Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oklahoma City, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,901Number of bridges
  • 21,391ft / 6,520mTotal length
  • $2,061,419,000Total costs
  • 30,433,195Total average daily traffic
  • 3,708,300Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oklahoma City
  • No street view available for this location

New bridges in Oklahoma City, OK - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71910-1919
  • 541920-1929
  • 491930-1939
  • 1831940-1949
  • 1481950-1959
  • 2111960-1969
  • 2811970-1979
  • 2861980-1989
  • 2571990-1999
  • 2292000-2009
  • 1382010-2019
  • 572020-2022
Reconstructed bridges in Oklahoma City, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 61950-1959
  • 151960-1969
  • 231970-1979
  • 521980-1989
  • 421990-1999
  • 372000-2009
  • 182010-2019
  • 22020-2022
Average Bridge Truck Traffic in Oklahoma City, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.0%Excellent
  • 44.8%Very good
  • 27.4%Good
  • 13.4%Satisfactory
  • 2.0%Fair
  • 3.1%Poor
  • 0.5%Serious
  • 3.1%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.1%Excellent
  • 26.6%Very good
  • 27.4%Good
  • 24.7%Satisfactory
  • 12.6%Fair
  • 2.1%Poor
  • 3.1%Serious
  • 0.5%Critical
  • 3.1%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.3%Excellent
  • 14.8%Very good
  • 29.6%Good
  • 23.4%Satisfactory
  • 20.5%Fair
  • 6.5%Poor
  • 3.1%Serious
  • 0.7%Critical
  • 3.1%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.3%Excellent
  • 19.5%Very good
  • 25.1%Good
  • 28.1%Satisfactory
  • 17.4%Fair
  • 5.3%Poor
  • 1.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 0.2%Excellent
  • 10.6%Very good
  • 38.1%Good
  • 38.9%Satisfactory
  • 7.7%Fair
  • 1.2%Poor
  • 3.4%Serious
Find on map >>   Show street view

Structure Number: 22836,  Location: 131.33EB (Lat: 35.599397,  Lng: -97.495739),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 5%,  Features Intersected: KELLEY AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 4.587,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22837,  Location: 131.33WB (Lat: 35.599769,  Lng: -97.495742),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 5%,  Features Intersected: KELLEY AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 4.587,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22858,  Location: 7.1 MI N I-44 (Lat: 35.608800,  Lng: -97.584797),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 77,400 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: E.B. MEMORIAL RD.
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 11.731,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 22859,  Location: 7.1 MI N I-44 (Lat: 35.609972,  Lng: -97.584797),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: W.B. MEMORIAL RD.
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 11.858,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 2286,  Location: 128.20EB (Lat: 35.608969,  Lng: -97.549208),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: PENN. AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 10.701,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 2286,  Location: 128.20EB (Lat: 35.608969,  Lng: -97.549208),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: PENN. AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 22861,  Location: 128.20WB (Lat: 35.609283,  Lng: -97.549206),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: PENN. AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 10.701,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 22861,  Location: 128.20WB (Lat: 35.609283,  Lng: -97.549206),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: PENN. AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 22867,  Location: 126.70EB (Lat: 35.609081,  Lng: -97.575833),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 5%,  Features Intersected: QUAIL SPRING PKWY UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 13.113,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 22868,  Location: 0.8 MI E OF SH 74 (Lat: 35.609461,  Lng: -97.575825),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 5%,  Features Intersected: QUAIL SPRING PKWY UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 13.113,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 22869,  Location: 129.23EB (Lat: 35.606639,  Lng: -97.531344),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 5%,  Features Intersected: WESTERN AVE UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 9.043,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 2287,  Location: 129.23WB (Lat: 35.606981,  Lng: -97.531344),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 5%,  Features Intersected: WESTERN AVE UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 9.043,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 22874,  Location: 6.1 MI N I-44 (Lat: 35.594569,  Lng: -97.584764),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 77,400 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 10.153,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 2288,  Location: 130.31 (Lat: 35.601275,  Lng: -97.513650),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 47,600 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: SANTA FE AVE.
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 7.755,  Lanes on structure: 4,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 22881,  Location: 132.34 (Lat: 35.601364,  Lng: -97.478108),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 26,600 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: EASTERN AVE.
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 4.505,  Lanes on structure: 5,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 22883,  Location: 4.1 MI N I-44 (Lat: 35.565622,  Lng: -97.574561),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 85,300 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 6.774,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 22884,  Location: 127.20 (Lat: 35.609497,  Lng: -97.567031),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 54,700 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: MAY AVE.
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 12.759,  Lanes on structure: 6,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22885,  Location: 127.70 (Lat: 35.609450,  Lng: -97.558231),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 54,700 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: HIGH PARK BLVD.
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 11.954,  Lanes on structure: 6,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22889,  Location: 133.34 (Lat: 35.601517,  Lng: -97.460333),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 26,600 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: BRYANT AVE
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 2.895,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 22893,  Location: 2.6 MI N I-44 (Lat: 35.544217,  Lng: -97.574914),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 102,800 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: GRAND BLVD.
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 4.265,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.3m (220.8ft)

Find on map >>   Show street view

Structure Number: 22895,  Location: 128.80 (Lat: 35.609164,  Lng: -97.538817),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 54,400 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: PAWNEE AVE.
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 10.202,  Lanes on structure: 2,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 22896,  Location: 129.85 (Lat: 35.603750,  Lng: -97.521164),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 47,600 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 32ND ST.
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 8.496,  Lanes on structure: 2,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 229,  Location: 5.1 MI N I-44 (Lat: 35.580067,  Lng: -97.579567),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 85,300 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: HEFNER RD.
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 8.447,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.6m (215.2ft)

Find on map >>   Show street view

Structure Number: 22923,  Location: 134.33 (Lat: 35.601856,  Lng: -97.442786),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 26,600 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: COLTRANE RD.
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 1.304,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 2293,  Location: 130.87EB (Lat: 35.599111,  Lng: -97.503750),  Route carried "under" structure: US 77,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 58,800 (year 2020),  Truck Traffic: 8%,  Features Intersected: U.S. 77 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 7.385,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22931,  Location: 130.87WB (Lat: 35.599522,  Lng: -97.503453),  Route carried "under" structure: US 77,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 58,800 (year 2020),  Truck Traffic: 8%,  Features Intersected: U.S. 77 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 7.401,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22941,  Location: TURNPIKE & SH 74 (Lat: 35.609286,  Lng: -97.584267),  Route carried "under" structure: Ramp State highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 10.940,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 22941,  Location: TURNPIKE & SH 74 (Lat: 35.609286,  Lng: -97.584267),  Route carried "under" structure: Ramp State highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 10.940,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 22941,  Location: TURNPIKE & SH 74 (Lat: 35.609286,  Lng: -97.584267),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 53,900 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 10.940,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 22942,  Location: TURNPIKE & SH 74 (Lat: 35.609600,  Lng: -97.584258),  Route carried "under" structure: Ramp State highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 10.940,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 22942,  Location: TURNPIKE & SH 74 (Lat: 35.609600,  Lng: -97.584258),  Route carried "under" structure: Ramp State highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 10.940,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 22942,  Location: TURNPIKE & SH 74 (Lat: 35.609600,  Lng: -97.584258),  Route carried "under" structure: State highway 74,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 53,900 (year 2020),  Truck Traffic: 8%,  Features Intersected: S.H. 74 UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 10.940,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 2295,  Location: 135.09WB (Lat: 35.600858,  Lng: -97.428275),  Route carried "under" structure: Interstate 35,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 63,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: KILPATRICK TP W-N/I-35,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 9.36m (30.71ft),  Kilometerpoint: 7.240,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 2295,  Location: 135.09WB (Lat: 35.600858,  Lng: -97.428275),  Route carried "under" structure: Interstate 35,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 63,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: KILPATRICK TP W-N/I-35,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 11.48m (37.66ft),  Kilometerpoint: 7.240,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 2295,  Location: 135.09WB (Lat: 35.600858,  Lng: -97.428275),  Route carried "under" structure: Ramp Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 26,600 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP W-N/I-35,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 22952,  Location: 130.99 (Lat: 35.598933,  Lng: -97.501900),  Route carried "under" structure: Other road 77,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 6.677,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 22952,  Location: 130.99 (Lat: 35.598933,  Lng: -97.501900),  Route carried "under" structure: US 77,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 72,092 (year 2020),  Truck Traffic: 7%,  Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 6.677,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 22952,  Location: 130.99 (Lat: 35.598933,  Lng: -97.501900),  Route carried "under" structure: Other road 77,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 6.677,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 22953,  Location: 135.09EB (Lat: 35.599594,  Lng: -97.428069),  Route carried "under" structure: Ramp Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP E-S/I-35,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 22953,  Location: 135.09EB (Lat: 35.599594,  Lng: -97.428069),  Route carried "under" structure: Interstate 35,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 35,550 (year 2020),  Truck Traffic: 12%,  Features Intersected: KILPATRICK TP E-S/I-35,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 12.15m (39.86ft),  Kilometerpoint: 7.096,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 22953,  Location: 135.09EB (Lat: 35.599594,  Lng: -97.428069),  Route carried "under" structure: Interstate 35,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 26,600 (year 2020),  Truck Traffic: 12%,  Features Intersected: KILPATRICK TP E-S/I-35,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 10.21m (33.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 23101,  Location: 1.9 MI N CLEVELAND CO (Lat: 35.406014,  Lng: -97.493861),  Route carried "under" structure: City street 9380,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: FAU 9380 SE 59 ST UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 3.187,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 23104,  Location: 2.1 MI N CLEVELAND CO (Lat: 35.409644,  Lng: -97.492894),  Route carried "under" structure: ServiceCity street 35,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 5%,  Features Intersected: BNSF R.R. & RD. UNDER
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 23634,  Location: 4.7 MI N CLEVELAND CO (Lat: 35.444836,  Lng: -97.485928),  Route carried "under" structure: Interstate 35,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 114,800 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: SE 20TH ST.
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 7.578,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 23635,  Location: 5.1 MI N CLEVELAND CO (Lat: 35.449972,  Lng: -97.487756),  Route carried "under" structure: Interstate 35,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 114,800 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: FAU 9440 (SE 15)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 8.142,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 23639,  Location: 5.1 MI E OF JCT I35 (Lat: 35.389083,  Lng: -97.406194),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: AIR DEPOT UNDER,  Facility Carried by Structure: I-240
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 15.430,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2364,  Location: 5.1 MI E OF JCT I35 (Lat: 35.388686,  Lng: -97.406208),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: AIR DEPOT UNDER,  Facility Carried by Structure: I-240
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 15.430,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 23937,  Location: 135.09W-N (Lat: 35.601328,  Lng: -97.429922),  Route carried "under" structure: Interstate 35,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 71,500 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 SB UNDER,  Facility Carried by Structure: KILPATRICK TP W-N
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 7.112,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 24168,  Location: 4.1N CLEVELAND CO. (Lat: 35.435278,  Lng: -97.485833),  Route carried "under" structure: Interstate 35,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 114,800 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: FAU 9240 (SE 29TH)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 6.516,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 24169,  Location: 4.3N CLEVELAND CO. (Lat: 35.439183,  Lng: -97.486308),  Route carried "under" structure: Interstate 35,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 114,800 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: SE 25TH ST.
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 6.935,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 24271,  Location: E. EDGE FT. SMITH JCT (Lat: 35.465544,  Lng: -97.467675),  Route carried "under" structure: City street 9460,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Features Intersected: RENO ST-R.R.-RIVER UNDER,  Facility Carried by Structure: I-40 EB AND RAMP
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.257,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 24853,  Location: 2.14 MI.NE CANADIDAN CO (Lat: 35.413247,  Lng: -97.654172),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: COUNCIL RD. UNDER,  Facility Carried by Structure: S.H. 152 WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 24857,  Location: 3.68 MI.NE CANADIDAN CO (Lat: 35.420503,  Lng: -97.631597),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: SW 44TH ST. UNDER,  Facility Carried by Structure: S.H. 152 WB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 5.921,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 24858,  Location: 3.69 MI.NE CANADIDAN CO (Lat: 35.420500,  Lng: -97.631156),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: SW 44TH ST. UNDER,  Facility Carried by Structure: S.H. 152 EB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 24969,  Location: 1/2 MI. N. OF I-240 (Lat: 35.401278,  Lng: -97.576428),  Route carried "under" structure: Ramp Interstate 44,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 7%,  Features Intersected: I-44 NB RAMP TO SW 59TH
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 25127,  Location: 33.0 MI. E. CADDO CO (Lat: 35.476367,  Lng: -97.742625),  Route carried "under" structure: Interstate 40,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 47,700 (year 2020),  Truck Traffic: 43%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.32m (17.45ft),  Kilometerpoint: 53.194,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 25127,  Location: 33.0 MI. E. CADDO CO (Lat: 35.476367,  Lng: -97.742625),  Route carried "under" structure: Ramp State highway 40,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 16%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 53.194,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 25127,  Location: 33.0 MI. E. CADDO CO (Lat: 35.476367,  Lng: -97.742625),  Route carried "under" structure: Ramp State highway 40,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 16%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 53.194,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 25245,  Location: 1.7 MI N OF JCT W/ I-40 (Lat: 35.493025,  Lng: -97.465489),  Route carried "under" structure: Interstate 35,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 73,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 14.706,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 2535,  Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339,  Lng: -97.466089),  Route carried "under" structure: Interstate 35,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 73,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 12.373,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 2535,  Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339,  Lng: -97.466089),  Route carried "under" structure: Ramp Interstate 35,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 12.373,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 2535,  Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339,  Lng: -97.466089),  Route carried "under" structure: Ramp Interstate 35,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 73,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 12.373,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 25443,  Location: 1.4 MI N OLD US77 (Lat: 35.377564,  Lng: -97.495189),  Route carried "under" structure: City street ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: 89TH ST. UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 13.377,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 25443,  Location: 1.4 MI N OLD US77 (Lat: 35.377564,  Lng: -97.495189),  Route carried "under" structure: City street ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: 89TH ST. UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 25443,  Location: 1.4 MI N OLD US77 (Lat: 35.377564,  Lng: -97.495189),  Route carried "under" structure: City street ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: 89TH ST. UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 25493,  Location: 1 MI E OF WESTERN (Lat: 35.536731,  Lng: -97.515028),  Route carried "under" structure: US 77,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 92,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: U.S. 77 UNDER,  Facility Carried by Structure: NW 63 ST. (FAU R
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.756,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.2m (115.5ft)

Find on map >>   Show street view

Structure Number: 25493,  Location: 1 MI E OF WESTERN (Lat: 35.536731,  Lng: -97.515028),  Route carried "under" structure: Ramp US 77,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 92,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: U.S. 77 UNDER,  Facility Carried by Structure: NW 63 ST. (FAU R
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.756,  Lanes on structure: 7,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.2m (115.5ft)

Find on map >>   Show street view

Structure Number: 25533,  Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153,  Lng: -97.469869),  Route carried "under" structure: Interstate 40,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 87,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-40 EB RAMP& I-40 EB&WB,  Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 8.50m (27.89ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 25533,  Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153,  Lng: -97.469869),  Route carried "under" structure: Ramp Interstate 35,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 17,764 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-40 EB RAMP& I-40 EB&WB
Minimum Vertical Clearance: 7.13m (23.39ft),  Kilometerpoint: 11.858,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 25533,  Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153,  Lng: -97.469869),  Route carried "under" structure: Interstate 40,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 87,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-40 EB RAMP& I-40 EB&WB,  Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 10.97m (35.99ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 25554,  Location: 1 MI N. OF WILSHIRE BLVD (Lat: 35.565381,  Lng: -97.514328),  Route carried "under" structure: US 77,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 81,300 (year 2020),  Truck Traffic: 8%,  Features Intersected: U.S. 77 UNDER,  Facility Carried by Structure: FAU 9620 (BRITTON
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 3.973,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 25823,  Location: TOP LVL BR FT. SMITH JCT. (Lat: 35.466875,  Lng: -97.468322),  Route carried "under" structure: Ramp Interstate 35,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 60,100 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 RAMP & I-40 WB UND
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 11.891,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 25823,  Location: TOP LVL BR FT. SMITH JCT. (Lat: 35.466875,  Lng: -97.468322),  Route carried "under" structure: Interstate 40,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 87,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-35 RAMP & I-40 WB UND,  Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 25825,  Location: MID LVL BR FT. SMITH JCT. (Lat: 35.467225,  Lng: -97.467892),  Route carried "under" structure: Interstate 40,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 35,070 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-40 WEST UNDER
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 25847,  Location: 125.69 (Lat: 35.609931,  Lng: -97.593919),  Route carried "under" structure: Other road 77,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2020),  Truck Traffic: 16%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: CROSSOVER#2
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 15.205,  Lanes on structure: 2,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 25849,  Location: 125.19EB (Lat: 35.609494,  Lng: -97.602575),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: MERIDIAN AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 15.994,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2585,  Location: 125.19WB (Lat: 35.609806,  Lng: -97.602578),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: MERIDIAN AVE. UNDER,  Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 15.994,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 25853,  Location: 124.64 (Lat: 35.609914,  Lng: -97.612517),  Route carried "under" structure: Other road ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: MARTIN PARK CROSS
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 16.895,  Lanes on structure: 2,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 25854,  Location: 124.18 (Lat: 35.609614,  Lng: -97.620614),  Route carried "under" structure: Other road ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: MACARTHUR BLVD.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 17.619,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 25855,  Location: 123.68 (Lat: 35.608842,  Lng: -97.629467),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: BRANDON PL. UNDER,  Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 18.424,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.5m (106.6ft)

Find on map >>   Show street view

Structure Number: 25856,  Location: 123.68WB (Lat: 35.609219,  Lng: -97.629464),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: BRANDON PL. UNDER,  Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 21.528,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 25857,  Location: 123.18 (Lat: 35.609675,  Lng: -97.638419),  Route carried "under" structure: Other road ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: ROCKWELL AVE.
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 19.245,  Lanes on structure: 5,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.5m (106.6ft)

Find on map >>   Show street view

Structure Number: 25861,  Location: 122.18 (Lat: 35.610283,  Lng: -97.656189),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: COUNCIL RD.
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 20.852,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.5m (106.6ft)

Find on map >>   Show street view

Structure Number: 25864,  Location: 121.17 (Lat: 35.609669,  Lng: -97.673969),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 20,700 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: COUNTY LINE RD.
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 22.478,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 25865,  Location: 119.90 (Lat: 35.594989,  Lng: -97.687792),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 19,700 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 2.060,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 25867,  Location: 118.87NB (Lat: 35.580303,  Lng: -97.688747),  Route carried "under" structure: State highway 3,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 16,900 (year 2020),  Truck Traffic: 5%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 31.311,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 25868,  Location: 118.87SB (Lat: 35.580489,  Lng: -97.689172),  Route carried "under" structure: State highway 3,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 16,900 (year 2020),  Truck Traffic: 5%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 31.295,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 25869,  Location: 117.88 (Lat: 35.565753,  Lng: -97.689389),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 20,900 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 5.325,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 2587,  Location: 116.87 (Lat: 35.551139,  Lng: -97.689419),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 22,700 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: WILSHIRE BLVD.
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 25875,  Location: 116.11 (Lat: 35.536819,  Lng: -97.694794),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 22,700 (year 2020),  Truck Traffic: 8%,  Features Intersected: KILPATRICK TP UNDER,  Facility Carried by Structure: NW 63RD ST.
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 8.657,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Discuss Oklahoma City, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.