Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mobile, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 342Number of bridges
  • 17,884ft / 5,451mTotal length
  • $2,276,753,000Total costs
  • 5,331,403Total average daily traffic
  • 449,063Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mobile
  • No street view available for this location

New bridges in Mobile, AL - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 131930-1939
  • 21940-1949
  • 181950-1959
  • 941960-1969
  • 701970-1979
  • 361980-1989
  • 731990-1999
  • 192000-2009
  • 102010-2019
  • 22020-2022
Reconstructed bridges in Mobile, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 51970-1979
  • 231980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Mobile, AL
Average Bridge Truck Traffic in Mobile, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.8%Excellent
  • 4.2%Very good
  • 13.4%Good
  • 47.9%Satisfactory
  • 31.9%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.2%Very good
  • 20.2%Good
  • 31.9%Satisfactory
  • 36.1%Fair
  • 1.7%Poor
  • 0.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Very good
  • 23.5%Good
  • 34.5%Satisfactory
  • 32.8%Fair
  • 2.5%Poor
  • 1.7%Serious
  • 0.8%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.6%Very good
  • 39.2%Good
  • 39.2%Satisfactory
  • 9.0%Fair
  • 1.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 13.8%Good
  • 50.9%Satisfactory
  • 35.3%Fair
Find on map >>   Show street view

Structure Number: 7467,  Location: 0.1 MI W LAWRENCE STREET (Lat: 30.699117,  Lng: -88.053833),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 820 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,221 (year 2042),  Design Load: H 15,  Features Intersected: ONE MILE CREEK,  Facility Carried by Structure: EARLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $553,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $608,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7492,  Location: 1.8 MI S I-10 (Lat: 30.553100,  Lng: -88.099800),  Route carried "on" structure: State highway 163,  Year Built: 1961,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 24,544 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 36,816 (year 2039),  Design Load: HS 20,  Features Intersected: ROBINSON BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.950,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $939,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,033,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 786,  Location: 0.5 MI N I-10 (Lat: 30.641217,  Lng: -88.119314),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 9,662 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,493 (year 2038),  Design Load: HS 20,  Features Intersected: I-65,  Facility Carried by Structure: HALLS MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.55m (34.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,387,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7892,  Location: 0.5 MI N OLD SHELL ROAD (Lat: 30.710697,  Lng: -88.249392),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 690 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,025 (year 2040),  Design Load: H 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: GLENN ACRES DR E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.6m (8.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $364,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8139,  Location: 3.3 MI E US 90 (Lat: 30.616694,  Lng: -88.137033),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 994 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,491 (year 2040),  Design Load: HS 20,  Features Intersected: I-10,  Facility Carried by Structure: RIVERE DU CHIEN RD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $1,870,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 814,  Location: 0.1 MI W NAVCO INTERCH (Lat: 30.627019,  Lng: -88.121033),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 38,765 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 58,148 (year 2040),  Design Load: HS 20,  Features Intersected: BAYOU MCCULLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.349,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,710,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $1,881,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8141,  Location: 0.1 MI W NAVCO INTERCH (Lat: 30.625719,  Lng: -88.120608),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 38,765 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 58,148 (year 2040),  Design Load: HS 20,  Features Intersected: BAYOU MCCULLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.349,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $873,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $960,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8142,  Location: I-10 @ MICHIGAN AVE (Lat: 30.650000,  Lng: -88.076667),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 7,727 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,591 (year 2038),  Design Load: HS 20,  Features Intersected: I-10,  Facility Carried by Structure: MICHIGAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,350,000,  Roadway Improvement Cost: $635,000,  Total Project Cost: $6,985,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8143,  Location: 1.3 MI E JCT SR 163 (Lat: 30.651039,  Lng: -88.072136),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 70,819 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 103,228 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.615,  Lanes on structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 51.5m (169.0ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,049,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $2,254,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8144,  Location: 3 MI E JCT SR 163 (Lat: 30.666811,  Lng: -88.050314),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 77,593 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 116,389 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.522,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 51.5m (169.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,388,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $4,827,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8308,  Location: 0.5 MI S BEAR FORK ROAD (Lat: 30.741172,  Lng: -88.161142),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 6,536 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,739 (year 2041),  Design Load: H 15,  Features Intersected: EIGHTMILE CREEK,  Facility Carried by Structure: N UNIVERSITY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,807,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8371,  Location: 0.3 MI N AIRPORT BLVD. (Lat: 30.679333,  Lng: -88.148483),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 19,384 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,882 (year 2041),  Design Load: H 15,  Features Intersected: ESLAVA CREEK,  Facility Carried by Structure: MCGREGOR AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84,  Location: 1033' E I65 (Lat: 30.688869,  Lng: -88.123158),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 35,637 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 53,099 (year 2042),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: DAUPHIN STREET
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 1.419,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 51.3m (168.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,155,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8714,  Location: MOBILE - BALD CO LINE (Lat: 30.685039,  Lng: -88.010683),  Route carried "on" structure: US 90,  Year Built: 1965,  Status: Open,  Structure Length: 44.26m (145.21ft),  Average Daily Traffic: 12,697 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,045 (year 2040),  Design Load: HS 20,  Features Intersected: TENSAW/SPANISH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Navigation Control: Yes ( Vertical Clearance: 7.6m (24.9ft), Horizontal Clearance: 43.3m (142.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 8,  Length of Maximum Span: 61.6m (202.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 44.26m (145.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: April 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $10,014,000,  Roadway Improvement Cost: $1,001,000,  Total Project Cost: $11,015,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 889,  Location: 0.3 MI S I-10 (Lat: 30.636733,  Lng: -88.089083),  Route carried "on" structure: State highway 163,  Year Built: 1965,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 24,579 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 36,869 (year 2040),  Design Load: HS 20,  Features Intersected: SALTWATER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.639,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 28.8m (94.5ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $4,220,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $4,642,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8957,  Location: I-10 @ SR 163 INTERCHANGE (Lat: 30.638458,  Lng: -88.091850),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1966,  Status: Open,  Structure Length: 14.11m (46.29ft),  Average Daily Traffic: 7,121 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,682 (year 2038),  Design Load: HS 20,  Features Intersected: CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.443,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.91m (48.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,760,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $3,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Epoxy,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 8958,  Location: I-10 @ SR 163 INTERCHANGE (Lat: 30.638381,  Lng: -88.090803),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1966,  Status: Open,  Structure Length: 19.08m (62.60ft),  Average Daily Traffic: 3,213 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,819 (year 2038),  Design Load: HS 20,  Features Intersected: I-10 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.414,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.69m (64.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,645,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $4,010,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 8959,  Location: I-10 @ SR 163 INTERCHANGE (Lat: 30.640767,  Lng: -88.089372),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1966,  Status: Open,  Structure Length: 14.81m (48.59ft),  Average Daily Traffic: 2,676 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,014 (year 2038),  Design Load: HS 20,  Features Intersected: I-10 * SR 163
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 35.718,  Lanes on structure: 1,  Lanes under structure: 16,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.59m (51.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,887,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $3,176,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 8961,  Location: 3.3 MI E JCT SR 163 (Lat: 30.670267,  Lng: -88.046161),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 70,156 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 105,234 (year 2040),  Design Load: H 20,  Features Intersected: SOUTHERN DRAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.021,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.3m (142.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $7,411,000,  Roadway Improvement Cost: $741,000,  Total Project Cost: $8,152,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8997,  Location: I-10 @ I-65 INTERCHANGE (Lat: 30.627972,  Lng: -88.118000),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 27,386 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 41,079 (year 2038),  Design Load: HS 20,  Features Intersected: I-10 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.359,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,288,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $2,517,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8998,  Location: I-10 @ I-65 INTERCHANGE (Lat: 30.628556,  Lng: -88.114972),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 14.66m (48.10ft),  Average Daily Traffic: 27,386 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 41,079 (year 2038),  Design Load: HS 20,  Features Intersected: I-10 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.211,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 15.44m (50.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,494,000,  Roadway Improvement Cost: $349,000,  Total Project Cost: $3,843,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8999,  Location: I-10 @ I-65 (Lat: 30.629850,  Lng: -88.117519),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 11.61m (38.09ft),  Average Daily Traffic: 23,260 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 34,890 (year 2038),  Design Load: HS 20,  Features Intersected: I-65 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.528,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.48m (40.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,824,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $3,106,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9408,  Location: JCT. AIRP'T BLVD @ WENDYS (Lat: 30.675758,  Lng: -88.118867),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5,062 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,542 (year 2042),  Design Load: H 15,  Features Intersected: ESLAVA CREEK,  Facility Carried by Structure: SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.099,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $745,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $820,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9502,  Location: 0.4 MI N US 98 (Lat: 30.711572,  Lng: -88.121344),  Route carried "on" structure: Interstate 65,  Year Built: 1962,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 86,547 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 129,821 (year 2038),  Design Load: HS 20,  Features Intersected: THREE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.735,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $9,332,000,  Roadway Improvement Cost: $933,000,  Total Project Cost: $10,265,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9572,  Location: 0.4 MI N OLD SHELL ROAD (Lat: 30.710717,  Lng: -88.246969),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 107 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 159 (year 2040),  Design Load: H 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: CAROL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.3m (20.7ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.6m (8.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $372,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $409,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9575,  Location: 0.4 MI S HALLS MILL RD (Lat: 30.606156,  Lng: -88.157014),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 554 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 825 (year 2041),  Design Load: H 15,  Features Intersected: HALLS MILL CREEK,  Facility Carried by Structure: DEMETROPOLIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9708,  Location: 6.1 MI N OF CO RD 11 (Lat: 30.638631,  Lng: -88.275772),  Route carried "on" structure: County highway 36,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,142 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,155 (year 2040),  Design Load: H 20,  Features Intersected: HAMILTON CREEK,  Facility Carried by Structure: JEFF HAMILTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.099,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 974,  Location: 100' S PEMBROCKE AVE. (Lat: 30.679294,  Lng: -88.143269),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 1,590 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,369 (year 2041),  Design Load: H 15,  Features Intersected: ESLAVA CREEK,  Facility Carried by Structure: BERWYN WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $530,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10005,  Location: 0.5 MI W I-65 (Lat: 30.649794,  Lng: -88.125831),  Route carried "on" structure: ServiceUS 90,  Year Built: 1969,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 2,634 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,951 (year 2038),  Design Load: HS 20,  Features Intersected: WRAGG SWAMP CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.880,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $1,642,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,806,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10392,  Location: OLD SHELL RD * UNIV BLVD (Lat: 30.688753,  Lng: -88.173664),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 2.00m (6.56ft),  Average Daily Traffic: 22,652 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 33,752 (year 2041),  Design Load: H 15,  Features Intersected: TWELVE-MILE CREEK,  Facility Carried by Structure: OLD SHELL ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 2.099,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.3m (79.7ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.6m (18.4ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.75m (9.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $8,180,000,  Roadway Improvement Cost: $818,000,  Total Project Cost: $8,998,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10547,  Location: 0.4 MI S OLD SHELL RD (Lat: 30.684431,  Lng: -88.180019),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 1,947 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,901 (year 2041),  Design Load: H 15,  Features Intersected: TWELVEMILE CREEK,  Facility Carried by Structure: EAST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $568,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $625,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10575,  Location: 200' N YORKSHIRE LANE (Lat: 30.664594,  Lng: -88.156089),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,991 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,966 (year 2041),  Design Load: H 15,  Features Intersected: BOLTON BRANCH,  Facility Carried by Structure: THORNTON PLACE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $449,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10665,  Location: WEST TUNNEL INTERCHANGE (Lat: 30.685589,  Lng: -88.040456),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 35.94m (117.91ft),  Average Daily Traffic: 4,881 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,322 (year 2038),  Design Load: HS 20,  Features Intersected: I10-EB/WB/RAMP TO WB I10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.825,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 35.94m (117.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,900,000,  Roadway Improvement Cost: $690,000,  Total Project Cost: $7,590,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10791,  Location: 0.2 MI E CODY RD (Lat: 30.708686,  Lng: -88.199253),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 14,557 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 21,691 (year 2041),  Design Load: H 15,  Features Intersected: THREEMILE CREEK,  Facility Carried by Structure: ZIEGLER BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 7,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,385,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,524,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10852,  Location: EAST TUNNEL INTERCHANGE (Lat: 30.691789,  Lng: -88.028403),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1973,  Status: Open,  Structure Length: 19.78m (64.90ft),  Average Daily Traffic: 5,268 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,902 (year 2039),  Design Load: HS 20,  Features Intersected: US 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.431,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.33m (66.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,484,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $3,832,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10853,  Location: EAST TUNNEL INTERCHANGE (Lat: 30.691533,  Lng: -88.027283),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1973,  Status: Open,  Structure Length: 29.02m (95.21ft),  Average Daily Traffic: 5,044 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,560 (year 2039),  Design Load: HS 20,  Features Intersected: US 90 EB * WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.460,  Lanes on structure: 1,  Lanes under structure: 14,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.02m (95.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,571,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $6,128,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10854,  Location: EAST TUNNEL INTERCHANGE (Lat: 30.692289,  Lng: -88.027281),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1973,  Status: Open,  Structure Length: 35.23m (115.58ft),  Average Daily Traffic: 8,250 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,375 (year 2039),  Design Load: HS 20,  Features Intersected: I-10EB * WB * WB ON RAMP
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 44.531,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Number Of Approach Spans: 17,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 35.23m (115.58ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $6,040,000,  Roadway Improvement Cost: $604,000,  Total Project Cost: $6,644,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10855,  Location: EAST TUNNEL INTERCHANGE (Lat: 30.693181,  Lng: -88.027322),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1973,  Status: Open,  Structure Length: 38.40m (125.98ft),  Average Daily Traffic: 8,648 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 12,972 (year 2039),  Design Load: HS 20,  Features Intersected: US 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.547,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Number Of Approach Spans: 12,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 38.40m (125.98ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $7,374,000,  Roadway Improvement Cost: $737,000,  Total Project Cost: $8,111,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10962,  Location: 200' W BROOKLINE DR (Lat: 30.625269,  Lng: -88.161872),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,618 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,391 (year 2041),  Design Load: H 15,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: MAUDELAYNE DR.N.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $501,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10969,  Location: 0.9 MI S AIRPORT BLVD (Lat: 30.664364,  Lng: -88.152092),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 13,310 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,832 (year 2041),  Design Load: H 15,  Features Intersected: BOLTON BRANCH,  Facility Carried by Structure: AZALEA RD/SERV RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.100,  Lanes on structure: 7,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 71.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,559,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,715,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10997,  Location: 1000' S. FOREST HILL DR. (Lat: 30.706308,  Lng: -88.151364),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 20,674 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,805 (year 2041),  Design Load: H 15,  Features Intersected: THREEMILE CREEK,  Facility Carried by Structure: ZIEGLER BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.499,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.75m (12.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,840,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,024,000 ( Estimate for 2022)
Discuss Mobile, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.