Bridge Statistics for Oklahoma City, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 1,901Number of bridges
- 21,391ft / 6,520mTotal length
- $2,061,419,000Total costs
- 30,433,195Total average daily traffic
- 3,708,300Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Oklahoma City
- No street view available for this location
- New bridges - historical statistics
- 11900-1909
- 71910-1919
- 541920-1929
- 491930-1939
- 1831940-1949
- 1481950-1959
- 2111960-1969
- 2811970-1979
- 2861980-1989
- 2571990-1999
- 2292000-2009
- 1382010-2019
- 572020-2022
- Reconstructed bridges - Historical Statistics
- 21940-1949
- 61950-1959
- 151960-1969
- 231970-1979
- 521980-1989
- 421990-1999
- 372000-2009
- 182010-2019
- 22020-2022
- Bridge Condition - Deck
- 9.0%Excellent
- 44.8%Very good
- 27.4%Good
- 13.4%Satisfactory
- 2.0%Fair
- 3.1%Poor
- 0.5%Serious
- 3.1%Failed
- Bridge Condition - Superstructure
- 3.1%Excellent
- 26.6%Very good
- 27.4%Good
- 24.7%Satisfactory
- 12.6%Fair
- 2.1%Poor
- 3.1%Serious
- 0.5%Critical
- 3.1%Failed
- Bridge Condition - Substructure
- 1.3%Excellent
- 14.8%Very good
- 29.6%Good
- 23.4%Satisfactory
- 20.5%Fair
- 6.5%Poor
- 3.1%Serious
- 0.7%Critical
- 3.1%Failed
- Bridge Condition - Channel
- 3.3%Excellent
- 19.5%Very good
- 25.1%Good
- 28.1%Satisfactory
- 17.4%Fair
- 5.3%Poor
- 1.1%Serious
- Bridge Condition - Culverts
- 0.2%Excellent
- 10.6%Very good
- 38.1%Good
- 38.9%Satisfactory
- 7.7%Fair
- 1.2%Poor
- 3.4%Serious
Find on map >> Show street view
Structure Number: 22836, Location: 131.33EB (Lat: 35.599397, Lng: -97.495739), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 4.587, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 22836, Location: 131.33EB (Lat: 35.599397, Lng: -97.495739), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 4.587, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 22837, Location: 131.33WB (Lat: 35.599769, Lng: -97.495742), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 4.587, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 22837, Location: 131.33WB (Lat: 35.599769, Lng: -97.495742), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: KELLEY AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 4.587, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 22858, Location: 7.1 MI N I-44 (Lat: 35.608800, Lng: -97.584797), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 77,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: E.B. MEMORIAL RD.
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 11.731, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Structure Number: 22858, Location: 7.1 MI N I-44 (Lat: 35.608800, Lng: -97.584797), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 77,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: E.B. MEMORIAL RD.
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 11.731, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Find on map >> Show street view
Structure Number: 22859, Location: 7.1 MI N I-44 (Lat: 35.609972, Lng: -97.584797), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 25,900 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: W.B. MEMORIAL RD.
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 11.858, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Structure Number: 22859, Location: 7.1 MI N I-44 (Lat: 35.609972, Lng: -97.584797), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 25,900 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: W.B. MEMORIAL RD.
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 11.858, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Find on map >> Show street view
Structure Number: 2286, Location: 128.20EB (Lat: 35.608969, Lng: -97.549208), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.701, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 2286, Location: 128.20EB (Lat: 35.608969, Lng: -97.549208), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.701, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 2286, Location: 128.20EB (Lat: 35.608969, Lng: -97.549208), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 2286, Location: 128.20EB (Lat: 35.608969, Lng: -97.549208), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 22861, Location: 128.20WB (Lat: 35.609283, Lng: -97.549206), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.701, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 22861, Location: 128.20WB (Lat: 35.609283, Lng: -97.549206), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 10.701, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 22861, Location: 128.20WB (Lat: 35.609283, Lng: -97.549206), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 22861, Location: 128.20WB (Lat: 35.609283, Lng: -97.549206), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: PENN. AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 22867, Location: 126.70EB (Lat: 35.609081, Lng: -97.575833), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: QUAIL SPRING PKWY UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 13.113, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 22867, Location: 126.70EB (Lat: 35.609081, Lng: -97.575833), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: QUAIL SPRING PKWY UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 13.113, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 22868, Location: 0.8 MI E OF SH 74 (Lat: 35.609461, Lng: -97.575825), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: QUAIL SPRING PKWY UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 13.113, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 22868, Location: 0.8 MI E OF SH 74 (Lat: 35.609461, Lng: -97.575825), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: QUAIL SPRING PKWY UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 13.113, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 22869, Location: 129.23EB (Lat: 35.606639, Lng: -97.531344), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: WESTERN AVE UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 9.043, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 22869, Location: 129.23EB (Lat: 35.606639, Lng: -97.531344), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: WESTERN AVE UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 9.043, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 2287, Location: 129.23WB (Lat: 35.606981, Lng: -97.531344), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: WESTERN AVE UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 9.043, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 2287, Location: 129.23WB (Lat: 35.606981, Lng: -97.531344), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 80 (year 2020), Truck Traffic: 5%, Features Intersected: WESTERN AVE UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 9.043, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 22874, Location: 6.1 MI N I-44 (Lat: 35.594569, Lng: -97.584764), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 77,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 10.153, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 22874, Location: 6.1 MI N I-44 (Lat: 35.594569, Lng: -97.584764), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 77,400 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 10.153, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 2288, Location: 130.31 (Lat: 35.601275, Lng: -97.513650), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: SANTA FE AVE.
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 7.755, Lanes on structure: 4, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft)
Structure Number: 2288, Location: 130.31 (Lat: 35.601275, Lng: -97.513650), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: SANTA FE AVE.
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 7.755, Lanes on structure: 4, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft)
Find on map >> Show street view
Structure Number: 22881, Location: 132.34 (Lat: 35.601364, Lng: -97.478108), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: EASTERN AVE.
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 4.505, Lanes on structure: 5, Lanes under structure: 5, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 22881, Location: 132.34 (Lat: 35.601364, Lng: -97.478108), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: EASTERN AVE.
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 4.505, Lanes on structure: 5, Lanes under structure: 5, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 22883, Location: 4.1 MI N I-44 (Lat: 35.565622, Lng: -97.574561), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 85,300 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 6.774, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Structure Number: 22883, Location: 4.1 MI N I-44 (Lat: 35.565622, Lng: -97.574561), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 85,300 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 6.774, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Find on map >> Show street view
Structure Number: 22884, Location: 127.20 (Lat: 35.609497, Lng: -97.567031), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 54,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: MAY AVE.
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 12.759, Lanes on structure: 6, Lanes under structure: 6, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 22884, Location: 127.20 (Lat: 35.609497, Lng: -97.567031), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 54,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: MAY AVE.
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 12.759, Lanes on structure: 6, Lanes under structure: 6, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 22885, Location: 127.70 (Lat: 35.609450, Lng: -97.558231), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 54,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: HIGH PARK BLVD.
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 11.954, Lanes on structure: 6, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 22885, Location: 127.70 (Lat: 35.609450, Lng: -97.558231), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 54,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: HIGH PARK BLVD.
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 11.954, Lanes on structure: 6, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 22889, Location: 133.34 (Lat: 35.601517, Lng: -97.460333), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: BRYANT AVE
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 2.895, Lanes on structure: 4, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 22889, Location: 133.34 (Lat: 35.601517, Lng: -97.460333), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: BRYANT AVE
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 2.895, Lanes on structure: 4, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 22893, Location: 2.6 MI N I-44 (Lat: 35.544217, Lng: -97.574914), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 102,800 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: GRAND BLVD.
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 4.265, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 67.3m (220.8ft)
Structure Number: 22893, Location: 2.6 MI N I-44 (Lat: 35.544217, Lng: -97.574914), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 102,800 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: GRAND BLVD.
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 4.265, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 67.3m (220.8ft)
Find on map >> Show street view
Structure Number: 22895, Location: 128.80 (Lat: 35.609164, Lng: -97.538817), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 54,400 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: PAWNEE AVE.
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 10.202, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 22895, Location: 128.80 (Lat: 35.609164, Lng: -97.538817), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 54,400 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: PAWNEE AVE.
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 10.202, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 22896, Location: 129.85 (Lat: 35.603750, Lng: -97.521164), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: NW 32ND ST.
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 8.496, Lanes on structure: 2, Lanes under structure: 7, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft)
Structure Number: 22896, Location: 129.85 (Lat: 35.603750, Lng: -97.521164), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: NW 32ND ST.
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 8.496, Lanes on structure: 2, Lanes under structure: 7, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.2m (99.1ft)
Find on map >> Show street view
Structure Number: 229, Location: 5.1 MI N I-44 (Lat: 35.580067, Lng: -97.579567), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 85,300 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: HEFNER RD.
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 8.447, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 229, Location: 5.1 MI N I-44 (Lat: 35.580067, Lng: -97.579567), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 85,300 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: HEFNER RD.
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 8.447, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 22923, Location: 134.33 (Lat: 35.601856, Lng: -97.442786), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: COLTRANE RD.
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 1.304, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 22923, Location: 134.33 (Lat: 35.601856, Lng: -97.442786), Route carried "under" structure: Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: COLTRANE RD.
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 1.304, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 2293, Location: 130.87EB (Lat: 35.599111, Lng: -97.503750), Route carried "under" structure: US 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 58,800 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 6.04m (19.82ft), Kilometerpoint: 7.385, Lanes on structure: 4, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 2293, Location: 130.87EB (Lat: 35.599111, Lng: -97.503750), Route carried "under" structure: US 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 58,800 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 6.04m (19.82ft), Kilometerpoint: 7.385, Lanes on structure: 4, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 22931, Location: 130.87WB (Lat: 35.599522, Lng: -97.503453), Route carried "under" structure: US 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 58,800 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 7.401, Lanes on structure: 4, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 22931, Location: 130.87WB (Lat: 35.599522, Lng: -97.503453), Route carried "under" structure: US 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 58,800 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 7.401, Lanes on structure: 4, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 22941, Location: TURNPIKE & SH 74 (Lat: 35.609286, Lng: -97.584267), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 3, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 22941, Location: TURNPIKE & SH 74 (Lat: 35.609286, Lng: -97.584267), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 3, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 22941, Location: TURNPIKE & SH 74 (Lat: 35.609286, Lng: -97.584267), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 22941, Location: TURNPIKE & SH 74 (Lat: 35.609286, Lng: -97.584267), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 22941, Location: TURNPIKE & SH 74 (Lat: 35.609286, Lng: -97.584267), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 53,900 (year 2020), Truck Traffic: 7%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 22941, Location: TURNPIKE & SH 74 (Lat: 35.609286, Lng: -97.584267), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 53,900 (year 2020), Truck Traffic: 7%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 22942, Location: TURNPIKE & SH 74 (Lat: 35.609600, Lng: -97.584258), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 22942, Location: TURNPIKE & SH 74 (Lat: 35.609600, Lng: -97.584258), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 22942, Location: TURNPIKE & SH 74 (Lat: 35.609600, Lng: -97.584258), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 22942, Location: TURNPIKE & SH 74 (Lat: 35.609600, Lng: -97.584258), Route carried "under" structure: Ramp State highway , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 22942, Location: TURNPIKE & SH 74 (Lat: 35.609600, Lng: -97.584258), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 53,900 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 22942, Location: TURNPIKE & SH 74 (Lat: 35.609600, Lng: -97.584258), Route carried "under" structure: State highway 74, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 53,900 (year 2020), Truck Traffic: 8%, Features Intersected: S.H. 74 UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 10.940, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 2295, Location: 135.09WB (Lat: 35.600858, Lng: -97.428275), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP W-N/I-35, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 9.36m (30.71ft), Kilometerpoint: 7.240, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 2295, Location: 135.09WB (Lat: 35.600858, Lng: -97.428275), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP W-N/I-35, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 9.36m (30.71ft), Kilometerpoint: 7.240, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 2295, Location: 135.09WB (Lat: 35.600858, Lng: -97.428275), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP W-N/I-35, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 11.48m (37.66ft), Kilometerpoint: 7.240, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 2295, Location: 135.09WB (Lat: 35.600858, Lng: -97.428275), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 63,000 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP W-N/I-35, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 11.48m (37.66ft), Kilometerpoint: 7.240, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 2295, Location: 135.09WB (Lat: 35.600858, Lng: -97.428275), Route carried "under" structure: Ramp Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP W-N/I-35, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 2295, Location: 135.09WB (Lat: 35.600858, Lng: -97.428275), Route carried "under" structure: Ramp Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP W-N/I-35, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 22952, Location: 130.99 (Lat: 35.598933, Lng: -97.501900), Route carried "under" structure: Other road 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 13,000 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 6.677, Lanes on structure: 1, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 22952, Location: 130.99 (Lat: 35.598933, Lng: -97.501900), Route carried "under" structure: Other road 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 13,000 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 6.677, Lanes on structure: 1, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 22952, Location: 130.99 (Lat: 35.598933, Lng: -97.501900), Route carried "under" structure: US 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 72,092 (year 2020), Truck Traffic: 7%, Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 6.677, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 22952, Location: 130.99 (Lat: 35.598933, Lng: -97.501900), Route carried "under" structure: US 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 72,092 (year 2020), Truck Traffic: 7%, Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 6.677, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 22952, Location: 130.99 (Lat: 35.598933, Lng: -97.501900), Route carried "under" structure: Other road 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 13,000 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 6.677, Lanes on structure: 1, Lanes under structure: 1, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 22952, Location: 130.99 (Lat: 35.598933, Lng: -97.501900), Route carried "under" structure: Other road 77, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 13,000 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP/U.S. 77UND
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 6.677, Lanes on structure: 1, Lanes under structure: 1, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 22953, Location: 135.09EB (Lat: 35.599594, Lng: -97.428069), Route carried "under" structure: Ramp Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP E-S/I-35, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 22953, Location: 135.09EB (Lat: 35.599594, Lng: -97.428069), Route carried "under" structure: Ramp Other road , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP E-S/I-35, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 22953, Location: 135.09EB (Lat: 35.599594, Lng: -97.428069), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 35,550 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP E-S/I-35, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 12.15m (39.86ft), Kilometerpoint: 7.096, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 22953, Location: 135.09EB (Lat: 35.599594, Lng: -97.428069), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 35,550 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP E-S/I-35, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 12.15m (39.86ft), Kilometerpoint: 7.096, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 22953, Location: 135.09EB (Lat: 35.599594, Lng: -97.428069), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP E-S/I-35, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 10.21m (33.50ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 22953, Location: 135.09EB (Lat: 35.599594, Lng: -97.428069), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 26,600 (year 2020), Truck Traffic: 12%, Features Intersected: KILPATRICK TP E-S/I-35, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 10.21m (33.50ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 23101, Location: 1.9 MI N CLEVELAND CO (Lat: 35.406014, Lng: -97.493861), Route carried "under" structure: City street 9380, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: FAU 9380 SE 59 ST UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 3.187, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.4m (57.1ft)
Structure Number: 23101, Location: 1.9 MI N CLEVELAND CO (Lat: 35.406014, Lng: -97.493861), Route carried "under" structure: City street 9380, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: FAU 9380 SE 59 ST UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 3.187, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.4m (57.1ft)
Find on map >> Show street view
Structure Number: 23104, Location: 2.1 MI N CLEVELAND CO (Lat: 35.409644, Lng: -97.492894), Route carried "under" structure: ServiceCity street 35, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 450 (year 2020), Truck Traffic: 5%, Features Intersected: BNSF R.R. & RD. UNDER
Minimum Vertical Clearance: 7.54m (24.74ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 23104, Location: 2.1 MI N CLEVELAND CO (Lat: 35.409644, Lng: -97.492894), Route carried "under" structure: ServiceCity street 35, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 450 (year 2020), Truck Traffic: 5%, Features Intersected: BNSF R.R. & RD. UNDER
Minimum Vertical Clearance: 7.54m (24.74ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 23634, Location: 4.7 MI N CLEVELAND CO (Lat: 35.444836, Lng: -97.485928), Route carried "under" structure: Interstate 35, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: SE 20TH ST.
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 7.578, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 23634, Location: 4.7 MI N CLEVELAND CO (Lat: 35.444836, Lng: -97.485928), Route carried "under" structure: Interstate 35, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: SE 20TH ST.
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 7.578, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 23635, Location: 5.1 MI N CLEVELAND CO (Lat: 35.449972, Lng: -97.487756), Route carried "under" structure: Interstate 35, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9440 (SE 15)
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 8.142, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 23635, Location: 5.1 MI N CLEVELAND CO (Lat: 35.449972, Lng: -97.487756), Route carried "under" structure: Interstate 35, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9440 (SE 15)
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 8.142, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 23639, Location: 5.1 MI E OF JCT I35 (Lat: 35.389083, Lng: -97.406194), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: AIR DEPOT UNDER, Facility Carried by Structure: I-240
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 15.430, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 23639, Location: 5.1 MI E OF JCT I35 (Lat: 35.389083, Lng: -97.406194), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: AIR DEPOT UNDER, Facility Carried by Structure: I-240
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 15.430, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 2364, Location: 5.1 MI E OF JCT I35 (Lat: 35.388686, Lng: -97.406208), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: AIR DEPOT UNDER, Facility Carried by Structure: I-240
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 15.430, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 2364, Location: 5.1 MI E OF JCT I35 (Lat: 35.388686, Lng: -97.406208), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 1,500 (year 2020), Truck Traffic: 5%, Features Intersected: AIR DEPOT UNDER, Facility Carried by Structure: I-240
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 15.430, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 23937, Location: 135.09W-N (Lat: 35.601328, Lng: -97.429922), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 71,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 SB UNDER, Facility Carried by Structure: KILPATRICK TP W-N
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 7.112, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.7m (127.0ft)
Structure Number: 23937, Location: 135.09W-N (Lat: 35.601328, Lng: -97.429922), Route carried "under" structure: Interstate 35, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 71,500 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 SB UNDER, Facility Carried by Structure: KILPATRICK TP W-N
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 7.112, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.7m (127.0ft)
Find on map >> Show street view
Structure Number: 24168, Location: 4.1N CLEVELAND CO. (Lat: 35.435278, Lng: -97.485833), Route carried "under" structure: Interstate 35, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9240 (SE 29TH)
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 6.516, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.1m (79.1ft)
Structure Number: 24168, Location: 4.1N CLEVELAND CO. (Lat: 35.435278, Lng: -97.485833), Route carried "under" structure: Interstate 35, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9240 (SE 29TH)
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 6.516, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.1m (79.1ft)
Find on map >> Show street view
Structure Number: 24169, Location: 4.3N CLEVELAND CO. (Lat: 35.439183, Lng: -97.486308), Route carried "under" structure: Interstate 35, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: SE 25TH ST.
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 6.935, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.7m (90.9ft)
Structure Number: 24169, Location: 4.3N CLEVELAND CO. (Lat: 35.439183, Lng: -97.486308), Route carried "under" structure: Interstate 35, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 114,800 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: SE 25TH ST.
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 6.935, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.7m (90.9ft)
Find on map >> Show street view
Structure Number: 24271, Location: E. EDGE FT. SMITH JCT (Lat: 35.465544, Lng: -97.467675), Route carried "under" structure: City street 9460, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 500 (year 2020), Truck Traffic: 5%, Features Intersected: RENO ST-R.R.-RIVER UNDER, Facility Carried by Structure: I-40 EB AND RAMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.257, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 24271, Location: E. EDGE FT. SMITH JCT (Lat: 35.465544, Lng: -97.467675), Route carried "under" structure: City street 9460, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 500 (year 2020), Truck Traffic: 5%, Features Intersected: RENO ST-R.R.-RIVER UNDER, Facility Carried by Structure: I-40 EB AND RAMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.257, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 24853, Location: 2.14 MI.NE CANADIDAN CO (Lat: 35.413247, Lng: -97.654172), Route carried "under" structure: City street , Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: COUNCIL RD. UNDER, Facility Carried by Structure: S.H. 152 WB
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 43.9m (144.0ft)
Structure Number: 24853, Location: 2.14 MI.NE CANADIDAN CO (Lat: 35.413247, Lng: -97.654172), Route carried "under" structure: City street , Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: COUNCIL RD. UNDER, Facility Carried by Structure: S.H. 152 WB
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 43.9m (144.0ft)
Find on map >> Show street view
Structure Number: 24857, Location: 3.68 MI.NE CANADIDAN CO (Lat: 35.420503, Lng: -97.631597), Route carried "under" structure: City street , Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: SW 44TH ST. UNDER, Facility Carried by Structure: S.H. 152 WB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 5.921, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 24857, Location: 3.68 MI.NE CANADIDAN CO (Lat: 35.420503, Lng: -97.631597), Route carried "under" structure: City street , Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: SW 44TH ST. UNDER, Facility Carried by Structure: S.H. 152 WB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 5.921, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 24858, Location: 3.69 MI.NE CANADIDAN CO (Lat: 35.420500, Lng: -97.631156), Route carried "under" structure: City street , Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: SW 44TH ST. UNDER, Facility Carried by Structure: S.H. 152 EB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 24858, Location: 3.69 MI.NE CANADIDAN CO (Lat: 35.420500, Lng: -97.631156), Route carried "under" structure: City street , Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: SW 44TH ST. UNDER, Facility Carried by Structure: S.H. 152 EB
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 24969, Location: 1/2 MI. N. OF I-240 (Lat: 35.401278, Lng: -97.576428), Route carried "under" structure: Ramp Interstate 44, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: I-44 NB RAMP TO SW 59TH
Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.5m (146.0ft)
Structure Number: 24969, Location: 1/2 MI. N. OF I-240 (Lat: 35.401278, Lng: -97.576428), Route carried "under" structure: Ramp Interstate 44, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2020), Truck Traffic: 7%, Features Intersected: I-44 NB RAMP TO SW 59TH
Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.5m (146.0ft)
Find on map >> Show street view
Structure Number: 25127, Location: 33.0 MI. E. CADDO CO (Lat: 35.476367, Lng: -97.742625), Route carried "under" structure: Interstate 40, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 47,700 (year 2020), Truck Traffic: 43%, Features Intersected: I-40 UNDER, Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.32m (17.45ft), Kilometerpoint: 53.194, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft)
Structure Number: 25127, Location: 33.0 MI. E. CADDO CO (Lat: 35.476367, Lng: -97.742625), Route carried "under" structure: Interstate 40, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 47,700 (year 2020), Truck Traffic: 43%, Features Intersected: I-40 UNDER, Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.32m (17.45ft), Kilometerpoint: 53.194, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft)
Find on map >> Show street view
Structure Number: 25127, Location: 33.0 MI. E. CADDO CO (Lat: 35.476367, Lng: -97.742625), Route carried "under" structure: Ramp State highway 40, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 500 (year 2020), Truck Traffic: 16%, Features Intersected: I-40 UNDER, Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 53.194, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft)
Structure Number: 25127, Location: 33.0 MI. E. CADDO CO (Lat: 35.476367, Lng: -97.742625), Route carried "under" structure: Ramp State highway 40, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 500 (year 2020), Truck Traffic: 16%, Features Intersected: I-40 UNDER, Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 53.194, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft)
Find on map >> Show street view
Structure Number: 25127, Location: 33.0 MI. E. CADDO CO (Lat: 35.476367, Lng: -97.742625), Route carried "under" structure: Ramp State highway 40, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 500 (year 2020), Truck Traffic: 16%, Features Intersected: I-40 UNDER, Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 53.194, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft)
Structure Number: 25127, Location: 33.0 MI. E. CADDO CO (Lat: 35.476367, Lng: -97.742625), Route carried "under" structure: Ramp State highway 40, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 500 (year 2020), Truck Traffic: 16%, Features Intersected: I-40 UNDER, Facility Carried by Structure: CZECH HALL RD.
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 53.194, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft)
Find on map >> Show street view
Structure Number: 25245, Location: 1.7 MI N OF JCT W/ I-40 (Lat: 35.493025, Lng: -97.465489), Route carried "under" structure: Interstate 35, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 73,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 14.706, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 25245, Location: 1.7 MI N OF JCT W/ I-40 (Lat: 35.493025, Lng: -97.465489), Route carried "under" structure: Interstate 35, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 73,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 14.706, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 2535, Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339, Lng: -97.466089), Route carried "under" structure: Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 73,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 12.373, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 2535, Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339, Lng: -97.466089), Route carried "under" structure: Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 73,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 12.373, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 2535, Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339, Lng: -97.466089), Route carried "under" structure: Ramp Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 12.373, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 2535, Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339, Lng: -97.466089), Route carried "under" structure: Ramp Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 12.373, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 2535, Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339, Lng: -97.466089), Route carried "under" structure: Ramp Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 73,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.09m (16.70ft), Kilometerpoint: 12.373, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 2535, Location: 0.3 MI N OF E JCT I-40 (Lat: 35.471339, Lng: -97.466089), Route carried "under" structure: Ramp Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 73,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 UNDER, Facility Carried by Structure: FAU 9476 NE 4TH ST
Minimum Vertical Clearance: 5.09m (16.70ft), Kilometerpoint: 12.373, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 25443, Location: 1.4 MI N OLD US77 (Lat: 35.377564, Lng: -97.495189), Route carried "under" structure: City street , Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: 89TH ST. UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.377, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 25443, Location: 1.4 MI N OLD US77 (Lat: 35.377564, Lng: -97.495189), Route carried "under" structure: City street , Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2020), Truck Traffic: 5%, Features Intersected: 89TH ST. UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.377, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 25443, Location: 1.4 MI N OLD US77 (Lat: 35.377564, Lng: -97.495189), Route carried "under" structure: City street , Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: 89TH ST. UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 25443, Location: 1.4 MI N OLD US77 (Lat: 35.377564, Lng: -97.495189), Route carried "under" structure: City street , Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: 89TH ST. UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 25443, Location: 1.4 MI N OLD US77 (Lat: 35.377564, Lng: -97.495189), Route carried "under" structure: City street , Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: 89TH ST. UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 25443, Location: 1.4 MI N OLD US77 (Lat: 35.377564, Lng: -97.495189), Route carried "under" structure: City street , Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: 89TH ST. UNDER, Facility Carried by Structure: I-35
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 25493, Location: 1 MI E OF WESTERN (Lat: 35.536731, Lng: -97.515028), Route carried "under" structure: US 77, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 92,000 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: NW 63 ST. (FAU R
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.756, Lanes on structure: 7, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.2m (115.5ft)
Structure Number: 25493, Location: 1 MI E OF WESTERN (Lat: 35.536731, Lng: -97.515028), Route carried "under" structure: US 77, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 92,000 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: NW 63 ST. (FAU R
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.756, Lanes on structure: 7, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.2m (115.5ft)
Find on map >> Show street view
Structure Number: 25493, Location: 1 MI E OF WESTERN (Lat: 35.536731, Lng: -97.515028), Route carried "under" structure: Ramp US 77, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 92,000 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: NW 63 ST. (FAU R
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.756, Lanes on structure: 7, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.2m (115.5ft)
Structure Number: 25493, Location: 1 MI E OF WESTERN (Lat: 35.536731, Lng: -97.515028), Route carried "under" structure: Ramp US 77, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 92,000 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: NW 63 ST. (FAU R
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.756, Lanes on structure: 7, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.2m (115.5ft)
Find on map >> Show street view
Structure Number: 25533, Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153, Lng: -97.469869), Route carried "under" structure: Interstate 40, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 EB RAMP& I-40 EB&WB, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 8.50m (27.89ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.6m (202.1ft)
Structure Number: 25533, Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153, Lng: -97.469869), Route carried "under" structure: Interstate 40, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 EB RAMP& I-40 EB&WB, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 8.50m (27.89ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.6m (202.1ft)
Find on map >> Show street view
Structure Number: 25533, Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153, Lng: -97.469869), Route carried "under" structure: Ramp Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 17,764 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 EB RAMP& I-40 EB&WB
Minimum Vertical Clearance: 7.13m (23.39ft), Kilometerpoint: 11.858, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.6m (202.1ft)
Structure Number: 25533, Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153, Lng: -97.469869), Route carried "under" structure: Ramp Interstate 35, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 17,764 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 EB RAMP& I-40 EB&WB
Minimum Vertical Clearance: 7.13m (23.39ft), Kilometerpoint: 11.858, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.6m (202.1ft)
Find on map >> Show street view
Structure Number: 25533, Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153, Lng: -97.469869), Route carried "under" structure: Interstate 40, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 EB RAMP& I-40 EB&WB, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 10.97m (35.99ft), Kilometerpoint: 0.708, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.6m (202.1ft)
Structure Number: 25533, Location: S. EDGE FT. SMITH JCT. (Lat: 35.464153, Lng: -97.469869), Route carried "under" structure: Interstate 40, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 EB RAMP& I-40 EB&WB, Facility Carried by Structure: I-35 NB
Minimum Vertical Clearance: 10.97m (35.99ft), Kilometerpoint: 0.708, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 61.6m (202.1ft)
Find on map >> Show street view
Structure Number: 25554, Location: 1 MI N. OF WILSHIRE BLVD (Lat: 35.565381, Lng: -97.514328), Route carried "under" structure: US 77, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 81,300 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: FAU 9620 (BRITTON
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 3.973, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 25554, Location: 1 MI N. OF WILSHIRE BLVD (Lat: 35.565381, Lng: -97.514328), Route carried "under" structure: US 77, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 81,300 (year 2020), Truck Traffic: 8%, Features Intersected: U.S. 77 UNDER, Facility Carried by Structure: FAU 9620 (BRITTON
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 3.973, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 25823, Location: TOP LVL BR FT. SMITH JCT. (Lat: 35.466875, Lng: -97.468322), Route carried "under" structure: Ramp Interstate 35, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 60,100 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP & I-40 WB UND
Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 11.891, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 25823, Location: TOP LVL BR FT. SMITH JCT. (Lat: 35.466875, Lng: -97.468322), Route carried "under" structure: Ramp Interstate 35, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 60,100 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP & I-40 WB UND
Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 11.891, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 25823, Location: TOP LVL BR FT. SMITH JCT. (Lat: 35.466875, Lng: -97.468322), Route carried "under" structure: Interstate 40, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP & I-40 WB UND, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 25823, Location: TOP LVL BR FT. SMITH JCT. (Lat: 35.466875, Lng: -97.468322), Route carried "under" structure: Interstate 40, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 87,300 (year 2020), Truck Traffic: 12%, Features Intersected: I-35 RAMP & I-40 WB UND, Facility Carried by Structure: I-35 SB
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 25825, Location: MID LVL BR FT. SMITH JCT. (Lat: 35.467225, Lng: -97.467892), Route carried "under" structure: Interstate 40, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 35,070 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 WEST UNDER
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.290, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 25825, Location: MID LVL BR FT. SMITH JCT. (Lat: 35.467225, Lng: -97.467892), Route carried "under" structure: Interstate 40, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 35,070 (year 2020), Truck Traffic: 12%, Features Intersected: I-40 WEST UNDER
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.290, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 25847, Location: 125.69 (Lat: 35.609931, Lng: -97.593919), Route carried "under" structure: Other road 77, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 16%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: CROSSOVER#2
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 15.205, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 25847, Location: 125.69 (Lat: 35.609931, Lng: -97.593919), Route carried "under" structure: Other road 77, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 16%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: CROSSOVER#2
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 15.205, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 25849, Location: 125.19EB (Lat: 35.609494, Lng: -97.602575), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2020), Truck Traffic: 5%, Features Intersected: MERIDIAN AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 15.994, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 25849, Location: 125.19EB (Lat: 35.609494, Lng: -97.602575), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2020), Truck Traffic: 5%, Features Intersected: MERIDIAN AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 15.994, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 2585, Location: 125.19WB (Lat: 35.609806, Lng: -97.602578), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2020), Truck Traffic: 5%, Features Intersected: MERIDIAN AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 15.994, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 2585, Location: 125.19WB (Lat: 35.609806, Lng: -97.602578), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2020), Truck Traffic: 5%, Features Intersected: MERIDIAN AVE. UNDER, Facility Carried by Structure: KILPATRICK TP
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 15.994, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 25853, Location: 124.64 (Lat: 35.609914, Lng: -97.612517), Route carried "under" structure: Other road , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: MARTIN PARK CROSS
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 16.895, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 25853, Location: 124.64 (Lat: 35.609914, Lng: -97.612517), Route carried "under" structure: Other road , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: MARTIN PARK CROSS
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 16.895, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 25854, Location: 124.18 (Lat: 35.609614, Lng: -97.620614), Route carried "under" structure: Other road , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: MACARTHUR BLVD.
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 17.619, Lanes on structure: 4, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 25854, Location: 124.18 (Lat: 35.609614, Lng: -97.620614), Route carried "under" structure: Other road , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: MACARTHUR BLVD.
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 17.619, Lanes on structure: 4, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 25855, Location: 123.68 (Lat: 35.608842, Lng: -97.629467), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: BRANDON PL. UNDER, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 18.424, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.5m (106.6ft)
Structure Number: 25855, Location: 123.68 (Lat: 35.608842, Lng: -97.629467), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: BRANDON PL. UNDER, Facility Carried by Structure: KILPATRICK TP EB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 18.424, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.5m (106.6ft)
Find on map >> Show street view
Structure Number: 25856, Location: 123.68WB (Lat: 35.609219, Lng: -97.629464), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: BRANDON PL. UNDER, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 21.528, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.6m (107.0ft)
Structure Number: 25856, Location: 123.68WB (Lat: 35.609219, Lng: -97.629464), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: BRANDON PL. UNDER, Facility Carried by Structure: KILPATRICK TP WB
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 21.528, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.6m (107.0ft)
Find on map >> Show street view
Structure Number: 25857, Location: 123.18 (Lat: 35.609675, Lng: -97.638419), Route carried "under" structure: Other road , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: ROCKWELL AVE.
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 19.245, Lanes on structure: 5, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.5m (106.6ft)
Structure Number: 25857, Location: 123.18 (Lat: 35.609675, Lng: -97.638419), Route carried "under" structure: Other road , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: ROCKWELL AVE.
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 19.245, Lanes on structure: 5, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.5m (106.6ft)
Find on map >> Show street view
Structure Number: 25861, Location: 122.18 (Lat: 35.610283, Lng: -97.656189), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: COUNCIL RD.
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 20.852, Lanes on structure: 4, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.5m (106.6ft)
Structure Number: 25861, Location: 122.18 (Lat: 35.610283, Lng: -97.656189), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 32,200 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: COUNCIL RD.
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 20.852, Lanes on structure: 4, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.5m (106.6ft)
Find on map >> Show street view
Structure Number: 25864, Location: 121.17 (Lat: 35.609669, Lng: -97.673969), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 20,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: COUNTY LINE RD.
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 22.478, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 25864, Location: 121.17 (Lat: 35.609669, Lng: -97.673969), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 20,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: COUNTY LINE RD.
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 22.478, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 25865, Location: 119.90 (Lat: 35.594989, Lng: -97.687792), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 19,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 2.060, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 25865, Location: 119.90 (Lat: 35.594989, Lng: -97.687792), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 19,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: NW 122ND ST.
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 2.060, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 25867, Location: 118.87NB (Lat: 35.580303, Lng: -97.688747), Route carried "under" structure: State highway 3, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 16,900 (year 2020), Truck Traffic: 5%, Features Intersected: S.H. 3 UNDER, Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 31.311, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 25867, Location: 118.87NB (Lat: 35.580303, Lng: -97.688747), Route carried "under" structure: State highway 3, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 16,900 (year 2020), Truck Traffic: 5%, Features Intersected: S.H. 3 UNDER, Facility Carried by Structure: KILPATRICK TP NB
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 31.311, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 25868, Location: 118.87SB (Lat: 35.580489, Lng: -97.689172), Route carried "under" structure: State highway 3, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 16,900 (year 2020), Truck Traffic: 5%, Features Intersected: S.H. 3 UNDER, Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 31.295, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 25868, Location: 118.87SB (Lat: 35.580489, Lng: -97.689172), Route carried "under" structure: State highway 3, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 16,900 (year 2020), Truck Traffic: 5%, Features Intersected: S.H. 3 UNDER, Facility Carried by Structure: KILPATRICK TP SB
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 31.295, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 25869, Location: 117.88 (Lat: 35.565753, Lng: -97.689389), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 20,900 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 5.325, Lanes on structure: 2, Lanes under structure: 5, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 25869, Location: 117.88 (Lat: 35.565753, Lng: -97.689389), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 20,900 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: BRITTON RD.
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 5.325, Lanes on structure: 2, Lanes under structure: 5, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 2587, Location: 116.87 (Lat: 35.551139, Lng: -97.689419), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 22,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: WILSHIRE BLVD.
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 6.935, Lanes on structure: 2, Lanes under structure: 6, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 2587, Location: 116.87 (Lat: 35.551139, Lng: -97.689419), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 22,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: WILSHIRE BLVD.
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 6.935, Lanes on structure: 2, Lanes under structure: 6, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 25875, Location: 116.11 (Lat: 35.536819, Lng: -97.694794), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 22,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: NW 63RD ST.
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 8.657, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 25875, Location: 116.11 (Lat: 35.536819, Lng: -97.694794), Route carried "under" structure: Other road , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 22,700 (year 2020), Truck Traffic: 8%, Features Intersected: KILPATRICK TP UNDER, Facility Carried by Structure: NW 63RD ST.
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 8.657, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)