Bridge Statistics for Mobile, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 342Number of bridges
  • 17,884ft / 5,451mTotal length
  • $2,276,753,000Total costs
  • 5,331,403Total average daily traffic
  • 449,063Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mobile
  • No street view available for this location

New bridges in Mobile, AL - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 131930-1939
  • 21940-1949
  • 181950-1959
  • 941960-1969
  • 701970-1979
  • 361980-1989
  • 731990-1999
  • 192000-2009
  • 102010-2019
  • 22020-2022
Reconstructed bridges in Mobile, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 51970-1979
  • 231980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Mobile, AL
Average Bridge Truck Traffic in Mobile, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.8%Excellent
  • 4.2%Very good
  • 13.4%Good
  • 47.9%Satisfactory
  • 31.9%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.2%Very good
  • 20.2%Good
  • 31.9%Satisfactory
  • 36.1%Fair
  • 1.7%Poor
  • 0.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Very good
  • 23.5%Good
  • 34.5%Satisfactory
  • 32.8%Fair
  • 2.5%Poor
  • 1.7%Serious
  • 0.8%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.6%Very good
  • 39.2%Good
  • 39.2%Satisfactory
  • 9.0%Fair
  • 1.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 13.8%Good
  • 50.9%Satisfactory
  • 35.3%Fair
Find on map >>   Show street view

Structure Number: 12836,  Location: 0.2 MI N HAMILTON BLVD (Lat: 30.554639,  Lng: -88.123472),  Route carried "on" structure: State highway 193,  Year Built: 1979,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 17,447 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 26,171 (year 2039),  Design Load: HS 20,  Features Intersected: ALLIGATOR BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.516,  Lanes on structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 16 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $5,973,000,  Roadway Improvement Cost: $597,000,  Total Project Cost: $6,570,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12874,  Location: 1.9 MI W I-65 (Lat: 30.633400,  Lng: -88.145083),  Route carried "on" structure: US 90,  Year Built: 1950,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 26,875 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 40,313 (year 2039),  Design Load: HS 20,  Features Intersected: MOORE'S CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.277,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 22.8m (74.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,879,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $3,167,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12946,  Location: 1095' S. COTTAGE HILL RD (Lat: 30.636672,  Lng: -88.178722),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 579 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 863 (year 2041),  Design Load: HS 15,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: WEST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.520,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,023,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,125,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12949,  Location: 0.5 MI S COTTAGE HILL RD (Lat: 30.636253,  Lng: -88.173972),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 9,020 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,440 (year 2041),  Design Load: HS 15,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: KNOLLWOOD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.889,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $965,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,062,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1301,  Location: BURMA RD. @ BARCELONA DR. (Lat: 30.640189,  Lng: -88.148733),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7,958 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,858 (year 2041),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: BURMA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.170,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $669,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13048,  Location: 695' N AIRPORT BLVD (Lat: 30.678303,  Lng: -88.101097),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,732 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,561 (year 2042),  Design Load: HS 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: MT. ISLAND DR W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $537,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13061,  Location: 1.6 MI N HAMILTON BLVD (Lat: 30.572678,  Lng: -88.134117),  Route carried "on" structure: State highway 193,  Year Built: 1983,  Status: Open,  Structure Length: 17.50m (57.41ft),  Average Daily Traffic: 12,561 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 18,842 (year 2038),  Design Load: HS 20,  Features Intersected: RABBIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.801,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.20m (59.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $5,241,000,  Roadway Improvement Cost: $524,000,  Total Project Cost: $5,765,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13062,  Location: 1.2 MI S I-10 (Lat: 30.581447,  Lng: -88.140061),  Route carried "on" structure: State highway 193,  Year Built: 1983,  Status: Open,  Structure Length: 36.24m (118.90ft),  Average Daily Traffic: 12,561 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 18,842 (year 2038),  Design Load: HS 20,  Features Intersected: RATTLESNAKE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.927,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.1m (36.4ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 29,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 36.24m (118.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $10,437,000,  Roadway Improvement Cost: $1,044,000,  Total Project Cost: $11,481,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13063,  Location: 0.7 MI S I-10 (Lat: 30.588919,  Lng: -88.145092),  Route carried "on" structure: State highway 193,  Year Built: 1983,  Status: Open,  Structure Length: 17.31m (56.79ft),  Average Daily Traffic: 12,672 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,008 (year 2039),  Design Load: HS 20,  Features Intersected: CSX RR / TILLMANS CRN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.860,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.02m (59.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $5,191,000,  Roadway Improvement Cost: $519,000,  Total Project Cost: $5,710,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13117,  Location: 1 MI S. COTTAGE HILL RD (Lat: 30.626222,  Lng: -88.207736),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 2.20m (7.22ft),  Average Daily Traffic: 8,469 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,584 (year 2040),  Design Load: HS 20,  Features Intersected: SECOND CREEK,  Facility Carried by Structure: SOLLIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.549,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $792,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13207,  Location: 2.0 MI N THREE NOTCH ROAD (Lat: 30.615794,  Lng: -88.207694),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 7,521 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,176 (year 2040),  Design Load: HS 20,  Features Intersected: HALLS MILL CREEK,  Facility Carried by Structure: SOLLIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $836,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13209,  Location: 0.1 MI E OF COCA-COLA RD (Lat: 30.618333,  Lng: -88.165000),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 111 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 166 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: MOTEL COURT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $459,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13358,  Location: 495' N AIRPORT BLVD (Lat: 30.677644,  Lng: -88.104925),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 21,530 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 32,080 (year 2042),  Design Load: HS 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: FLORIDA STREET
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.150,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 25.2m (82.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $880,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13667,  Location: 0.6 MI E SCHILLENGER RD (Lat: 30.692600,  Lng: -88.216300),  Route carried "on" structure: City street 70,  Year Built: 1985,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 16,738 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,490 (year 2041),  Design Load: H 20,  Features Intersected: MILKHOUSE CREEK,  Facility Carried by Structure: OLD SHELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,314,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,445,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13772,  Location: 0.3 MI N HALLS MILLRD (Lat: 30.616969,  Lng: -88.157006),  Route carried "on" structure: City street ,  Year Built: 1949,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 4,894 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,292 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: DEMETROPOLIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $618,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13791,  Location: 4.5 MI W I-65 (Lat: 30.743847,  Lng: -88.180417),  Route carried "on" structure: US 98,  Year Built: 1956,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 24,805 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 37,208 (year 2039),  Design Load: HS 20,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.515,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,952,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,147,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13798,  Location: I65 @ US 98 (Lat: 30.706203,  Lng: -88.122500),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 13.62m (44.69ft),  Average Daily Traffic: 92,362 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 138,543 (year 2038),  Design Load: HS 20,  Features Intersected: ICG RR * US 98
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.114,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.5m (146.0ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 43.7m (143.4ft),  Out-to-Out Width: 45.4m (149.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.43m (47.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $14,744,000,  Roadway Improvement Cost: $1,474,000,  Total Project Cost: $16,218,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 138,  Location: 0.3 MI W I 65 (Lat: 30.660219,  Lng: -88.128544),  Route carried "on" structure: Bypass City street ,  Year Built: 1986,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 29,118 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 43,386 (year 2041),  Design Load: HS 20,  Features Intersected: MONTLIMAR CREEK,  Facility Carried by Structure: COTTAGE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.699,  Lanes on structure: 7,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 31.3m (102.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $4,338,000,  Roadway Improvement Cost: $434,000,  Total Project Cost: $4,772,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13806,  Location: I-65 @ US 90 (Lat: 30.651764,  Lng: -88.122303),  Route carried "on" structure: Interstate 65,  Year Built: 1961,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 90,572 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 181,035 (year 2038),  Design Load: HS 20,  Features Intersected: US 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.055,  Lanes on structure: 8,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.0m (141.1ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 42.9m (140.7ft),  Out-to-Out Width: 44.4m (145.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $9,264,000,  Roadway Improvement Cost: $926,000,  Total Project Cost: $10,190,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13807,  Location: 0.6 MI N US 90 (Lat: 30.661183,  Lng: -88.126214),  Route carried "on" structure: Interstate 65,  Year Built: 1961,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 90,572 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 135,858 (year 2038),  Design Load: HS 20,  Features Intersected: COTTAGE HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.170,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 36.0m (118.1ft),  Out-to-Out Width: 37.8m (124.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 40.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.01m (26.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $6,813,000,  Roadway Improvement Cost: $681,000,  Total Project Cost: $7,494,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13809,  Location: I-65 @ DAUPHIN ST (Lat: 30.688183,  Lng: -88.126803),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 34,435 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 51,653 (year 2038),  Design Load: HS 20,  Features Intersected: I-65,  Facility Carried by Structure: DAUPHIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.59m (31.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $5,654,000,  Roadway Improvement Cost: $565,000,  Total Project Cost: $6,219,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1381,  Location: 0.5 MI S US 98 (Lat: 30.698414,  Lng: -88.124233),  Route carried "on" structure: Interstate 65,  Year Built: 1962,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 106,136 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 159,204 (year 2038),  Design Load: HS 20,  Features Intersected: OLD SHELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.322,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 40.2m (131.9ft),  Out-to-Out Width: 41.7m (136.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,049,000,  Roadway Improvement Cost: $605,000,  Total Project Cost: $6,654,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13811,  Location: 0.2 MI S US 98 (Lat: 30.703442,  Lng: -88.123167),  Route carried "on" structure: Interstate 65,  Year Built: 1962,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 106,136 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 159,204 (year 2038),  Design Load: HS 20,  Features Intersected: SPRING HILL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.884,  Lanes on structure: 7,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 40.8m (133.9ft),  Out-to-Out Width: 41.7m (136.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,967,000,  Roadway Improvement Cost: $697,000,  Total Project Cost: $7,664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13812,  Location: 1 MI N US 98 (Lat: 30.719831,  Lng: -88.120517),  Route carried "on" structure: Interstate 65,  Year Built: 1962,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 86,547 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 129,821 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.713,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,001,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $3,301,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13975,  Location: 0.3 MI N COTTAGE HILL RD (Lat: 30.662383,  Lng: -88.133225),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 15,356 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,881 (year 2041),  Design Load: HS 20,  Features Intersected: BOLTON BRANCH,  Facility Carried by Structure: MONTLIMAR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.319,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.99m (6.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,692,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $1,861,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14005,  Location: 781 N. E. WATER STREET (Lat: 30.701344,  Lng: -88.041892),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 43.43m (142.49ft),  Average Daily Traffic: 8,729 (year 2020),  Truck Traffic: 50%,  Average Future Daily Traffic: 12,953 (year 2040),  Design Load: HS 20,  Features Intersected: CSX R.R.,  Facility Carried by Structure: ACCESS AL ST DOCK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.150,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 16,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 43.43m (142.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $12,806,000,  Roadway Improvement Cost: $1,281,000,  Total Project Cost: $14,087,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1437,  Location: 0.5 MI E I65 (Lat: 30.676203,  Lng: -88.118928),  Route carried "on" structure: City street ,  Year Built: 1961,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 26,547 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 39,554 (year 2042),  Design Load: H 15,  Features Intersected: ESLAVA CREEK,  Facility Carried by Structure: AIRP'T BLVD * S R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.499,  Lanes on structure: 8,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 39.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,242,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $3,566,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14373,  Location: 0.2 MI S. AIRPORT BLVD (Lat: 30.673706,  Lng: -88.114508),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,268 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,360 (year 2042),  Design Load: H 20,  Features Intersected: ESLAVA CREEK,  Facility Carried by Structure: SAGE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $839,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $923,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14651,  Location: 222 S DAU ST @ SPRDL BLV (Lat: 30.688075,  Lng: -88.123167),  Route carried "on" structure: ServiceCity street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 9,206 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,717 (year 2042),  Design Load: H 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $452,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14688,  Location: 0.1 MI W ROCHELLE STREET (Lat: 30.613261,  Lng: -88.154261),  Route carried "on" structure: City street ,  Year Built: 1926,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 9,032 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,458 (year 2041),  Design Load: H 20,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: HALLS MILL RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $559,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14689,  Location: 0.2 MI W MC VAY DR (Lat: 30.645386,  Lng: -88.112172),  Route carried "on" structure: City street ,  Year Built: 1926,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 9,305 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,864 (year 2042),  Design Load: HS 20,  Features Intersected: BOLTON BRANCH,  Facility Carried by Structure: HALLS MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 78.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $349,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14741,  Location: 1 MI W SR 163 (Lat: 30.632067,  Lng: -88.105383),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 77,531 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 116,296 (year 2040),  Design Load: HS 20,  Features Intersected: NAVCO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.964,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.2m (145.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 44.2m (145.0ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $5,893,000,  Roadway Improvement Cost: $589,000,  Total Project Cost: $6,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14742,  Location: 0.5 MI W SR 163 (Lat: 30.636436,  Lng: -88.096358),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Year Reconstructed: 1988,  Status: Temporarily open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 88,195 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 132,292 (year 2038),  Design Load: HS 20,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.952,  Lanes on structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.1m (144.7ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 44.1m (144.7ft),  Out-to-Out Width: 45.6m (149.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $11,523,000,  Roadway Improvement Cost: $1,152,000,  Total Project Cost: $12,675,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14743,  Location: 3 MI E SR 163 (Lat: 30.667322,  Lng: -88.049897),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 81,769 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 122,653 (year 2038),  Design Load: HS 20,  Features Intersected: ICG RR * TENN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.630,  Lanes on structure: 10,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 52.4m (171.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 50.8m (166.7ft),  Out-to-Out Width: 52.3m (171.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $9,536,000,  Roadway Improvement Cost: $954,000,  Total Project Cost: $10,490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14753,  Location: 1.8 MI E SR 163 (Lat: 30.655200,  Lng: -88.066583),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 77,593 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 116,390 (year 2038),  Design Load: HS 20,  Features Intersected: DUVAL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.536,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.8m (147.0ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 44.8m (147.0ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.79m (28.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $8,978,000,  Roadway Improvement Cost: $898,000,  Total Project Cost: $9,876,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14754,  Location: 2.4 MI E SR 163 (Lat: 30.660850,  Lng: -88.058400),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 77,593 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 116,389 (year 2038),  Design Load: HS 20,  Features Intersected: BROAD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.487,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.9m (144.0ft),  Skew: 26 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 43.9m (144.0ft),  Out-to-Out Width: 45.4m (149.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.84m (35.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $11,074,000,  Roadway Improvement Cost: $1,107,000,  Total Project Cost: $12,181,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14755,  Location: 3.1 MI E SR 163 (Lat: 30.668686,  Lng: -88.048811),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 81,769 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 122,653 (year 2038),  Design Load: HS 20,  Features Intersected: SOUTH CAROLINA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.802,  Lanes on structure: 10,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 53.0m (173.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 50.6m (166.0ft),  Out-to-Out Width: 53.0m (173.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,984,000,  Roadway Improvement Cost: $698,000,  Total Project Cost: $7,682,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14756,  Location: 3.3 MI E SR 163 (Lat: 30.671061,  Lng: -88.046903),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 81,769 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 122,653 (year 2038),  Design Load: HS 20,  Features Intersected: VIRGINIA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.124,  Lanes on structure: 9,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.8m (163.4ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 50.8m (166.7ft),  Out-to-Out Width: 52.3m (171.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $7,534,000,  Roadway Improvement Cost: $753,000,  Total Project Cost: $8,287,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14757,  Location: 3.6 MI E SR 163 (Lat: 30.674311,  Lng: -88.044547),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 81,769 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 122,654 (year 2038),  Design Load: HS 20,  Features Intersected: TEXAS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.552,  Lanes on structure: 10,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.4m (162.1ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 49.2m (161.4ft),  Out-to-Out Width: 50.0m (164.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.39m (20.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $7,191,000,  Roadway Improvement Cost: $719,000,  Total Project Cost: $7,910,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 152,  Location: 0.15 MI E. COTTAGE H. RD (Lat: 30.661594,  Lng: -88.122286),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 11,876 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,695 (year 2042),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: PLEASANT VALLEY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.830,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,456,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,602,000 ( Estimate for 2022)
Discuss Mobile, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.