intersected: LIGHTNING CREEK,  Facility Carried by Structure: E1087 (SE 25TH)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.13m (20.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 2584,  Location: 0.1 W OF WESTWOOD (Lat: 35.442378,  Lng: -97.544506),  Route carried "on" structure: City street E1085,  Year Built: 1999,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,920 (year 2040),  Design Load: HS 20,  Features Intersected: BROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.78m (18.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 25841,  Location: 260' N SW 22 (Lat: 35.443261,  Lng: -97.544058),  Route carried "on" structure: City street N3062,  Year Built: 1999,  Status: Open,  Structure Length: 2.72m (8.92ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,400 (year 2040),  Design Load: HS 20,  Features Intersected: BROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 25847,  Location: 125.69 (Lat: 35.609931,  Lng: -97.593919),  Route carried "on" structure: ServiceCity street ,  Year Built: 1999,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: CROSSOVER#2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.205,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $746,000,  Total Project Cost: $1,428,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25849,  Location: 125.19EB (Lat: 35.609494,  Lng: -97.602575),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 15,950 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,520 (year 2040),  Design Load: HS 20,  Features Intersected: MERIDIAN AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.738,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $704,000,  Total Project Cost: $1,349,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2585,  Location: 125.19WB (Lat: 35.609806,  Lng: -97.602578),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 16,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,760 (year 2040),  Design Load: HS 20,  Features Intersected: MERIDIAN AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.738,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $704,000,  Total Project Cost: $1,349,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25851,  Location: 125.04WB (Lat: 35.609789,  Lng: -97.605175),  Route carried "on" structure: Other road ,  Year Built: 1999,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 15,950 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,520 (year 2040),  Design Load: HS 20,  Features Intersected: BLUFF CREEK,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.251,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $737,000,  Roadway Improvement Cost: $1,106,000,  Total Project Cost: $2,108,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25852,  Location: 125.04EB (Lat: 35.609475,  Lng: -97.605175),  Route carried "on" structure: Other road ,  Year Built: 1999,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 16,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,760 (year 2040),  Design Load: HS 20,  Features Intersected: BLUFF CREEK,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.251,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $737,000,  Roadway Improvement Cost: $1,106,000,  Total Project Cost: $2,108,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25853,  Location: 124.64 (Lat: 35.609914,  Lng: -97.612517),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: MARTIN PARK CROSS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.895,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $746,000,  Total Project Cost: $1,428,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25854,  Location: 124.18 (Lat: 35.609614,  Lng: -97.620614),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: MACARTHUR BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.619,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 24 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $1,413,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25855,  Location: 123.68 (Lat: 35.608842,  Lng: -97.629467),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 3.25m (10.66ft),  Average Daily Traffic: 16,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,760 (year 2040),  Design Load: HS 20,  Features Intersected: BRANDON PL. UNDER,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.649,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.5m (106.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.25m (10.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $726,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25856,  Location: 123.68WB (Lat: 35.609219,  Lng: -97.629464),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 15,950 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,520 (year 2040),  Design Load: HS 20,  Features Intersected: BRANDON PL. UNDER,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.649,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $377,000,  Total Project Cost: $729,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25857,  Location: 123.18 (Lat: 35.609675,  Lng: -97.638419),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 6.51m (21.36ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: ROCKWELL AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.245,  Lanes on structure: 5,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.5m (106.6ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.51m (21.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $752,000,  Total Project Cost: $1,439,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25858,  Location: 122.28N.F. (Lat: 35.610617,  Lng: -97.654117),  Route carried "on" structure: ServiceCity street ,  Year Built: 2000,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: KILPATRICK FRTG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.275,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.2m (79.4ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.51m (27.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $981,000,  Total Project Cost: $1,873,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25859,  Location: 122.28EB (Lat: 35.609806,  Lng: -97.654214),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 4.68m (15.35ft),  Average Daily Traffic: 15,950 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,520 (year 2040),  Design Load: HS 20,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.275,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.82m (25.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $601,000,  Roadway Improvement Cost: $902,000,  Total Project Cost: $1,723,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2586,  Location: 122.28WB (Lat: 35.610122,  Lng: -97.654350),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 4.68m (15.35ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.275,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.82m (25.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $601,000,  Roadway Improvement Cost: $902,000,  Total Project Cost: $1,723,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25861,  Location: 122.18 (Lat: 35.610283,  Lng: -97.656189),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 6.51m (21.36ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: COUNCIL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.852,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.5m (106.6ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.51m (21.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $752,000,  Total Project Cost: $1,439,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25862,  Location: 121.43 (Lat: 35.610000,  Lng: -97.669192),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 10,350 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,560 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.027,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $692,000,  Roadway Improvement Cost: $1,038,000,  Total Project Cost: $1,980,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25863,  Location: 121.43WB (Lat: 35.610314,  Lng: -97.669206),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.027,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $692,000,  Roadway Improvement Cost: $1,038,000,  Total Project Cost: $1,980,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25864,  Location: 121.17 (Lat: 35.609669,  Lng: -97.673969),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: COUNTY LINE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.478,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $1,456,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25865,  Location: 119.90 (Lat: 35.594989,  Lng: -97.687792),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.060,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $1,456,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25867,  Location: 118.87NB (Lat: 35.580303,  Lng: -97.688747),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 10,350 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,560 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.92m (22.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,065,000,  Roadway Improvement Cost: $1,598,000,  Total Project Cost: $3,038,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25868,  Location: 118.87SB (Lat: 35.580489,  Lng: -97.689172),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.94m (22.77ft),  Average Daily Traffic: 10,450 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,720 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.94m (22.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,070,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,650,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25869,  Location: 117.88 (Lat: 35.565753,  Lng: -97.689389),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.325,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $809,000,  Total Project Cost: $1,546,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2587,  Location: 116.87 (Lat: 35.551139,  Lng: -97.689419),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: WILSHIRE BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $1,456,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25871,  Location: 116.33SB (Lat: 35.547750,  Lng: -97.689267),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 95.77m (314.21ft),  Average Daily Traffic: 11,200 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,920 (year 2040),  Design Load: HS 20,  Features Intersected: N. CANADIAN RIVER,  Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.782,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 95.79m (314.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,373,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $9,799,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25872,  Location: 116.33NB (Lat: 35.547569,  Lng: -97.688883),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 95.77m (314.21ft),  Average Daily Traffic: 11,350 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,160 (year 2040),  Design Load: HS 20,  Features Intersected: N. CANADIAN RIVER,  Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.782,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 95.79m (314.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,373,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $9,799,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25873,  Location: 115.08SB (Lat: 35.529511,  Lng: -97.697444),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 60.95m (199.97ft),  Average Daily Traffic: 11,200 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,920 (year 2040),  Design Load: HS 20,  Features Intersected: N. CANADIAN RIVER O'FLOW,  Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 60.95m (199.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,691,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $6,756,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25874,  Location: 115.08NB (Lat: 35.529508,  Lng: -97.697064),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 60.95m (199.97ft),  Average Daily Traffic: 11,350 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,160 (year 2040),  Design Load: HS 20,  Features Intersected: N. CANADIAN RIVER O'FLOW,  Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 60.95m (199.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,691,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $6,756,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25875,  Location: 116.11 (Lat: 35.536819,  Lng: -97.694794),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 63RD ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.657,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 85.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $596,000,  Roadway Improvement Cost: $894,000,  Total Project Cost: $1,708,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25876,  Location: 114.77 (Lat: 35.522319,  Lng: -97.697628),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 6.26m (20.54ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 50TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.314,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.26m (20.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $723,000,  Total Project Cost: $1,384,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25877,  Location: 114.28SB (Lat: 35.515497,  Lng: -97.697497),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 10,400 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,640 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 66 UNDER,  Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.815,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $839,000,  Total Project Cost: $1,604,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25878,  Location: 114.28NB (Lat: 35.515497,  Lng: -97.697114),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 11,350 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,160 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 66 UNDER,  Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.815,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $839,000,  Total Project Cost: $1,604,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25879,  Location: 113.77SB (Lat: 35.508031,  Lng: -97.697581),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 4.98m (16.34ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,000 (year 2040),  Design Load: HS 20,  Features Intersected: NW 36TH ST. UNDER,  Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.908,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 78.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.98m (16.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $576,000,  Total Project Cost: $1,106,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2588,  Location: 113.77NB (Lat: 35.508031,  Lng: -97.697167),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 4.98m (16.34ft),  Average Daily Traffic: 10,050 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,080 (year 2040),  Design Load: HS 20,  Features Intersected: NW 36TH ST. UNDER,  Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.908,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 78.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.98m (16.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $576,000,  Total Project Cost: $1,106,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25881,  Location: 112.48 (Lat: 35.493386,  Lng: -97.710947),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 23RD ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.982,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.4m (109.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 59.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.68m (21.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $514,000,  Roadway Improvement Cost: $771,000,  Total Project Cost: $1,475,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Oklahoma City, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.