Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Louisville, Kentucky (KY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 581Number of bridges
  • 8,465ft / 2,580mTotal length
  • $406,474,000Total costs
  • 25,145,399Total average daily traffic
  • 2,218,311Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Louisville
  • No street view available for this location

New bridges in Louisville, KY - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 91910-1919
  • 141920-1929
  • 211930-1939
  • 171940-1949
  • 441950-1959
  • 921960-1969
  • 611970-1979
  • 1061980-1989
  • 481990-1999
  • 382000-2009
  • 1282010-2019
  • 12020-2022
Reconstructed bridges in Louisville, KY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 131970-1979
  • 141980-1989
  • 31990-1999
  • 02000-2009
  • 52010-2019
Average Bridge Truck Traffic in Louisville, KY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 38.5%Good
  • 32.4%Satisfactory
  • 26.8%Fair
  • 2.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.2%Very good
  • 28.4%Good
  • 34.5%Satisfactory
  • 21.0%Fair
  • 3.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.0%Very good
  • 22.7%Good
  • 39.7%Satisfactory
  • 28.4%Fair
  • 2.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.5%Excellent
  • 15.2%Very good
  • 33.3%Good
  • 22.7%Satisfactory
  • 24.2%Fair
  • 3.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 6.7%Very good
  • 60.0%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 56B00278N,  Location: 1.0 MI E OF IN STATE LINE (Lat: 38.276111,  Lng: -85.809167),  Route carried "under" structure: Interstate 64,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 65,180 (year 2017),  Truck Traffic: 9%,  Features Intersected: I-64 EB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 1.656,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.1m (82.3ft)

Find on map >>   Show street view

Structure Number: 56B00281N,  Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270278,  Lng: -85.782778),  Route carried "under" structure: Alternate City street 1003,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 23,906 (year 2006),  Features Intersected: NORTHWESTERN PKWY,  Facility Carried by Structure: I-64 EB OFF RAMP
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 1.201,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.8m (97.8ft)

Find on map >>   Show street view

Structure Number: 56B00282N,  Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270000,  Lng: -85.782222),  Route carried "under" structure: Alternate City street 1003,  Year Built: 1971,  Structure Length: 0. m,  Features Intersected: 22ND ST & NORTHWESTERN,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 1.162,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.9m (124.3ft)

Find on map >>   Show street view

Structure Number: 56B00282N,  Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270000,  Lng: -85.782222),  Route carried "under" structure: US 150,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,285 (year 2017),  Truck Traffic: 7%,  Features Intersected: 22ND ST & NORTHWESTERN,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.064,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.9m (124.3ft)

Find on map >>   Show street view

Structure Number: 56B00283N,  Location: 0.9 MI E OF I-264 NTRCH (Lat: 38.275278,  Lng: -85.790833),  Route carried "under" structure: Alternate City street 1019,  Year Built: 1970,  Structure Length: 0. m,  Features Intersected: NS RR, 27TH ST & LANNAN,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 8.56m (28.08ft),  Kilometerpoint: 0.933,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 56B00283N,  Location: 0.9 MI E OF I-264 NTRCH (Lat: 38.275278,  Lng: -85.790833),  Route carried "under" structure: Alternate City street 1082,  Year Built: 1970,  Structure Length: 0. m,  Features Intersected: NS RR, 27TH ST & LANNAN,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 0.032,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 56B00285N,  Location: 0.75 MI E OF US 150 NTRCH (Lat: 38.263056,  Lng: -85.772500),  Route carried "under" structure: Alternate City street 1003,  Year Built: 1972,  Structure Length: 0. m,  Features Intersected: L&I RR & NORTHWESTERN,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.278,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 56B00292N,  Location: 0.85 MI W OF I-65 NTRCH (Lat: 38.258889,  Lng: -85.756944),  Route carried "under" structure: Alternate City street 1124,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 4,431 (year 2006),  Features Intersected: KY 3077 & BELVEDERE,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.233,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: 56B00292N,  Location: 0.85 MI W OF I-65 NTRCH (Lat: 38.258889,  Lng: -85.756944),  Route carried "under" structure: State highway 3077,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 9,727 (year 2017),  Truck Traffic: 6%,  Features Intersected: KY 3077 & BELVEDERE,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.389,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: 56B00298N,  Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778,  Lng: -85.765556),  Route carried "under" structure: Interstate 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 78,387 (year 2020),  Truck Traffic: 9%,  Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 6.556,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 56B00298N,  Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778,  Lng: -85.765556),  Route carried "under" structure: Ramp Interstate 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 55,582 (year 2020),  Truck Traffic: 11%,  Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 7.75m (25.43ft),  Kilometerpoint: 6.473,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 56B00298N,  Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778,  Lng: -85.765556),  Route carried "under" structure: Ramp Interstate 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 55,582 (year 2020),  Truck Traffic: 11%,  Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 6.494,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 56B00298N,  Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778,  Lng: -85.765556),  Route carried "under" structure: US 31,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 14%,  Features Intersected: US 31W, I-64 & RAMPS,  Facility Carried by Structure: I-64 WB OFF RAMP 4
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 34.318,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 56B00300N,  Location: 0.20 MI N OF US 31W (Lat: 38.258889,  Lng: -85.765556),  Route carried "under" structure: Interstate 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 55,582 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-64, RAMP 4 & US 31W WB
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 6.490,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 56B00300N,  Location: 0.20 MI N OF US 31W (Lat: 38.258889,  Lng: -85.765556),  Route carried "under" structure: US 31,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-64, RAMP 4 & US 31W WB,  Facility Carried by Structure: I-64 WB ON RAMP 1
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 34.335,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 56B00302N,  Location: 1.2 MI E OF US 150 NTRCH (Lat: 38.258056,  Lng: -85.765556),  Route carried "under" structure: US 31,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 14%,  Features Intersected: US 31W WB & I-64 RAMP 4,  Facility Carried by Structure: I-64 WB OFF RAMP 3
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 34.321,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00303N,  Location: AT 19TH ST AND PRTLND AVE (Lat: 38.266389,  Lng: -85.779167),  Route carried "under" structure: Interstate 64,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 55,582 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-64,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 4.942,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00304N,  Location: AT NWEST PKWY AND 23RD ST (Lat: 38.272778,  Lng: -85.784722),  Route carried "under" structure: Interstate 64,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 65,180 (year 2017),  Truck Traffic: 9%,  Features Intersected: I-64,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 4.010,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 56B00341N,  Location: 0.20 MI N OF DURRETT LN (Lat: 38.189167,  Lng: -85.726111),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 145,201 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-264 EB ON RAMPS,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 210.200,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00341N,  Location: 0.20 MI N OF DURRETT LN (Lat: 38.189167,  Lng: -85.726111),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 145,201 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-264 EB ON RAMPS,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 210.224,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00342N,  Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833,  Lng: -85.726944),  Route carried "under" structure: Interstate 264,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS TO I-65,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 19.681,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00342N,  Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833,  Lng: -85.726944),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS TO I-65,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 210.431,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00342N,  Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833,  Lng: -85.726944),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS TO I-65,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 210.454,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00342N,  Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833,  Lng: -85.726944),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS TO I-65,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 210.504,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00342N,  Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833,  Lng: -85.726944),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS TO I-65,  Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 210.362,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00344N,  Location: 50 FT S OF VIRGINIA AVE (Lat: 38.239444,  Lng: -85.815278),  Route carried "under" structure: Ramp City street 1042,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,450 (year 2014),  Features Intersected: VIRGINIA AVE CONN,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.667,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 56B00345N,  Location: AT HALE AND 38TH ST (Lat: 38.240833,  Lng: -85.816389),  Route carried "under" structure: City street 1012,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 8,891 (year 2017),  Features Intersected: HALE ST & I-264 OFF RAMP,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 3.203,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.9m (65.3ft)

Find on map >>   Show street view

Structure Number: 56B00389N,  Location: 1.0 MI S OF I-264 NTRCH (Lat: 38.178611,  Lng: -85.719722),  Route carried "under" structure: County highway 1001,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 13,352 (year 2020),  Features Intersected: GRADE LN,  Facility Carried by Structure: I-65
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.183,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 56B00390N,  Location: 0.6 MI S OF I-264 NTRCH (Lat: 38.181944,  Lng: -85.721944),  Route carried "under" structure: City street 1491,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 15,575 (year 2006),  Features Intersected: STANDIFORD LN,  Facility Carried by Structure: I-65
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.093,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.9m (68.6ft)

Find on map >>   Show street view

Structure Number: 56B00391N,  Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278,  Lng: -85.729444),  Route carried "under" structure: Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: I-65 & RAMP
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 19.475,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 56B00391N,  Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278,  Lng: -85.729444),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 210.362,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 56B00391N,  Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278,  Lng: -85.729444),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 210.431,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 56B00391N,  Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278,  Lng: -85.729444),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 210.454,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 56B00392N,  Location: 2.3 MI N OF KY 1747 NTRCH (Lat: 38.188611,  Lng: -85.727778),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 145,201 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-264 EB ON RAMP
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 210.164,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.3m (86.3ft)

Find on map >>   Show street view

Structure Number: 56B00393N,  Location: 2.6 MI N OF KY 1747 NTRCH (Lat: 38.192222,  Lng: -85.730833),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 RAMP 8
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 210.641,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: 56B00394N,  Location: AT I-264, I-264E TO I-65N (Lat: 38.190556,  Lng: -85.728056),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 210.454,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00394N,  Location: AT I-264, I-264E TO I-65N (Lat: 38.190556,  Lng: -85.728056),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 210.431,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00394N,  Location: AT I-264, I-264E TO I-65N (Lat: 38.190556,  Lng: -85.728056),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 210.369,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00394N,  Location: AT I-264, I-264E TO I-65N (Lat: 38.190556,  Lng: -85.728056),  Route carried "under" structure: Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: I-65 NB RAMP
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 19.568,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00394N,  Location: AT I-264, I-264E TO I-65N (Lat: 38.190556,  Lng: -85.728056),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 145,201 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 210.349,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 56B00395N,  Location: AT I-264, I-65N TO I-264W (Lat: 38.190556,  Lng: -85.728333),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 210.365,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 56B00395N,  Location: AT I-264, I-65N TO I-264W (Lat: 38.190556,  Lng: -85.728333),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 210.370,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 56B00395N,  Location: AT I-264, I-65N TO I-264W (Lat: 38.190556,  Lng: -85.728333),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 210.431,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 56B00395N,  Location: AT I-264, I-65N TO I-264W (Lat: 38.190556,  Lng: -85.728333),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 210.454,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 56B00395N,  Location: AT I-264, I-65N TO I-264W (Lat: 38.190556,  Lng: -85.728333),  Route carried "under" structure: Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: I-65 NB OFF RAMP
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 19.550,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 56B00396N,  Location: 2.6 MI N OF KY 1747 NTRCH (Lat: 38.192222,  Lng: -85.730278),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 NB OFF RAMP
Minimum Vertical Clearance: 8.61m (28.25ft),  Kilometerpoint: 210.626,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.9m (91.5ft)

Find on map >>   Show street view

Structure Number: 56B00397N,  Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333,  Lng: -85.731944),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 210.803,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 56B00397N,  Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333,  Lng: -85.731944),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 210.806,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 56B00397N,  Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333,  Lng: -85.731944),  Route carried "under" structure: Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 210.785,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 56B00398N,  Location: AT I-264, I-65S TO I-265W (Lat: 38.191667,  Lng: -85.732222),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 NB OFF RAMP
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 210.591,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 56B00399N,  Location: 1.7 MI N OF CRTDN NTRCH (Lat: 38.190833,  Lng: -85.733056),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 WB C-D & OFF RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 210.465,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.4m (135.8ft)

Find on map >>   Show street view

Structure Number: 56B00399N,  Location: 1.7 MI N OF CRTDN NTRCH (Lat: 38.190833,  Lng: -85.733056),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 WB C-D & OFF RAMPS
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 210.454,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.4m (135.8ft)

Find on map >>   Show street view

Structure Number: 56B00400N,  Location: AT I-264, I-65N TO I-264W (Lat: 38.191111,  Lng: -85.734444),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 WB OFF RAMPS
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 210.512,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 56B00401N,  Location: AT I-264, I-65 TO AIRPORT (Lat: 38.191111,  Lng: -85.734722),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 WB OFF RAMPS
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 210.534,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.4m (99.7ft)

Find on map >>   Show street view

Structure Number: 56B00402N,  Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.191389,  Lng: -85.738333),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-65 RAMP TO AIRPORT,  Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 210.600,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.2m (72.8ft)

Find on map >>   Show street view

Structure Number: 56B00403N,  Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.738333),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 145,201 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 210.291,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.1m (105.3ft)

Find on map >>   Show street view

Structure Number: 56B00403N,  Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.738333),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 145,201 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 210.298,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.1m (105.3ft)

Find on map >>   Show street view

Structure Number: 56B00403N,  Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.738333),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 210.393,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.1m (105.3ft)

Find on map >>   Show street view

Structure Number: 56B00403N,  Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.738333),  Route carried "under" structure: Interstate 264,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 18.681,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.1m (105.3ft)

Find on map >>   Show street view

Structure Number: 56B00404N,  Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.740556),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 210.361,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 56B00404N,  Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.740556),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 210.436,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 56B00404N,  Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722,  Lng: -85.740556),  Route carried "under" structure: Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 125,567 (year 2020),  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 18.461,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 56B00405N,  Location: 0.15 MI E OF CRITTENDEN (Lat: 38.189167,  Lng: -85.748333),  Route carried "under" structure: Ramp Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 125,567 (year 2020),  Features Intersected: I-264 EB ON RAMP
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 17.798,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.2m (92.5ft)

Find on map >>   Show street view

Structure Number: 56B00406N,  Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.189722,  Lng: -85.750833),  Route carried "under" structure: State highway 1631,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 12,791 (year 2020),  Truck Traffic: 15%,  Features Intersected: KY 1631 (CRITTENDEN DR),  Facility Carried by Structure: I-264 EB OFF RAMP
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.201,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.5m (113.2ft)

Find on map >>   Show street view

Structure Number: 56B00407R,  Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190000,  Lng: -85.750833),  Route carried "under" structure: State highway 1631,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 12,791 (year 2020),  Truck Traffic: 15%,  Features Intersected: KY 1631 (CRITTENDEN DR),  Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.224,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00408L,  Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190278,  Lng: -85.750833),  Route carried "under" structure: State highway 1631,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 12,791 (year 2020),  Truck Traffic: 15%,  Features Intersected: KY 1631 (CRITTENDEN DR),  Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.246,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00409N,  Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190278,  Lng: -85.750833),  Route carried "under" structure: State highway 1631,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 12,791 (year 2020),  Truck Traffic: 15%,  Features Intersected: KY 1631 (CRITTENDEN DR),  Facility Carried by Structure: I-264 WB ON RAMP
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.274,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 56B00410N,  Location: 0.8 MI E OF US 31W (Lat: 38.186389,  Lng: -85.798611),  Route carried "under" structure: Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 81,002 (year 2020),  Features Intersected: I-264 & MILL CREEK,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 13.311,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 56B00411N,  Location: 1.65 MI E OF US 31W (Lat: 38.188889,  Lng: -85.783333),  Route carried "under" structure: State highway 1865,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 23,353 (year 2020),  Truck Traffic: 10%,  Features Intersected: KY 1865 (TAYLOR BLVD),  Facility Carried by Structure: I-264
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 9.149,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 56B00412N,  Location: 2.1 MI E OF US 31W (Lat: 38.189444,  Lng: -85.775556),  Route carried "under" structure: Interstate 264,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 96,594 (year 2020),  Features Intersected: I-264 & EXPRESSWAY AVE,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 15.408,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 56B00413N,  Location: 0.8 MI S OF US 60A (Lat: 38.186111,  Lng: -85.801111),  Route carried "under" structure: Interstate 264,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 81,002 (year 2020),  Features Intersected: I-264,  Facility Carried by Structure: KY 1931
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 13.095,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 56B00414N,  Location: 0.95 MI E OF KY 1865 (Lat: 38.190000,  Lng: -85.766667),  Route carried "under" structure: State highway 1020,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 8,396 (year 2020),  Truck Traffic: 7%,  Features Intersected: KY 1020 (SOUTHERN PKWY),  Facility Carried by Structure: I-264
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 13.518,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.6m (87.3ft)

Find on map >>   Show street view

Structure Number: 56B00415N,  Location: 1.0 MI E OF KY 1865 (Lat: 38.190000,  Lng: -85.764722),  Route carried "under" structure: City street 1013,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 17,022 (year 2020),  Features Intersected: KY 1020 (S 3RD ST),  Facility Carried by Structure: I-264
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.180,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 56B00420N,  Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278,  Lng: -85.730278),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 210.431,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00420N,  Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278,  Lng: -85.730278),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 210.454,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00420N,  Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278,  Lng: -85.730278),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 210.362,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00420N,  Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278,  Lng: -85.730278),  Route carried "under" structure: Interstate 264,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 19.380,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00421N,  Location: AT I-264 NTRCH (Lat: 38.190278,  Lng: -85.730556),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 210.362,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00421N,  Location: AT I-264 NTRCH (Lat: 38.190278,  Lng: -85.730556),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 210.454,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00421N,  Location: AT I-264 NTRCH (Lat: 38.190278,  Lng: -85.730556),  Route carried "under" structure: ServiceInterstate 65,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 100,741 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 210.431,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00421N,  Location: AT I-264 NTRCH (Lat: 38.190278,  Lng: -85.730556),  Route carried "under" structure: Interstate 264,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264 & RAMPS,  Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 19.364,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 56B00422N,  Location: 0.15 MI N OF KY 61 (Lat: 38.179167,  Lng: -85.719444),  Route carried "under" structure: County highway 1001,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 13,352 (year 2020),  Features Intersected: GRADE LN,  Facility Carried by Structure: I-65 NB ON RAMP
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.134,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 56B00423N,  Location: 0.2 MI E OF LUCAS AVE (Lat: 38.191667,  Lng: -85.715278),  Route carried "under" structure: City street 1490,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 649 (year 2006),  Features Intersected: CURTIS AVE & NS RR,  Facility Carried by Structure: DURRETT LN
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 0.098,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 56B00424L,  Location: 0.8 MI E OF I-65 (Lat: 38.191667,  Lng: -85.715000),  Route carried "under" structure: City street 1490,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 649 (year 2006),  Features Intersected: CURTIS AVE & NS RR,  Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.071,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 56B00426L,  Location: 1.5 MI W OF I-65 (Lat: 38.190278,  Lng: -85.755833),  Route carried "under" structure: City street 2577,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,558 (year 2006),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 0.225,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00426L,  Location: 1.5 MI W OF I-65 (Lat: 38.190278,  Lng: -85.755833),  Route carried "under" structure: City street 1040,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 12,630 (year 2020),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 7.57m (24.84ft),  Kilometerpoint: 0.908,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00426L,  Location: 1.5 MI W OF I-65 (Lat: 38.190278,  Lng: -85.755833),  Route carried "under" structure: City street 1130,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,558 (year 2006),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 0.974,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00427R,  Location: 1.5 MI W OF I-65 (Lat: 38.190000,  Lng: -85.755833),  Route carried "under" structure: City street 1130,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,558 (year 2006),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 7.57m (24.84ft),  Kilometerpoint: 0.946,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00427R,  Location: 1.5 MI W OF I-65 (Lat: 38.190000,  Lng: -85.755833),  Route carried "under" structure: City street 1040,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 12,630 (year 2020),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 0.933,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00427R,  Location: 1.5 MI W OF I-65 (Lat: 38.190000,  Lng: -85.755833),  Route carried "under" structure: City street 2577,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,558 (year 2006),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.249,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 56B00428N,  Location: 0.55 MI N OF WOODLAWN AVE (Lat: 38.189722,  Lng: -85.756667),  Route carried "under" structure: City street 1040,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 12,630 (year 2020),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.964,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 56B00428N,  Location: 0.55 MI N OF WOODLAWN AVE (Lat: 38.189722,  Lng: -85.756667),  Route carried "under" structure: City street 1130,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,758 (year 2006),  Features Intersected: CSX RR & CRITTENDEN DR,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 7.14m (23.43ft),  Kilometerpoint: 0.904,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 56B00429N,  Location: 0.2 MI N OF GARDINER LN (Lat: 38.195556,  Lng: -85.707500),  Route carried "under" structure: Interstate 264,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 155,395 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-264,  Facility Carried by Structure: KY 864
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 21.519,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Discuss Louisville, Kentucky (KY) on our hugely popular Kentucky forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.