Bridge Statistics for Oklahoma City, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 1,901Number of bridges
- 21,391ft / 6,520mTotal length
- $2,061,419,000Total costs
- 30,433,195Total average daily traffic
- 3,708,300Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Oklahoma City
- No street view available for this location
- New bridges - historical statistics
- 11900-1909
- 71910-1919
- 541920-1929
- 491930-1939
- 1831940-1949
- 1481950-1959
- 2111960-1969
- 2811970-1979
- 2861980-1989
- 2571990-1999
- 2292000-2009
- 1382010-2019
- 572020-2022
- Reconstructed bridges - Historical Statistics
- 21940-1949
- 61950-1959
- 151960-1969
- 231970-1979
- 521980-1989
- 421990-1999
- 372000-2009
- 182010-2019
- 22020-2022
- Bridge Condition - Deck
- 9.0%Excellent
- 44.8%Very good
- 27.4%Good
- 13.4%Satisfactory
- 2.0%Fair
- 3.1%Poor
- 0.5%Serious
- 3.1%Failed
- Bridge Condition - Superstructure
- 3.1%Excellent
- 26.6%Very good
- 27.4%Good
- 24.7%Satisfactory
- 12.6%Fair
- 2.1%Poor
- 3.1%Serious
- 0.5%Critical
- 3.1%Failed
- Bridge Condition - Substructure
- 1.3%Excellent
- 14.8%Very good
- 29.6%Good
- 23.4%Satisfactory
- 20.5%Fair
- 6.5%Poor
- 3.1%Serious
- 0.7%Critical
- 3.1%Failed
- Bridge Condition - Channel
- 3.3%Excellent
- 19.5%Very good
- 25.1%Good
- 28.1%Satisfactory
- 17.4%Fair
- 5.3%Poor
- 1.1%Serious
- Bridge Condition - Culverts
- 0.2%Excellent
- 10.6%Very good
- 38.1%Good
- 38.9%Satisfactory
- 7.7%Fair
- 1.2%Poor
- 3.4%Serious
Find on map >> Show street view
Structure Number: 19109, Location: 4.2 MI N I-240 (Lat: 35.453722, Lng: -97.572728), Route carried "under" structure: City street , Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 24 (year 2020), Truck Traffic: 5%, Features Intersected: OKLAHOMA RIVER/ CO. RD., Facility Carried by Structure: I-44 S.B.
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 6.854, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 19109, Location: 4.2 MI N I-240 (Lat: 35.453722, Lng: -97.572728), Route carried "under" structure: City street , Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 24 (year 2020), Truck Traffic: 5%, Features Intersected: OKLAHOMA RIVER/ CO. RD., Facility Carried by Structure: I-44 S.B.
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 6.854, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Ramp Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E, Facility Carried by Structure: I-40 W-N RAMP
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.032, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Ramp Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E, Facility Carried by Structure: I-40 W-N RAMP
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.032, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Ramp Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E, Facility Carried by Structure: I-40 W-N RAMP
Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 0.032, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Ramp Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E, Facility Carried by Structure: I-40 W-N RAMP
Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 0.032, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Interstate 40, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 56,150 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 8.496, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Interstate 40, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 56,150 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 8.496, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 70,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E, Facility Carried by Structure: I-40 W-N RAMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.016, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 1911, Location: 5.2 MI E C/L (Lat: 35.460131, Lng: -97.578372), Route carried "under" structure: Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 70,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /I-44/RMPS S-W/ N-E, Facility Carried by Structure: I-40 W-N RAMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.016, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Ramp Interstate 40, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 8.673, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Ramp Interstate 40, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 8.673, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Ramp Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W, Facility Carried by Structure: I-40 RAMP E-S
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 8.673, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Ramp Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W, Facility Carried by Structure: I-40 RAMP E-S
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 8.673, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 125,600 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W, Facility Carried by Structure: I-40 RAMP E-S
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 7.321, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Interstate 44, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 125,600 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W, Facility Carried by Structure: I-40 RAMP E-S
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 7.321, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Interstate 40, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 49,400 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W
Minimum Vertical Clearance: 5.09m (16.70ft), Kilometerpoint: 8.673, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 19111, Location: 5.3 MI E CANADIAN C/L (Lat: 35.458022, Lng: -97.574531), Route carried "under" structure: Interstate 40, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 49,400 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 /I-40/ RAMP E-S&S-W
Minimum Vertical Clearance: 5.09m (16.70ft), Kilometerpoint: 8.673, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street 3A, Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 9.172, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street 3A, Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 9.172, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 6.50m (21.33ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 6.50m (21.33ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19513, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.521542, Lng: -97.542769), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/ CREEK/ ST. UND, Facility Carried by Structure: I-44 W.B.
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 9.172, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 4.91m (16.11ft), Kilometerpoint: 9.172, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 6.50m (21.33ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 6.50m (21.33ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 9.413, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 9.413, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: Ramp Interstate 44, Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 9.413, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: Ramp Interstate 44, Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 9.413, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 9.413, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 19514, Location: 5.6N OF I-40(BELLE ISLE (Lat: 35.520783, Lng: -97.542767), Route carried "under" structure: City street , Year Built: 1978, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 7%, Features Intersected: NW EXPWY/CREEK/ST.UND, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 9.413, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 19775, Location: 6.4 MI N OF I-40 (Lat: 35.524172, Lng: -97.532619), Route carried "under" structure: State highway , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 200 (year 2020), Truck Traffic: 7%, Features Intersected: SE RAMP UNDER, Facility Carried by Structure: I-44 RAMP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.298, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 19775, Location: 6.4 MI N OF I-40 (Lat: 35.524172, Lng: -97.532619), Route carried "under" structure: State highway , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 200 (year 2020), Truck Traffic: 7%, Features Intersected: SE RAMP UNDER, Facility Carried by Structure: I-44 RAMP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.298, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 19777, Location: 4.7 MI N OF I-40 (Lat: 35.511917, Lng: -97.552969), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 300 (year 2020), Truck Traffic: 5%, Features Intersected: YOUNG BLVD. UNDER, Facility Carried by Structure: I-44
Minimum Vertical Clearance: 4.68m (15.35ft), Kilometerpoint: 7.675, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 13.7m (44.9ft)
Structure Number: 19777, Location: 4.7 MI N OF I-40 (Lat: 35.511917, Lng: -97.552969), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 300 (year 2020), Truck Traffic: 5%, Features Intersected: YOUNG BLVD. UNDER, Facility Carried by Structure: I-44
Minimum Vertical Clearance: 4.68m (15.35ft), Kilometerpoint: 7.675, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 13.7m (44.9ft)
Find on map >> Show street view
Structure Number: 19778, Location: 4.05 MI N&E JCT I40 (Lat: 35.511225, Lng: -97.565828), Route carried "under" structure: Interstate 44, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 76,100 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 UNDER, Facility Carried by Structure: MAY AVE.
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 6.548, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.9m (62.0ft)
Structure Number: 19778, Location: 4.05 MI N&E JCT I40 (Lat: 35.511225, Lng: -97.565828), Route carried "under" structure: Interstate 44, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 76,100 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 UNDER, Facility Carried by Structure: MAY AVE.
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 6.548, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.9m (62.0ft)
Find on map >> Show street view
Structure Number: 19786, Location: 6.4 MI N OF I-40 (Lat: 35.524269, Lng: -97.532600), Route carried "under" structure: Ramp State highway 44, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: E-S RAMP UNDER
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.298, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.7m (67.9ft)
Structure Number: 19786, Location: 6.4 MI N OF I-40 (Lat: 35.524269, Lng: -97.532600), Route carried "under" structure: Ramp State highway 44, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: E-S RAMP UNDER
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.298, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.7m (67.9ft)
Find on map >> Show street view
Structure Number: 19812, Location: 6.5 MI N & E JCT I40 (Lat: 35.525575, Lng: -97.529956), Route carried "under" structure: Interstate 44, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 93,600 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 UNDER, Facility Carried by Structure: WESTERN AVE.
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 10.572, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.7m (117.1ft)
Structure Number: 19812, Location: 6.5 MI N & E JCT I40 (Lat: 35.525575, Lng: -97.529956), Route carried "under" structure: Interstate 44, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 93,600 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 UNDER, Facility Carried by Structure: WESTERN AVE.
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 10.572, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.7m (117.1ft)
Find on map >> Show street view
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 107,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 14.497, Lanes on structure: 6, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 107,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 14.497, Lanes on structure: 6, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: Ramp Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 14.497, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: Ramp Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 14.497, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 25 (year 2020), Truck Traffic: 5%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 6.58m (21.59ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 25 (year 2020), Truck Traffic: 5%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 6.58m (21.59ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: Ramp Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 14.497, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 19832, Location: .4 S OF SHIELDS/RENO (Lat: 35.458047, Lng: -97.513439), Route carried "under" structure: Ramp Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/ 7 ST. & R.R. UNDER, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 14.497, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 35, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 120,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 5.52m (18.11ft), Kilometerpoint: 11.248, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 35, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 120,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 5.52m (18.11ft), Kilometerpoint: 11.248, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 5.52m (18.11ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 5.52m (18.11ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 7.35m (24.11ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 40, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 7.35m (24.11ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 35, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 120,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 7.28m (23.88ft), Kilometerpoint: 11.248, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Interstate 35, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 120,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 7.28m (23.88ft), Kilometerpoint: 11.248, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Ramp Interstate 35, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 11.248, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 19839, Location: 2.2 MI E OF OLD US 77 (Lat: 35.463883, Lng: -97.473225), Route carried "under" structure: Ramp Interstate 35, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35/ I-40/ RIVER UP RR, Facility Carried by Structure: FAU 9460 (RENO AVE
Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 11.248, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 1984, Location: .9 MI N OF SW29/SHIELDS (Lat: 35.449858, Lng: -97.513839), Route carried "under" structure: City street 9440, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 100 (year 2020), Truck Traffic: 5%, Features Intersected: ST. RIVER/BNSF R.R. UND, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 1984, Location: .9 MI N OF SW29/SHIELDS (Lat: 35.449858, Lng: -97.513839), Route carried "under" structure: City street 9440, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 100 (year 2020), Truck Traffic: 5%, Features Intersected: ST. RIVER/BNSF R.R. UND, Facility Carried by Structure: SHIELDS BLVD.
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 1984, Location: .9 MI N OF SW29/SHIELDS (Lat: 35.449858, Lng: -97.513839), Route carried "under" structure: Bypass City street S, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 100 (year 2020), Truck Traffic: 5%, Features Intersected: ST. RIVER/BNSF R.R. UND
Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 1984, Location: .9 MI N OF SW29/SHIELDS (Lat: 35.449858, Lng: -97.513839), Route carried "under" structure: Bypass City street S, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 100 (year 2020), Truck Traffic: 5%, Features Intersected: ST. RIVER/BNSF R.R. UND
Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 20308, Location: 0.6 MI N I-44 (Lat: 35.550986, Lng: -97.456650), Route carried "under" structure: Interstate 35, Year Built: 1982, Structure Length: 0. m, Average Daily Traffic: 85,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: WILSHIRE BLVD.
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 1.062, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.5m (93.5ft)
Structure Number: 20308, Location: 0.6 MI N I-44 (Lat: 35.550986, Lng: -97.456650), Route carried "under" structure: Interstate 35, Year Built: 1982, Structure Length: 0. m, Average Daily Traffic: 85,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: WILSHIRE BLVD.
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 1.062, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.5m (93.5ft)
Find on map >> Show street view
Structure Number: 20312, Location: 0.1 MI N I-44 (Lat: 35.543992, Lng: -97.458692), Route carried "under" structure: Interstate 35, Year Built: 1982, Structure Length: 0. m, Average Daily Traffic: 85,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: BRYANT AVE.
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.257, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 20312, Location: 0.1 MI N I-44 (Lat: 35.543992, Lng: -97.458692), Route carried "under" structure: Interstate 35, Year Built: 1982, Structure Length: 0. m, Average Daily Traffic: 85,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: BRYANT AVE.
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.257, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 20559, Location: 3.8 MI E OF I-44 (Lat: 35.392206, Lng: -97.506594), Route carried "under" structure: Interstate 240, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 108,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-240 UNDER, Facility Carried by Structure: FAU 9389 (SHIELDS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 6.210, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 20559, Location: 3.8 MI E OF I-44 (Lat: 35.392206, Lng: -97.506594), Route carried "under" structure: Interstate 240, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 108,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-240 UNDER, Facility Carried by Structure: FAU 9389 (SHIELDS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 6.210, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 20565, Location: 1.6 MI N OF JCT I44 (Lat: 35.565356, Lng: -97.451881), Route carried "under" structure: City street 1962, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 200 (year 2020), Truck Traffic: 5%, Features Intersected: BRITTON RD. UNDER, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 2.704, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 20565, Location: 1.6 MI N OF JCT I44 (Lat: 35.565356, Lng: -97.451881), Route carried "under" structure: City street 1962, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 200 (year 2020), Truck Traffic: 5%, Features Intersected: BRITTON RD. UNDER, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 2.704, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 20566, Location: 1.6 MI N JCT I44 (Lat: 35.565356, Lng: -97.451300), Route carried "under" structure: City street 1962, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 200 (year 2020), Truck Traffic: 5%, Features Intersected: BRITTON RD. UNDER, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 2.704, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 20566, Location: 1.6 MI N JCT I44 (Lat: 35.565356, Lng: -97.451300), Route carried "under" structure: City street 1962, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 200 (year 2020), Truck Traffic: 5%, Features Intersected: BRITTON RD. UNDER, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 2.704, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 20575, Location: 2.8 MI N OF SW 59TH ST (Lat: 35.449458, Lng: -97.521264), Route carried "under" structure: City street , Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 100 (year 2020), Truck Traffic: 5%, Features Intersected: N. CANADIAN RIVER/ ST, Facility Carried by Structure: N3075 S WALKER AVE
Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 20575, Location: 2.8 MI N OF SW 59TH ST (Lat: 35.449458, Lng: -97.521264), Route carried "under" structure: City street , Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 100 (year 2020), Truck Traffic: 5%, Features Intersected: N. CANADIAN RIVER/ ST, Facility Carried by Structure: N3075 S WALKER AVE
Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 20846, Location: 2.8 MI N I-44 & I-35 (Lat: 35.579872, Lng: -97.442022), Route carried "under" structure: City street , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 600 (year 2020), Truck Traffic: 5%, Features Intersected: 108TH ST. UNDER, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 4.537, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 20846, Location: 2.8 MI N I-44 & I-35 (Lat: 35.579872, Lng: -97.442022), Route carried "under" structure: City street , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 600 (year 2020), Truck Traffic: 5%, Features Intersected: 108TH ST. UNDER, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 4.537, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 20847, Location: 2.8 MI N I-44 & I-35 (Lat: 35.579869, Lng: -97.442711), Route carried "under" structure: City street , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 600 (year 2020), Truck Traffic: 5%, Features Intersected: HEFNER RD. UNDER, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 4.537, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 20847, Location: 2.8 MI N I-44 & I-35 (Lat: 35.579869, Lng: -97.442711), Route carried "under" structure: City street , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 600 (year 2020), Truck Traffic: 5%, Features Intersected: HEFNER RD. UNDER, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 4.537, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 20854, Location: 3.9 MI N I-35 & I-44 (Lat: 35.594558, Lng: -97.433411), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 85,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: N.E. 122 ST.
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 6.404, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 20854, Location: 3.9 MI N I-35 & I-44 (Lat: 35.594558, Lng: -97.433411), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 85,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: N.E. 122 ST.
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 6.404, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 20856, Location: 135.09E-S (Lat: 35.600422, Lng: -97.428678), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 31,640 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 NB UND/KILPTK TP OV, Facility Carried by Structure: KILPATRICK TP E-S
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.1m (148.0ft)
Structure Number: 20856, Location: 135.09E-S (Lat: 35.600422, Lng: -97.428678), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 31,640 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 NB UND/KILPTK TP OV, Facility Carried by Structure: KILPATRICK TP E-S
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.1m (148.0ft)
Find on map >> Show street view
Structure Number: 20857, Location: 4.7 MI N I-35 & I-44 (Lat: 35.603953, Lng: -97.426453), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 30,950 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 NB UNDER
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 7.594, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 20857, Location: 4.7 MI N I-35 & I-44 (Lat: 35.603953, Lng: -97.426453), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 30,950 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 NB UNDER
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 7.594, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 20861, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425000), Route carried "under" structure: Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP S-E UNDER, Facility Carried by Structure: SOONER RD. NB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 7.385, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.6m (152.9ft)
Structure Number: 20861, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425000), Route carried "under" structure: Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP S-E UNDER, Facility Carried by Structure: SOONER RD. NB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 7.385, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.6m (152.9ft)
Find on map >> Show street view
Structure Number: 20861, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425000), Route carried "under" structure: Ramp Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP S-E UNDER, Facility Carried by Structure: SOONER RD. NB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.6m (152.9ft)
Structure Number: 20861, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425000), Route carried "under" structure: Ramp Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP S-E UNDER, Facility Carried by Structure: SOONER RD. NB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.6m (152.9ft)
Find on map >> Show street view
Structure Number: 20861, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425000), Route carried "under" structure: Ramp Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP S-E UNDER, Facility Carried by Structure: SOONER RD. NB
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.6m (152.9ft)
Structure Number: 20861, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425000), Route carried "under" structure: Ramp Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP S-E UNDER, Facility Carried by Structure: SOONER RD. NB
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.6m (152.9ft)
Find on map >> Show street view
Structure Number: 20862, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425278), Route carried "under" structure: Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMPS S&N -E UNDER, Facility Carried by Structure: SOONER RD. SB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 7.369, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.0m (164.0ft)
Structure Number: 20862, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425278), Route carried "under" structure: Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMPS S&N -E UNDER, Facility Carried by Structure: SOONER RD. SB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 7.369, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.0m (164.0ft)
Find on map >> Show street view
Structure Number: 20862, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425278), Route carried "under" structure: Ramp Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMPS S&N -E UNDER, Facility Carried by Structure: SOONER RD. SB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.0m (164.0ft)
Structure Number: 20862, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425278), Route carried "under" structure: Ramp Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMPS S&N -E UNDER, Facility Carried by Structure: SOONER RD. SB
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.0m (164.0ft)
Find on map >> Show street view
Structure Number: 20862, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425278), Route carried "under" structure: Ramp Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMPS S&N -E UNDER, Facility Carried by Structure: SOONER RD. SB
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.0m (164.0ft)
Structure Number: 20862, Location: 4.5 MI N I-35 & I-44 (Lat: 35.598889, Lng: -97.425278), Route carried "under" structure: Ramp Other road , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMPS S&N -E UNDER, Facility Carried by Structure: SOONER RD. SB
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.0m (164.0ft)
Find on map >> Show street view
Structure Number: 21059, Location: 8.8 MI N & E I-40 (Lat: 35.534917, Lng: -97.494358), Route carried "under" structure: City street 9401, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 14.175, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Structure Number: 21059, Location: 8.8 MI N & E I-40 (Lat: 35.534917, Lng: -97.494358), Route carried "under" structure: City street 9401, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 14.175, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Find on map >> Show street view
Structure Number: 2106, Location: 8.8 MI N & E I-40 (Lat: 35.535339, Lng: -97.494356), Route carried "under" structure: City street 9401, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 14.175, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 2106, Location: 8.8 MI N & E I-40 (Lat: 35.535339, Lng: -97.494356), Route carried "under" structure: City street 9401, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 14.175, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 21088, Location: 9.3 MI N & E I-40 (Lat: 35.533544, Lng: -97.484717), Route carried "under" structure: City street , Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: GRAND BLVD UNDER, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 14.964, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 27.7m (90.9ft)
Structure Number: 21088, Location: 9.3 MI N & E I-40 (Lat: 35.533544, Lng: -97.484717), Route carried "under" structure: City street , Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: GRAND BLVD UNDER, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 14.964, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 27.7m (90.9ft)
Find on map >> Show street view
Structure Number: 2109, Location: 9.3 MI N & E I-40 (Lat: 35.533956, Lng: -97.485003), Route carried "under" structure: City street , Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: GRAND BLVD UNDER, Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 14.964, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 27.7m (90.9ft)
Structure Number: 2109, Location: 9.3 MI N & E I-40 (Lat: 35.533956, Lng: -97.485003), Route carried "under" structure: City street , Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 5%, Features Intersected: GRAND BLVD UNDER, Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 14.964, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Frame, Length of Maximum Span: 27.7m (90.9ft)
Find on map >> Show street view
Structure Number: 21092, Location: 1.0 MI N I-44 (Lat: 35.522092, Lng: -97.576347), Route carried "under" structure: State highway 74, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 114,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 50TH ST.
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 1.688, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft)
Structure Number: 21092, Location: 1.0 MI N I-44 (Lat: 35.522092, Lng: -97.576347), Route carried "under" structure: State highway 74, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 114,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 50TH ST.
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 1.688, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft)
Find on map >> Show street view
Structure Number: 21096, Location: 1.4 MI N I-44 (Lat: 35.527469, Lng: -97.577778), Route carried "under" structure: State highway 74, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 114,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 56TH ST.
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 2.301, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 21096, Location: 1.4 MI N I-44 (Lat: 35.527469, Lng: -97.577778), Route carried "under" structure: State highway 74, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 114,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 56TH ST.
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 2.301, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 21097, Location: 9.9 MI N & E I-40 (Lat: 35.536006, Lng: -97.476883), Route carried "under" structure: City street 9421, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: M. L. KING BLVD. UNDER, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 15.945, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 21097, Location: 9.9 MI N & E I-40 (Lat: 35.536006, Lng: -97.476883), Route carried "under" structure: City street 9421, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: M. L. KING BLVD. UNDER, Facility Carried by Structure: I-44 EB
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 15.945, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 21098, Location: 9.9 MI N & E I-40 (Lat: 35.536422, Lng: -97.476883), Route carried "under" structure: City street 9421, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: M. L. KING BLVD. UNDER, Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 15.945, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 21098, Location: 9.9 MI N & E I-40 (Lat: 35.536422, Lng: -97.476883), Route carried "under" structure: City street 9421, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: M. L. KING BLVD. UNDER, Facility Carried by Structure: I-44 WB
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 15.945, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 21343, Location: 5 MI N OF E JCT W/I40 (Lat: 35.539381, Lng: -97.460925), Route carried "under" structure: Interstate 44, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 47,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 W-N UNDER, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 17.152, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 21343, Location: 5 MI N OF E JCT W/I40 (Lat: 35.539381, Lng: -97.460925), Route carried "under" structure: Interstate 44, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 47,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-44 W-N UNDER, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 17.152, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 21686, Location: 2.1 MI N I-44 (Lat: 35.536628, Lng: -97.578317), Route carried "under" structure: State highway 74, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 102,800 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 63RD ST.
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 3.364, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.3m (96.1ft)
Structure Number: 21686, Location: 2.1 MI N I-44 (Lat: 35.536628, Lng: -97.578317), Route carried "under" structure: State highway 74, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 102,800 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 63RD ST.
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 3.364, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.3m (96.1ft)
Find on map >> Show street view
Structure Number: 21696, Location: 1.6 MI N I-44 (Lat: 35.531778, Lng: -97.578911), Route carried "under" structure: State highway 74, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 114,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 & GRAND BLVD UND, Facility Carried by Structure: NW EXPWY(OLD SH3A)
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 2.800, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 21696, Location: 1.6 MI N I-44 (Lat: 35.531778, Lng: -97.578911), Route carried "under" structure: State highway 74, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 114,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 & GRAND BLVD UND, Facility Carried by Structure: NW EXPWY(OLD SH3A)
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 2.800, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 21722, Location: 4.5 MI E OF MAY AVE. (Lat: 35.462156, Lng: -97.493747), Route carried "under" structure: Ramp Interstate 35, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 96,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 S-W/ I-35 E-S UNDER, Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 16.444, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 62.5m (205.1ft)
Structure Number: 21722, Location: 4.5 MI E OF MAY AVE. (Lat: 35.462156, Lng: -97.493747), Route carried "under" structure: Ramp Interstate 35, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 96,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 S-W/ I-35 E-S UNDER, Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 16.444, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 62.5m (205.1ft)
Find on map >> Show street view
Structure Number: 21722, Location: 4.5 MI E OF MAY AVE. (Lat: 35.462156, Lng: -97.493747), Route carried "under" structure: Ramp Interstate 35, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 42,950 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 S-W/ I-35 E-S UNDER, Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 9.252, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 62.5m (205.1ft)
Structure Number: 21722, Location: 4.5 MI E OF MAY AVE. (Lat: 35.462156, Lng: -97.493747), Route carried "under" structure: Ramp Interstate 35, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 42,950 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 S-W/ I-35 E-S UNDER, Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 9.252, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 62.5m (205.1ft)
Find on map >> Show street view
Structure Number: 21722, Location: 4.5 MI E OF MAY AVE. (Lat: 35.462156, Lng: -97.493747), Route carried "under" structure: Ramp City street 35, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2020), Truck Traffic: 10%, Features Intersected: I-35 S-W/ I-35 E-S UNDER, Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 62.5m (205.1ft)
Structure Number: 21722, Location: 4.5 MI E OF MAY AVE. (Lat: 35.462156, Lng: -97.493747), Route carried "under" structure: Ramp City street 35, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2020), Truck Traffic: 10%, Features Intersected: I-35 S-W/ I-35 E-S UNDER, Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 62.5m (205.1ft)
Find on map >> Show street view
Structure Number: 22041, Location: 1.2 MI N OF I-40 (Lat: 35.474483, Lng: -97.508153), Route carried "under" structure: Interstate 235, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 80,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: HARRISON ST.
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 2.042, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 22041, Location: 1.2 MI N OF I-40 (Lat: 35.474483, Lng: -97.508153), Route carried "under" structure: Interstate 235, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 80,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: HARRISON ST.
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 2.042, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 22046, Location: 1.5 MI N OF I-35 (Lat: 35.477972, Lng: -97.509178), Route carried "under" structure: Interstate 235, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 80,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: NE 10TH ST.
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 2.462, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 22046, Location: 1.5 MI N OF I-35 (Lat: 35.477972, Lng: -97.509178), Route carried "under" structure: Interstate 235, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 80,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: NE 10TH ST.
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 2.462, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 22062, Location: 1.8 MI N OF I-40 (Lat: 35.482469, Lng: -97.510286), Route carried "under" structure: Interstate 235, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 80,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: NE 13TH ST.
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 2.961, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 22062, Location: 1.8 MI N OF I-40 (Lat: 35.482469, Lng: -97.510286), Route carried "under" structure: Interstate 235, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 80,700 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: NE 13TH ST.
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 2.961, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 22096, Location: 6 MI N CLEVELAND CO (Lat: 35.461628, Lng: -97.492367), Route carried "under" structure: Ramp Interstate 35, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 42,950 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 E-S/ I-40 WB UNDER
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 9.413, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 71.0m (232.9ft)
Structure Number: 22096, Location: 6 MI N CLEVELAND CO (Lat: 35.461628, Lng: -97.492367), Route carried "under" structure: Ramp Interstate 35, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 42,950 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 E-S/ I-40 WB UNDER
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 9.413, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 71.0m (232.9ft)
Find on map >> Show street view
Structure Number: 22096, Location: 6 MI N CLEVELAND CO (Lat: 35.461628, Lng: -97.492367), Route carried "under" structure: Interstate 40, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 51,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 E-S/ I-40 WB UNDER, Facility Carried by Structure: I-35 RAMP S-W-N
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 16.814, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 71.0m (232.9ft)
Structure Number: 22096, Location: 6 MI N CLEVELAND CO (Lat: 35.461628, Lng: -97.492367), Route carried "under" structure: Interstate 40, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 51,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 E-S/ I-40 WB UNDER, Facility Carried by Structure: I-35 RAMP S-W-N
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 16.814, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 71.0m (232.9ft)
Find on map >> Show street view
Structure Number: 22098, Location: .3N RENO ST (Lat: 35.470533, Lng: -97.476808), Route carried "under" structure: City street N3100, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 9,300 (year 2020), Truck Traffic: 5%, Features Intersected: SLWC R.R. & ST UNDER
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 10.137, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 22098, Location: .3N RENO ST (Lat: 35.470533, Lng: -97.476808), Route carried "under" structure: City street N3100, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 9,300 (year 2020), Truck Traffic: 5%, Features Intersected: SLWC R.R. & ST UNDER
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 10.137, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 22343, Location: 1.0 MI N OF I-40 (Lat: 35.471647, Lng: -97.505475), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: NE 4TH ST. UNDER, Facility Carried by Structure: I-235
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 1.722, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 22343, Location: 1.0 MI N OF I-40 (Lat: 35.471647, Lng: -97.505475), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: NE 4TH ST. UNDER, Facility Carried by Structure: I-235
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 1.722, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 22377, Location: 1.2 MI N OF I-40 (Lat: 35.473547, Lng: -97.507306), Route carried "under" structure: Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 81,600 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: NE 5TH ST. RAMP
Minimum Vertical Clearance: 5.65m (18.54ft), Kilometerpoint: 1.931, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 22377, Location: 1.2 MI N OF I-40 (Lat: 35.473547, Lng: -97.507306), Route carried "under" structure: Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 81,600 (year 2020), Truck Traffic: 12%, Features Intersected: I-235 UNDER, Facility Carried by Structure: NE 5TH ST. RAMP
Minimum Vertical Clearance: 5.65m (18.54ft), Kilometerpoint: 1.931, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 22418, Location: 0.6 MI N OF I-40 (Lat: 35.467614, Lng: -97.501719), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 1.094, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 22418, Location: 0.6 MI N OF I-40 (Lat: 35.467614, Lng: -97.501719), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 1.094, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 22418, Location: 0.6 MI N OF I-40 (Lat: 35.467614, Lng: -97.501719), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 1.094, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 22418, Location: 0.6 MI N OF I-40 (Lat: 35.467614, Lng: -97.501719), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 1.094, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 22419, Location: 0.6 MI N OF I-40 (Lat: 35.467700, Lng: -97.501158), Route carried "under" structure: Ramp City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF, Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 1.094, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 49.1m (161.1ft)
Structure Number: 22419, Location: 0.6 MI N OF I-40 (Lat: 35.467700, Lng: -97.501158), Route carried "under" structure: Ramp City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF, Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 1.094, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 49.1m (161.1ft)
Find on map >> Show street view
Structure Number: 22419, Location: 0.6 MI N OF I-40 (Lat: 35.467700, Lng: -97.501158), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF, Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 1.094, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 49.1m (161.1ft)
Structure Number: 22419, Location: 0.6 MI N OF I-40 (Lat: 35.467700, Lng: -97.501158), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: LINCOLN/I-235RMP/BNSF, Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 1.094, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 49.1m (161.1ft)
Find on map >> Show street view
Structure Number: 22421, Location: AT JCT OF I-40 & 35 (Lat: 35.466547, Lng: -97.500214), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: RENO/BNSF R.R/I-235 RMP
Minimum Vertical Clearance: 6.37m (20.90ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 22421, Location: AT JCT OF I-40 & 35 (Lat: 35.466547, Lng: -97.500214), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: RENO/BNSF R.R/I-235 RMP
Minimum Vertical Clearance: 6.37m (20.90ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 22421, Location: AT JCT OF I-40 & 35 (Lat: 35.466547, Lng: -97.500214), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: RENO/BNSF R.R/I-235 RMP, Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 6.43m (21.10ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 22421, Location: AT JCT OF I-40 & 35 (Lat: 35.466547, Lng: -97.500214), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: RENO/BNSF R.R/I-235 RMP, Facility Carried by Structure: I-235 NB
Minimum Vertical Clearance: 6.43m (21.10ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 22422, Location: .4 SW OF RENO/WESTERN (Lat: 35.460522, Lng: -97.534894), Route carried "under" structure: Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 112,200 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/N.CAN. RIVER/U.P RR, Facility Carried by Structure: EXCHANGE AVE.
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 12.228, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.5m (136.2ft)
Structure Number: 22422, Location: .4 SW OF RENO/WESTERN (Lat: 35.460522, Lng: -97.534894), Route carried "under" structure: Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 112,200 (year 2020), Truck Traffic: 12%, Features Intersected: I-40/N.CAN. RIVER/U.P RR, Facility Carried by Structure: EXCHANGE AVE.
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 12.228, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.5m (136.2ft)
Find on map >> Show street view
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 35, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Features Intersected: I-40 /RENO/RR/I-235RMPUN
Minimum Vertical Clearance: 6.27m (20.57ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 35, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Features Intersected: I-40 /RENO/RR/I-235RMPUN
Minimum Vertical Clearance: 6.27m (20.57ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 6.72m (22.05ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 6.72m (22.05ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 6.46m (21.19ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 6.46m (21.19ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: I-40 /RENO/RR/I-235RMPUN
Minimum Vertical Clearance: 6.37m (20.90ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 800 (year 2020), Truck Traffic: 5%, Features Intersected: I-40 /RENO/RR/I-235RMPUN
Minimum Vertical Clearance: 6.37m (20.90ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 48,250 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 16.251, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 22423, Location: AT JCT OF I-40 & I-35 (Lat: 35.462008, Lng: -97.495686), Route carried "under" structure: Interstate 40, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 48,250 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 /RENO/RR/I-235RMPUN, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 16.251, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 3.380, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 3.380, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 4.220, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP, Facility Carried by Structure: I-235 SB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 4.220, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP
Minimum Vertical Clearance: 7.35m (24.11ft), Kilometerpoint: 4.445, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP
Minimum Vertical Clearance: 7.35m (24.11ft), Kilometerpoint: 4.445, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP
Minimum Vertical Clearance: 6.74m (22.11ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 22426, Location: 2.1 MI N OF I-40 (Lat: 35.485375, Lng: -97.511031), Route carried "under" structure: Ramp Interstate 235, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: NE16TH PL/23RDST/RR/RAMP
Minimum Vertical Clearance: 6.74m (22.11ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)