Bridge Statistics for New Orleans, Louisiana (LA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 840Number of bridges
  • 69,872ft / 21,297mTotal length
  • $922,208,000Total costs
  • 18,135,528Total average daily traffic
  • 2,072,962Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Orleans
  • No street view available for this location

New bridges in New Orleans, LA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 151930-1939
  • 101940-1949
  • 351950-1959
  • 1601960-1969
  • 901970-1979
  • 741980-1989
  • 871990-1999
  • 242000-2009
  • 192010-2019
  • 12020-2022
Average Bridge Daily Traffic in New Orleans, LA
Average Bridge Truck Traffic in New Orleans, LA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.3%Very good
  • 52.9%Good
  • 31.1%Satisfactory
  • 11.6%Fair
  • 1.1%Poor
  • 1.1%Serious
  • 0.8%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.7%Very good
  • 42.0%Good
  • 25.4%Satisfactory
  • 12.8%Fair
  • 3.4%Poor
  • 1.7%Serious
  • 0.2%Imminent failure
  • 0.8%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.4%Very good
  • 44.7%Good
  • 20.6%Satisfactory
  • 9.5%Fair
  • 7.4%Poor
  • 1.5%Serious
  • 0.2%Imminent failure
  • 0.8%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 52.1%Very good
  • 33.3%Good
  • 6.7%Satisfactory
  • 5.0%Fair
  • 1.7%Poor
  • 1.3%Failed
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 4.9%Very good
  • 75.6%Good
  • 12.2%Satisfactory
  • 4.9%Fair
  • 2.4%Serious
Find on map >>   Show street view

Structure Number: 23600060600001,  Location: 8.7 MILES EAST OF CHEF PA (Lat: 30.165061,  Lng: -89.739700),  Route carried "on" structure: US 90,  Year Built: 2008,  Status: Open,  Structure Length: 155.27m (509.42ft),  Average Daily Traffic: 1,410 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,499 (year 2036),  Design Load: HS 20,  Features Intersected: RIGOLETS PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 6-06-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 19.8m (65.0ft), Horizontal Clearance: 69.8m (229.0ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 35,  Number Of Approach Spans: 18,  Length of Maximum Span: 79.2m (259.8ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: October 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23600069001041,  Location: 0.50 M NORTH OF I-10 (Lat: 30.006850,  Lng: -90.032200),  Route carried "on" structure: US 90,  Year Built: 1989,  Status: Open,  Structure Length: 99.67m (327.00ft),  Average Daily Traffic: 33,300 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,710 (year 2036),  Design Load: HS 20,  Features Intersected: IND CL/FRANCE RD/N.O. RR
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 1.690,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes (Inventory Route: 6-90-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 30.5m (100.1ft), Horizontal Clearance: 95.4m (313.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 58,  Length of Maximum Span: 100.6m (330.1ft),  Curb-To-Curb Width: 27.1m (88.9ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2020,  Critical Feature Inspection Date: January 2020,  Underwater Inspection Date: November 2017,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600069001218,  Location: 0.50 M NORTH OF I-10 (Lat: 30.007961,  Lng: -90.029300),  Route carried "on" structure: Ramp US 90,  Year Built: 1989,  Status: Open,  Structure Length: 22.43m (73.59ft),  Average Daily Traffic: 3,330 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,471 (year 2036),  Design Load: HS 20,  Features Intersected: FRANCE RD/N.O. BELT R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 8,  Length of Maximum Span: 43.9m (144.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600069001235,  Location: 0.50 M NORTH OF I-10 (Lat: 30.007511,  Lng: -90.028400),  Route carried "on" structure: Ramp US 90,  Year Built: 1989,  Status: Open,  Structure Length: 30.45m (99.90ft),  Average Daily Traffic: 3,330 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,471 (year 2036),  Design Load: HS 20,  Features Intersected: RAMP A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 10,  Number Of Approach Spans: 10,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 23600069010641,  Location: 9.9 MI NORTH OF I-10 (Lat: 30.052061,  Lng: -89.880400),  Route carried "on" structure: US 90,  Year Built: 1965,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 5,300 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 8,330 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.281,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 6-90-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2020,  Underwater Inspection Date: Febuary 2019,  Bridge Improvement Cost: $177,000,  Total Project Cost: $265,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600070101061,  Location: US 61 OVER I-10 (Lat: 29.969450,  Lng: -90.107400),  Route carried "on" structure: US 61,  Year Built: 1940,  Status: Posted for load,  Structure Length: 43.95m (144.19ft),  Average Daily Traffic: 19,200 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 36,550 (year 2036),  Design Load: HS 20,  Features Intersected: I-10
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.835,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes (Inventory Route: 7-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 28,  Number Of Approach Spans: 9,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 43.95m (144.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,623,000,  Total Project Cost: $8,434,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23600070101701,  Location: .6 MI EAST OF I-10 (Lat: 29.971600,  Lng: -90.116900),  Route carried "on" structure: US 61,  Year Built: 1939,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 18,150 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,986 (year 2036),  Design Load: H 15,  Features Intersected: METAIRIE RELIEF CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.799,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 7-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $447,000,  Total Project Cost: $670,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600070101702,  Location: 0.6 MI. WEST OF I-10 (Lat: 29.971450,  Lng: -90.117089),  Route carried "on" structure: US 61,  Year Built: 1939,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 18,150 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,986 (year 2036),  Design Load: H 15,  Features Intersected: METAIRIE RELIEF CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.887,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 7-01-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $447,000,  Total Project Cost: $670,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23600180104021,  Location: 4.02 MI NORTH OF US 90 (Lat: 30.130689,  Lng: -89.867300),  Route carried "on" structure: US 11,  Year Built: 1978,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 3,300 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,440 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.497,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 18-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600180104831,  Location: 4.83 MI NORTH OF US 90 (Lat: 30.141200,  Lng: -89.864039),  Route carried "on" structure: US 11,  Year Built: 1978,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 3,300 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,440 (year 2036),  Design Load: HS 20,  Features Intersected: IRISH BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.707,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 18-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2019,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $962,000,  Total Project Cost: $1,443,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600180105351,  Location: 5.35 MI NORTH OF US 90 (Lat: 30.148581,  Lng: -89.859081),  Route carried "on" structure: US 11,  Year Built: 1967,  Status: Open,  Structure Length: 52.73m (173.00ft),  Average Daily Traffic: 3,300 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,440 (year 2036),  Design Load: HS 20,  Features Intersected: US 11 OVER I-10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.660,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 18-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 21,  Length of Maximum Span: 55.8m (183.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600180200001,  Location: .01 MI NORTH OF I-10 (Lat: 30.155439,  Lng: -89.856069),  Route carried "on" structure: US 11,  Year Built: 1938,  Status: Closed,  Structure Length: 759.62m (2492.19ft),  Average Daily Traffic: 6,800 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,560 (year 2036),  Design Load: H 15,  Features Intersected: LAKE PONTCHARTRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.006,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 18-02-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Navigation Control: Yes ( Vertical Clearance: 304.5m (999.0ft), Horizontal Clearance: 46.6m (152.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 702,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Imminent failure,  Substructure: Imminent failure,  Channel: Very good,  Operating Rating: 2.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 1.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 759.62m (2492.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: January 2020,  Critical Feature Inspection Date: January 2020,  Underwater Inspection Date: January 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $64,797,000,  Total Project Cost: $97,195,000 ( Estimate for 2016),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 23600460202211,  Location: 2.21 MI SOUTH OF LA 39 (Lat: 29.964131,  Lng: -90.028800),  Route carried "on" structure: State highway 46,  Year Built: 1960,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 21,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,060 (year 2036),  Design Load: HS 20,  Features Intersected: NO PUBLIC BELT R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.349,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 46-02-1,  Subroute: 10),  Owner: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $234,000,  Total Project Cost: $351,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23600460202341,  Location: 2.34 MI SOUTH OF LA 39 (Lat: 29.963589,  Lng: -90.026500),  Route carried "on" structure: State highway 46,  Year Built: 1960,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 21,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,060 (year 2036),  Design Load: HS 20,  Features Intersected: SISTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.582,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 46-02-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $234,000,  Total Project Cost: $351,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23600463101201,  Location: .6 MI EAST OF LA 3021 (Lat: 29.972661,  Lng: -90.047800),  Route carried "on" structure: State highway 39,  Year Built: 1962,  Status: Open,  Structure Length: 40.45m (132.71ft),  Average Daily Traffic: 17,100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,190 (year 2036),  Design Load: HS 20,  Features Intersected: N O P B RR (ROBERTSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 46-31-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Number Of Approach Spans: 14,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.45m (132.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,450,000,  Total Project Cost: $5,175,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600463101202,  Location: .6 MI EAST OF LA 3021 (Lat: 29.972889,  Lng: -90.043500),  Route carried "on" structure: State highway 39,  Year Built: 1949,  Status: Open,  Structure Length: 35.84m (117.59ft),  Average Daily Traffic: 17,100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,190 (year 2036),  Design Load: HS 20,  Features Intersected: N O P B RR(CLAIBORNE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.001,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 46-31-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Number Of Approach Spans: 19,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 35.84m (117.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,057,000,  Total Project Cost: $4,585,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23600463102221,  Location: 1.6 MI EAST OF LA 3021 (Lat: 29.968769,  Lng: -90.029400),  Route carried "on" structure: State highway 39,  Year Built: 1957,  Status: Posted for load,  Structure Length: 18.59m (60.99ft),  Average Daily Traffic: 32,700 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 53,210 (year 2036),  Design Load: HS 20,  Features Intersected: INDUSTRIAL CANAL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 3.568,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 46-31-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 48.8m (160.1ft), Horizontal Clearance: 99.1m (325.1ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 10,  Number Of Approach Spans: 7,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23600463102222,  Location: LA 39 (Lat: 29.969231,  Lng: -90.027600),  Route carried "on" structure: State highway 39,  Year Built: 1957,  Status: Posted for load,  Structure Length: 18.44m (60.50ft),  Average Daily Traffic: 16,350 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 53,210 (year 2036),  Design Load: HS 20,  Features Intersected: INDUSTRIAL CANAL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 2.400,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 46-31-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Number Of Approach Spans: 7,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 19.17m (62.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $1,635,000,  Total Project Cost: $2,452,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23600463102341,  Location: LA 39 @ POLAND AVENUE (Lat: 29.969139,  Lng: -90.027500),  Route carried "on" structure: State highway 39,  Year Built: 1957,  Status: Posted for load,  Structure Length: 46.79m (153.51ft),  Average Daily Traffic: 32,700 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 53,210 (year 2036),  Design Load: HS 20,  Features Intersected: INNER HARBOR NAV CANAL
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 3.750,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 46-31-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 48.8m (160.1ft), Horizontal Clearance: 93.0m (305.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 22,  Length of Maximum Span: 109.7m (359.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: November 2017,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 23600463102631,  Location: LA 39 (Lat: 29.968111,  Lng: -90.022900),  Route carried "on" structure: State highway 39,  Year Built: 1957,  Status: Posted for load,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 16,350 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 53,210 (year 2036),  Design Load: HS 20,  Features Intersected: INDUSTRIAL CANAL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 4.220,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 46-31-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $806,000,  Total Project Cost: $1,209,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23600463102632,  Location: LA 39 (Lat: 29.968000,  Lng: -90.022100),  Route carried "on" structure: State highway 39,  Year Built: 1957,  Status: Posted for load,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 16,350 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 53,210 (year 2036),  Design Load: HS 20,  Features Intersected: INDUSTRIAL CANAL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.846,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 46-31-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $806,000,  Total Project Cost: $1,209,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23601480200001,  Location: 3.0 MI SOUTH OF I-10 (Lat: 29.981561,  Lng: -89.945419),  Route carried "on" structure: State highway 47,  Year Built: 1973,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 31,300 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,770 (year 2036),  Design Load: HS 20,  Features Intersected: BAYOU BIENVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 148-02-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.06m (33.01ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: Febuary 2019,  Bridge Improvement Cost: $1,458,000,  Total Project Cost: $2,187,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23601480201061,  Location: 2.0 MI SOUTH OF I-10 (Lat: 29.996119,  Lng: -89.939900),  Route carried "on" structure: State highway 47,  Year Built: 1967,  Status: Open,  Structure Length: 201.84m (662.20ft),  Average Daily Traffic: 29,900 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,770 (year 2036),  Design Load: HS 20,  Features Intersected: I C WATERWAY(GULF OUTLET
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 1.711,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 148-02-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 152.4m (500.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 66,  Length of Maximum Span: 214.0m (702.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: November 2017,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800411,  Location: .4 MI SOUTH OF I-10 (Lat: 29.954031,  Lng: -90.089100),  Route carried "on" structure: Business US 90,  Year Built: 1960,  Status: Open,  Structure Length: 149.26m (489.70ft),  Average Daily Traffic: 87,600 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 173,196 (year 2036),  Design Load: HS 20,  Features Intersected: R/R, CITY STS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.587,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 283-08-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 80,  Number Of Approach Spans: 7,  Length of Maximum Span: 54.0m (177.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800412,  Location: .4 MI SOUTH OF I-10 (Lat: 29.945619,  Lng: -90.079400),  Route carried "on" structure: Business US 90,  Year Built: 1960,  Status: Open,  Structure Length: 136.58m (448.10ft),  Average Daily Traffic: 87,600 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 173,196 (year 2036),  Design Load: HS 20,  Features Intersected: R/R, CITY STS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.428,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 283-08-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 72,  Number Of Approach Spans: 7,  Length of Maximum Span: 54.0m (177.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 136.58m (448.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $11,650,000,  Total Project Cost: $17,475,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800497,  Location: .5 MI SOUTH OF I-10 (Lat: 29.952650,  Lng: -90.087700),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 33.83m (110.99ft),  Average Daily Traffic: 4,610 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,868 (year 2036),  Design Load: HS 20,  Features Intersected: RAMPS
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.108,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Number Of Approach Spans: 6,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800525,  Location: .52 MI SOUTH OF I-10 (Lat: 29.951561,  Lng: -90.085000),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 42.37m (139.01ft),  Average Daily Traffic: 13,000 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,873 (year 2036),  Design Load: HS 20,  Features Intersected: RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 29,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800565,  Location: .56 MI SOUTH OF I-10 (Lat: 29.950681,  Lng: -90.086000),  Route carried "on" structure: Ramp US 90,  Year Built: 1994,  Status: Open,  Structure Length: 14.57m (47.80ft),  Average Daily Traffic: 13,000 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,873 (year 2036),  Design Load: HS 20,  Features Intersected: EAST SERVICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.039,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23602830800566,  Location: .56 MI SOUTH OF I-10 (Lat: 29.951650,  Lng: -90.085300),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 13,000 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,873 (year 2036),  Design Load: HS 20,  Features Intersected: ON RAMP US 90-B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.035,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 7,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800648,  Location: .64 MI SOUTH OF I-10 (Lat: 29.951650,  Lng: -90.085461),  Route carried "on" structure: Ramp US 90,  Year Built: 1994,  Status: Open,  Structure Length: 32.74m (107.41ft),  Average Daily Traffic: 13,000 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,873 (year 2036),  Design Load: HS 20,  Features Intersected: CITY STS. & RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.034,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23602830800677,  Location: .67 MI SOUTH OF I-10 (Lat: 29.950639,  Lng: -90.086500),  Route carried "on" structure: Ramp US 90,  Year Built: 1994,  Status: Open,  Structure Length: 28.80m (94.49ft),  Average Daily Traffic: 4,610 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,868 (year 2036),  Design Load: HS 20,  Features Intersected: CITY STS., RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.195,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 6,  Length of Maximum Span: 55.2m (181.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23602830800696,  Location: .69 MI SOUTH OF I-10 (Lat: 29.950211,  Lng: -90.085300),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 16.25m (53.31ft),  Average Daily Traffic: 4,610 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,868 (year 2036),  Design Load: HS 20,  Features Intersected: RAMP B
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.056,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 8,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800758,  Location: .75 MI SOUTH OF I-10 (Lat: 29.950281,  Lng: -90.084500),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 4,610 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,868 (year 2036),  Design Load: HS 20,  Features Intersected: US 90-B W.OFF RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.822,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 7,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800778,  Location: .77 MI SOUTH OF I-10 (Lat: 29.950150,  Lng: -90.084700),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 19.29m (63.29ft),  Average Daily Traffic: 4,610 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,778 (year 2036),  Design Load: HS 20,  Features Intersected: S SERVICE RD/RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.085,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 192.9m (632.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23602830800787,  Location: .78 MI SOUTH OF I-10 (Lat: 29.949500,  Lng: -90.084900),  Route carried "on" structure: Ramp US 90,  Year Built: 1994,  Status: Open,  Structure Length: 35.36m (116.01ft),  Average Daily Traffic: 17,520 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 28,866 (year 2036),  Design Load: HS 20,  Features Intersected: CITY STREETS
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.072,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 11,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23602830800915,  Location: .91 MI SOUTH OF I-10 (Lat: 29.954581,  Lng: -90.082900),  Route carried "on" structure: Ramp US 90,  Year Built: 1994,  Status: Open,  Structure Length: 111.77m (366.70ft),  Average Daily Traffic: 17,010 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 25,262 (year 2036),  Design Load: HS 20,  Features Intersected: CITY STS, I10 RAMPS, US9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.126,  Lanes on structure: 2,  Lanes under structure: 20,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 26,  Length of Maximum Span: 64.6m (211.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 111.77m (366.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $9,534,000,  Total Project Cost: $14,301,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23602830800984,  Location: .98 MI SOUTH OF I-10 (Lat: 29.947769,  Lng: -90.082250),  Route carried "on" structure: Alternate US 90,  Year Built: 1996,  Status: Open,  Structure Length: 170.57m (559.61ft),  Average Daily Traffic: 17,520 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 28,866 (year 2036),  Design Load: HS 20,  Features Intersected: CITY STS.US.90BN/B RMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.761,  Lanes on structure: 2,  Lanes under structure: 20,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 34,  Number Of Approach Spans: 19,  Length of Maximum Span: 75.3m (247.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23602830801175,  Location: 1.17 MI SOUTH OF I-10 (Lat: 29.943119,  Lng: -90.075500),  Route carried "on" structure: Ramp US 90,  Year Built: 1960,  Status: Open,  Structure Length: 15.54m (50.98ft),  Average Daily Traffic: 17,520 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 28,866 (year 2036),  Design Load: HS 20,  Features Intersected: RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.124,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 5,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place