Bridge Statistics for Louisville, Kentucky (KY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 581Number of bridges
- 8,465ft / 2,580mTotal length
- $406,474,000Total costs
- 25,145,399Total average daily traffic
- 2,218,311Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Louisville
- No street view available for this location
- New bridges - historical statistics
- 21900-1909
- 91910-1919
- 141920-1929
- 211930-1939
- 171940-1949
- 441950-1959
- 921960-1969
- 611970-1979
- 1061980-1989
- 481990-1999
- 382000-2009
- 1282010-2019
- 12020-2022
- Reconstructed bridges - Historical Statistics
- 11950-1959
- 01960-1969
- 131970-1979
- 141980-1989
- 31990-1999
- 02000-2009
- 52010-2019
- Bridge Condition - Deck
- 38.5%Good
- 32.4%Satisfactory
- 26.8%Fair
- 2.3%Poor
- Bridge Condition - Superstructure
- 12.2%Very good
- 28.4%Good
- 34.5%Satisfactory
- 21.0%Fair
- 3.9%Poor
- Bridge Condition - Substructure
- 7.0%Very good
- 22.7%Good
- 39.7%Satisfactory
- 28.4%Fair
- 2.2%Poor
- Bridge Condition - Channel
- 1.5%Excellent
- 15.2%Very good
- 33.3%Good
- 22.7%Satisfactory
- 24.2%Fair
- 3.0%Poor
- Bridge Condition - Culverts
- 6.7%Very good
- 60.0%Satisfactory
- 33.3%Fair
Find on map >> Show street view
Structure Number: 56B00278N, Location: 1.0 MI E OF IN STATE LINE (Lat: 38.276111, Lng: -85.809167), Route carried "under" structure: Interstate 64, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 65,180 (year 2017), Truck Traffic: 9%, Features Intersected: I-64 EB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 1.656, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.1m (82.3ft)
Structure Number: 56B00278N, Location: 1.0 MI E OF IN STATE LINE (Lat: 38.276111, Lng: -85.809167), Route carried "under" structure: Interstate 64, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 65,180 (year 2017), Truck Traffic: 9%, Features Intersected: I-64 EB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 1.656, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.1m (82.3ft)
Find on map >> Show street view
Structure Number: 56B00281N, Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270278, Lng: -85.782778), Route carried "under" structure: Alternate City street 1003, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 23,906 (year 2006), Features Intersected: NORTHWESTERN PKWY, Facility Carried by Structure: I-64 EB OFF RAMP
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 1.201, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.8m (97.8ft)
Structure Number: 56B00281N, Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270278, Lng: -85.782778), Route carried "under" structure: Alternate City street 1003, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 23,906 (year 2006), Features Intersected: NORTHWESTERN PKWY, Facility Carried by Structure: I-64 EB OFF RAMP
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 1.201, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.8m (97.8ft)
Find on map >> Show street view
Structure Number: 56B00282N, Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270000, Lng: -85.782222), Route carried "under" structure: Alternate City street 1003, Year Built: 1971, Structure Length: 0. m, Features Intersected: 22ND ST & NORTHWESTERN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 1.162, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.9m (124.3ft)
Structure Number: 56B00282N, Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270000, Lng: -85.782222), Route carried "under" structure: Alternate City street 1003, Year Built: 1971, Structure Length: 0. m, Features Intersected: 22ND ST & NORTHWESTERN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 1.162, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.9m (124.3ft)
Find on map >> Show street view
Structure Number: 56B00282N, Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270000, Lng: -85.782222), Route carried "under" structure: US 150, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,285 (year 2017), Truck Traffic: 7%, Features Intersected: 22ND ST & NORTHWESTERN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.064, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.9m (124.3ft)
Structure Number: 56B00282N, Location: 1.45 MI E OF I-264 NTRCH (Lat: 38.270000, Lng: -85.782222), Route carried "under" structure: US 150, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,285 (year 2017), Truck Traffic: 7%, Features Intersected: 22ND ST & NORTHWESTERN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.064, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.9m (124.3ft)
Find on map >> Show street view
Structure Number: 56B00283N, Location: 0.9 MI E OF I-264 NTRCH (Lat: 38.275278, Lng: -85.790833), Route carried "under" structure: Alternate City street 1019, Year Built: 1970, Structure Length: 0. m, Features Intersected: NS RR, 27TH ST & LANNAN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 8.56m (28.08ft), Kilometerpoint: 0.933, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 56B00283N, Location: 0.9 MI E OF I-264 NTRCH (Lat: 38.275278, Lng: -85.790833), Route carried "under" structure: Alternate City street 1019, Year Built: 1970, Structure Length: 0. m, Features Intersected: NS RR, 27TH ST & LANNAN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 8.56m (28.08ft), Kilometerpoint: 0.933, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 56B00283N, Location: 0.9 MI E OF I-264 NTRCH (Lat: 38.275278, Lng: -85.790833), Route carried "under" structure: Alternate City street 1082, Year Built: 1970, Structure Length: 0. m, Features Intersected: NS RR, 27TH ST & LANNAN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 7.26m (23.82ft), Kilometerpoint: 0.032, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 56B00283N, Location: 0.9 MI E OF I-264 NTRCH (Lat: 38.275278, Lng: -85.790833), Route carried "under" structure: Alternate City street 1082, Year Built: 1970, Structure Length: 0. m, Features Intersected: NS RR, 27TH ST & LANNAN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 7.26m (23.82ft), Kilometerpoint: 0.032, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 56B00285N, Location: 0.75 MI E OF US 150 NTRCH (Lat: 38.263056, Lng: -85.772500), Route carried "under" structure: Alternate City street 1003, Year Built: 1972, Structure Length: 0. m, Features Intersected: L&I RR & NORTHWESTERN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.278, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 56B00285N, Location: 0.75 MI E OF US 150 NTRCH (Lat: 38.263056, Lng: -85.772500), Route carried "under" structure: Alternate City street 1003, Year Built: 1972, Structure Length: 0. m, Features Intersected: L&I RR & NORTHWESTERN, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.278, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 56B00292N, Location: 0.85 MI W OF I-65 NTRCH (Lat: 38.258889, Lng: -85.756944), Route carried "under" structure: Alternate City street 1124, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 4,431 (year 2006), Features Intersected: KY 3077 & BELVEDERE, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.233, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.0m (147.6ft)
Structure Number: 56B00292N, Location: 0.85 MI W OF I-65 NTRCH (Lat: 38.258889, Lng: -85.756944), Route carried "under" structure: Alternate City street 1124, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 4,431 (year 2006), Features Intersected: KY 3077 & BELVEDERE, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.233, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.0m (147.6ft)
Find on map >> Show street view
Structure Number: 56B00292N, Location: 0.85 MI W OF I-65 NTRCH (Lat: 38.258889, Lng: -85.756944), Route carried "under" structure: State highway 3077, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 9,727 (year 2017), Truck Traffic: 6%, Features Intersected: KY 3077 & BELVEDERE, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.389, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.0m (147.6ft)
Structure Number: 56B00292N, Location: 0.85 MI W OF I-65 NTRCH (Lat: 38.258889, Lng: -85.756944), Route carried "under" structure: State highway 3077, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 9,727 (year 2017), Truck Traffic: 6%, Features Intersected: KY 3077 & BELVEDERE, Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.389, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.0m (147.6ft)
Find on map >> Show street view
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 78,387 (year 2020), Truck Traffic: 9%, Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 7.34m (24.08ft), Kilometerpoint: 6.556, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 78,387 (year 2020), Truck Traffic: 9%, Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 7.34m (24.08ft), Kilometerpoint: 6.556, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: Ramp Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 7.75m (25.43ft), Kilometerpoint: 6.473, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: Ramp Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 7.75m (25.43ft), Kilometerpoint: 6.473, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: Ramp Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 6.04m (19.82ft), Kilometerpoint: 6.494, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: Ramp Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: US 31W, I-64 & RAMPS
Minimum Vertical Clearance: 6.04m (19.82ft), Kilometerpoint: 6.494, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: US 31, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2020), Truck Traffic: 14%, Features Intersected: US 31W, I-64 & RAMPS, Facility Carried by Structure: I-64 WB OFF RAMP 4
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 34.318, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 56B00298N, Location: 1.3 MI W OF I-65 NTRCH (Lat: 38.257778, Lng: -85.765556), Route carried "under" structure: US 31, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2020), Truck Traffic: 14%, Features Intersected: US 31W, I-64 & RAMPS, Facility Carried by Structure: I-64 WB OFF RAMP 4
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 34.318, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 56B00300N, Location: 0.20 MI N OF US 31W (Lat: 38.258889, Lng: -85.765556), Route carried "under" structure: Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: I-64, RAMP 4 & US 31W WB
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 6.490, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 56B00300N, Location: 0.20 MI N OF US 31W (Lat: 38.258889, Lng: -85.765556), Route carried "under" structure: Interstate 64, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: I-64, RAMP 4 & US 31W WB
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 6.490, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 56B00300N, Location: 0.20 MI N OF US 31W (Lat: 38.258889, Lng: -85.765556), Route carried "under" structure: US 31, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2020), Truck Traffic: 14%, Features Intersected: I-64, RAMP 4 & US 31W WB, Facility Carried by Structure: I-64 WB ON RAMP 1
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 34.335, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 56B00300N, Location: 0.20 MI N OF US 31W (Lat: 38.258889, Lng: -85.765556), Route carried "under" structure: US 31, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2020), Truck Traffic: 14%, Features Intersected: I-64, RAMP 4 & US 31W WB, Facility Carried by Structure: I-64 WB ON RAMP 1
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 34.335, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 56B00302N, Location: 1.2 MI E OF US 150 NTRCH (Lat: 38.258056, Lng: -85.765556), Route carried "under" structure: US 31, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2020), Truck Traffic: 14%, Features Intersected: US 31W WB & I-64 RAMP 4, Facility Carried by Structure: I-64 WB OFF RAMP 3
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 34.321, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00302N, Location: 1.2 MI E OF US 150 NTRCH (Lat: 38.258056, Lng: -85.765556), Route carried "under" structure: US 31, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2020), Truck Traffic: 14%, Features Intersected: US 31W WB & I-64 RAMP 4, Facility Carried by Structure: I-64 WB OFF RAMP 3
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 34.321, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00303N, Location: AT 19TH ST AND PRTLND AVE (Lat: 38.266389, Lng: -85.779167), Route carried "under" structure: Interstate 64, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: I-64, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 4.942, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00303N, Location: AT 19TH ST AND PRTLND AVE (Lat: 38.266389, Lng: -85.779167), Route carried "under" structure: Interstate 64, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 55,582 (year 2020), Truck Traffic: 11%, Features Intersected: I-64, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 4.942, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00304N, Location: AT NWEST PKWY AND 23RD ST (Lat: 38.272778, Lng: -85.784722), Route carried "under" structure: Interstate 64, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 65,180 (year 2017), Truck Traffic: 9%, Features Intersected: I-64, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 4.010, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.3m (83.0ft)
Structure Number: 56B00304N, Location: AT NWEST PKWY AND 23RD ST (Lat: 38.272778, Lng: -85.784722), Route carried "under" structure: Interstate 64, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 65,180 (year 2017), Truck Traffic: 9%, Features Intersected: I-64, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 4.010, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 25.3m (83.0ft)
Find on map >> Show street view
Structure Number: 56B00341N, Location: 0.20 MI N OF DURRETT LN (Lat: 38.189167, Lng: -85.726111), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 EB ON RAMPS, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 210.200, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00341N, Location: 0.20 MI N OF DURRETT LN (Lat: 38.189167, Lng: -85.726111), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 EB ON RAMPS, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 210.200, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00341N, Location: 0.20 MI N OF DURRETT LN (Lat: 38.189167, Lng: -85.726111), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 EB ON RAMPS, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 210.224, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00341N, Location: 0.20 MI N OF DURRETT LN (Lat: 38.189167, Lng: -85.726111), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 EB ON RAMPS, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 210.224, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: Interstate 264, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 19.681, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: Interstate 264, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 19.681, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: ServiceInterstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 210.431, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: ServiceInterstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 210.431, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 7.11m (23.33ft), Kilometerpoint: 210.454, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 7.11m (23.33ft), Kilometerpoint: 210.454, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 210.504, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 210.504, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: ServiceInterstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 210.362, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00342N, Location: 0.35 MI N OF DURRETT LN (Lat: 38.190833, Lng: -85.726944), Route carried "under" structure: ServiceInterstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS TO I-65, Facility Carried by Structure: KY 61
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 210.362, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00344N, Location: 50 FT S OF VIRGINIA AVE (Lat: 38.239444, Lng: -85.815278), Route carried "under" structure: Ramp City street 1042, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 3,450 (year 2014), Features Intersected: VIRGINIA AVE CONN, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 1.667, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 17.1m (56.1ft)
Structure Number: 56B00344N, Location: 50 FT S OF VIRGINIA AVE (Lat: 38.239444, Lng: -85.815278), Route carried "under" structure: Ramp City street 1042, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 3,450 (year 2014), Features Intersected: VIRGINIA AVE CONN, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 1.667, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 17.1m (56.1ft)
Find on map >> Show street view
Structure Number: 56B00345N, Location: AT HALE AND 38TH ST (Lat: 38.240833, Lng: -85.816389), Route carried "under" structure: City street 1012, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 8,891 (year 2017), Features Intersected: HALE ST & I-264 OFF RAMP, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 3.203, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 19.9m (65.3ft)
Structure Number: 56B00345N, Location: AT HALE AND 38TH ST (Lat: 38.240833, Lng: -85.816389), Route carried "under" structure: City street 1012, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 8,891 (year 2017), Features Intersected: HALE ST & I-264 OFF RAMP, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 3.203, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 19.9m (65.3ft)
Find on map >> Show street view
Structure Number: 56B00389N, Location: 1.0 MI S OF I-264 NTRCH (Lat: 38.178611, Lng: -85.719722), Route carried "under" structure: County highway 1001, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 13,352 (year 2020), Features Intersected: GRADE LN, Facility Carried by Structure: I-65
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.183, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 56B00389N, Location: 1.0 MI S OF I-264 NTRCH (Lat: 38.178611, Lng: -85.719722), Route carried "under" structure: County highway 1001, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 13,352 (year 2020), Features Intersected: GRADE LN, Facility Carried by Structure: I-65
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.183, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 56B00390N, Location: 0.6 MI S OF I-264 NTRCH (Lat: 38.181944, Lng: -85.721944), Route carried "under" structure: City street 1491, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 15,575 (year 2006), Features Intersected: STANDIFORD LN, Facility Carried by Structure: I-65
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.093, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.9m (68.6ft)
Structure Number: 56B00390N, Location: 0.6 MI S OF I-264 NTRCH (Lat: 38.181944, Lng: -85.721944), Route carried "under" structure: City street 1491, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 15,575 (year 2006), Features Intersected: STANDIFORD LN, Facility Carried by Structure: I-65
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.093, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.9m (68.6ft)
Find on map >> Show street view
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 & RAMP
Minimum Vertical Clearance: 6.22m (20.41ft), Kilometerpoint: 19.475, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 & RAMP
Minimum Vertical Clearance: 6.22m (20.41ft), Kilometerpoint: 19.475, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Find on map >> Show street view
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 6.04m (19.82ft), Kilometerpoint: 210.362, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 6.04m (19.82ft), Kilometerpoint: 210.362, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Find on map >> Show street view
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 210.431, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 210.431, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Find on map >> Show street view
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 210.454, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Structure Number: 56B00391N, Location: 2.5 MI N OF KY 1747 NTRCH (Lat: 38.190278, Lng: -85.729444), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 210.454, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Find on map >> Show street view
Structure Number: 56B00392N, Location: 2.3 MI N OF KY 1747 NTRCH (Lat: 38.188611, Lng: -85.727778), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 EB ON RAMP
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 210.164, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.3m (86.3ft)
Structure Number: 56B00392N, Location: 2.3 MI N OF KY 1747 NTRCH (Lat: 38.188611, Lng: -85.727778), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 EB ON RAMP
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 210.164, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.3m (86.3ft)
Find on map >> Show street view
Structure Number: 56B00393N, Location: 2.6 MI N OF KY 1747 NTRCH (Lat: 38.192222, Lng: -85.730833), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 RAMP 8
Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 210.641, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.5m (93.5ft)
Structure Number: 56B00393N, Location: 2.6 MI N OF KY 1747 NTRCH (Lat: 38.192222, Lng: -85.730833), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 RAMP 8
Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 210.641, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.5m (93.5ft)
Find on map >> Show street view
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 210.431, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 210.431, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 210.369, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 210.369, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 NB RAMP
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 19.568, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 NB RAMP
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 19.568, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 210.349, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 56B00394N, Location: AT I-264, I-264E TO I-65N (Lat: 38.190556, Lng: -85.728056), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 210.349, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 210.365, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 210.365, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Find on map >> Show street view
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 210.370, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 210.370, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Find on map >> Show street view
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 210.431, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 210.431, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Find on map >> Show street view
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 210.454, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 210.454, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Find on map >> Show street view
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 NB OFF RAMP
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 19.550, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Structure Number: 56B00395N, Location: AT I-264, I-65N TO I-264W (Lat: 38.190556, Lng: -85.728333), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 NB OFF RAMP
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 19.550, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.6m (90.6ft)
Find on map >> Show street view
Structure Number: 56B00396N, Location: 2.6 MI N OF KY 1747 NTRCH (Lat: 38.192222, Lng: -85.730278), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 NB OFF RAMP
Minimum Vertical Clearance: 8.61m (28.25ft), Kilometerpoint: 210.626, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.9m (91.5ft)
Structure Number: 56B00396N, Location: 2.6 MI N OF KY 1747 NTRCH (Lat: 38.192222, Lng: -85.730278), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 NB OFF RAMP
Minimum Vertical Clearance: 8.61m (28.25ft), Kilometerpoint: 210.626, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.9m (91.5ft)
Find on map >> Show street view
Structure Number: 56B00397N, Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333, Lng: -85.731944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 210.803, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 56B00397N, Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333, Lng: -85.731944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 210.803, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 56B00397N, Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333, Lng: -85.731944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 6.78m (22.24ft), Kilometerpoint: 210.806, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 56B00397N, Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333, Lng: -85.731944), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 6.78m (22.24ft), Kilometerpoint: 210.806, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 56B00397N, Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333, Lng: -85.731944), Route carried "under" structure: Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 210.785, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 56B00397N, Location: AT I-264, I-65 N TO FRGRD (Lat: 38.193333, Lng: -85.731944), Route carried "under" structure: Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 & SB RAMPS
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 210.785, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 56B00398N, Location: AT I-264, I-65S TO I-265W (Lat: 38.191667, Lng: -85.732222), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 NB OFF RAMP
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 210.591, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 56B00398N, Location: AT I-264, I-65S TO I-265W (Lat: 38.191667, Lng: -85.732222), Route carried "under" structure: Ramp Interstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 NB OFF RAMP
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 210.591, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 56B00399N, Location: 1.7 MI N OF CRTDN NTRCH (Lat: 38.190833, Lng: -85.733056), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB C-D & OFF RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 210.465, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.4m (135.8ft)
Structure Number: 56B00399N, Location: 1.7 MI N OF CRTDN NTRCH (Lat: 38.190833, Lng: -85.733056), Route carried "under" structure: Ramp Interstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB C-D & OFF RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 210.465, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.4m (135.8ft)
Find on map >> Show street view
Structure Number: 56B00399N, Location: 1.7 MI N OF CRTDN NTRCH (Lat: 38.190833, Lng: -85.733056), Route carried "under" structure: ServiceInterstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB C-D & OFF RAMPS
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.4m (135.8ft)
Structure Number: 56B00399N, Location: 1.7 MI N OF CRTDN NTRCH (Lat: 38.190833, Lng: -85.733056), Route carried "under" structure: ServiceInterstate 65, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB C-D & OFF RAMPS
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.4m (135.8ft)
Find on map >> Show street view
Structure Number: 56B00400N, Location: AT I-264, I-65N TO I-264W (Lat: 38.191111, Lng: -85.734444), Route carried "under" structure: Ramp Interstate 65, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB OFF RAMPS
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 210.512, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Structure Number: 56B00400N, Location: AT I-264, I-65N TO I-264W (Lat: 38.191111, Lng: -85.734444), Route carried "under" structure: Ramp Interstate 65, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB OFF RAMPS
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 210.512, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.5m (90.2ft)
Find on map >> Show street view
Structure Number: 56B00401N, Location: AT I-264, I-65 TO AIRPORT (Lat: 38.191111, Lng: -85.734722), Route carried "under" structure: Ramp Interstate 65, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB OFF RAMPS
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 210.534, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.4m (99.7ft)
Structure Number: 56B00401N, Location: AT I-264, I-65 TO AIRPORT (Lat: 38.191111, Lng: -85.734722), Route carried "under" structure: Ramp Interstate 65, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 WB OFF RAMPS
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 210.534, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.4m (99.7ft)
Find on map >> Show street view
Structure Number: 56B00402N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.191389, Lng: -85.738333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 RAMP TO AIRPORT, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.58m (18.31ft), Kilometerpoint: 210.600, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.2m (72.8ft)
Structure Number: 56B00402N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.191389, Lng: -85.738333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-65 RAMP TO AIRPORT, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.58m (18.31ft), Kilometerpoint: 210.600, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.2m (72.8ft)
Find on map >> Show street view
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 210.291, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: Ramp Interstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 210.291, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Find on map >> Show street view
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 210.298, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 145,201 (year 2020), Truck Traffic: 15%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 210.298, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Find on map >> Show street view
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 6.53m (21.42ft), Kilometerpoint: 210.393, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: ServiceInterstate 65, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 6.53m (21.42ft), Kilometerpoint: 210.393, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Find on map >> Show street view
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: Interstate 264, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 18.681, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Structure Number: 56B00403N, Location: 0.3 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.738333), Route carried "under" structure: Interstate 264, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY NB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 18.681, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.1m (105.3ft)
Find on map >> Show street view
Structure Number: 56B00404N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.740556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 210.361, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Structure Number: 56B00404N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.740556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 210.361, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Find on map >> Show street view
Structure Number: 56B00404N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.740556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 210.436, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Structure Number: 56B00404N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.740556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 210.436, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Find on map >> Show street view
Structure Number: 56B00404N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.740556), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 125,567 (year 2020), Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 6.02m (19.75ft), Kilometerpoint: 18.461, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Structure Number: 56B00404N, Location: 0.2 MI S OF PHILLIPS LANE (Lat: 38.189722, Lng: -85.740556), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 125,567 (year 2020), Features Intersected: I-264 & RAMPS, Facility Carried by Structure: FREEDOM WAY SB
Minimum Vertical Clearance: 6.02m (19.75ft), Kilometerpoint: 18.461, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Find on map >> Show street view
Structure Number: 56B00405N, Location: 0.15 MI E OF CRITTENDEN (Lat: 38.189167, Lng: -85.748333), Route carried "under" structure: Ramp Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 125,567 (year 2020), Features Intersected: I-264 EB ON RAMP
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 17.798, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.2m (92.5ft)
Structure Number: 56B00405N, Location: 0.15 MI E OF CRITTENDEN (Lat: 38.189167, Lng: -85.748333), Route carried "under" structure: Ramp Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 125,567 (year 2020), Features Intersected: I-264 EB ON RAMP
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 17.798, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.2m (92.5ft)
Find on map >> Show street view
Structure Number: 56B00406N, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.189722, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 EB OFF RAMP
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.201, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.5m (113.2ft)
Structure Number: 56B00406N, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.189722, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 EB OFF RAMP
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.201, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.5m (113.2ft)
Find on map >> Show street view
Structure Number: 56B00407R, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190000, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.224, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00407R, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190000, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.224, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00408L, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190278, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 0.246, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00408L, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190278, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 0.246, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00409N, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190278, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 WB ON RAMP
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.274, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 56B00409N, Location: 1.2 MI W OF I-65 NTRCH (Lat: 38.190278, Lng: -85.750833), Route carried "under" structure: State highway 1631, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,791 (year 2020), Truck Traffic: 15%, Features Intersected: KY 1631 (CRITTENDEN DR), Facility Carried by Structure: I-264 WB ON RAMP
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.274, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 56B00410N, Location: 0.8 MI E OF US 31W (Lat: 38.186389, Lng: -85.798611), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 81,002 (year 2020), Features Intersected: I-264 & MILL CREEK, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 13.311, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 24.1m (79.1ft)
Structure Number: 56B00410N, Location: 0.8 MI E OF US 31W (Lat: 38.186389, Lng: -85.798611), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 81,002 (year 2020), Features Intersected: I-264 & MILL CREEK, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 13.311, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 24.1m (79.1ft)
Find on map >> Show street view
Structure Number: 56B00411N, Location: 1.65 MI E OF US 31W (Lat: 38.188889, Lng: -85.783333), Route carried "under" structure: State highway 1865, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 23,353 (year 2020), Truck Traffic: 10%, Features Intersected: KY 1865 (TAYLOR BLVD), Facility Carried by Structure: I-264
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 9.149, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00411N, Location: 1.65 MI E OF US 31W (Lat: 38.188889, Lng: -85.783333), Route carried "under" structure: State highway 1865, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 23,353 (year 2020), Truck Traffic: 10%, Features Intersected: KY 1865 (TAYLOR BLVD), Facility Carried by Structure: I-264
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 9.149, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 56B00412N, Location: 2.1 MI E OF US 31W (Lat: 38.189444, Lng: -85.775556), Route carried "under" structure: Interstate 264, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 96,594 (year 2020), Features Intersected: I-264 & EXPRESSWAY AVE, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 15.408, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 56B00412N, Location: 2.1 MI E OF US 31W (Lat: 38.189444, Lng: -85.775556), Route carried "under" structure: Interstate 264, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 96,594 (year 2020), Features Intersected: I-264 & EXPRESSWAY AVE, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 15.408, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.3m (92.8ft)
Find on map >> Show street view
Structure Number: 56B00413N, Location: 0.8 MI S OF US 60A (Lat: 38.186111, Lng: -85.801111), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 81,002 (year 2020), Features Intersected: I-264, Facility Carried by Structure: KY 1931
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 13.095, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 25.3m (83.0ft)
Structure Number: 56B00413N, Location: 0.8 MI S OF US 60A (Lat: 38.186111, Lng: -85.801111), Route carried "under" structure: Interstate 264, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 81,002 (year 2020), Features Intersected: I-264, Facility Carried by Structure: KY 1931
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 13.095, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 25.3m (83.0ft)
Find on map >> Show street view
Structure Number: 56B00414N, Location: 0.95 MI E OF KY 1865 (Lat: 38.190000, Lng: -85.766667), Route carried "under" structure: State highway 1020, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 8,396 (year 2020), Truck Traffic: 7%, Features Intersected: KY 1020 (SOUTHERN PKWY), Facility Carried by Structure: I-264
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.518, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.6m (87.3ft)
Structure Number: 56B00414N, Location: 0.95 MI E OF KY 1865 (Lat: 38.190000, Lng: -85.766667), Route carried "under" structure: State highway 1020, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 8,396 (year 2020), Truck Traffic: 7%, Features Intersected: KY 1020 (SOUTHERN PKWY), Facility Carried by Structure: I-264
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.518, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.6m (87.3ft)
Find on map >> Show street view
Structure Number: 56B00415N, Location: 1.0 MI E OF KY 1865 (Lat: 38.190000, Lng: -85.764722), Route carried "under" structure: City street 1013, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 17,022 (year 2020), Features Intersected: KY 1020 (S 3RD ST), Facility Carried by Structure: I-264
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 1.180, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 56B00415N, Location: 1.0 MI E OF KY 1865 (Lat: 38.190000, Lng: -85.764722), Route carried "under" structure: City street 1013, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 17,022 (year 2020), Features Intersected: KY 1020 (S 3RD ST), Facility Carried by Structure: I-264
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 1.180, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 210.431, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 210.431, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: Ramp Interstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: Ramp Interstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 210.362, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 210.362, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: Interstate 264, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 19.380, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00420N, Location: 1.8 MI S OF CRTDN NTRCH (Lat: 38.190278, Lng: -85.730278), Route carried "under" structure: Interstate 264, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 19.380, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 210.362, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 210.362, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: Ramp Interstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: Ramp Interstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 210.454, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 210.431, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: ServiceInterstate 65, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 100,741 (year 2020), Truck Traffic: 11%, Features Intersected: I-264 & RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 210.431, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: Interstate 264, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 19.364, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 56B00421N, Location: AT I-264 NTRCH (Lat: 38.190278, Lng: -85.730556), Route carried "under" structure: Interstate 264, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264 & RAMPS, Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 19.364, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 56B00422N, Location: 0.15 MI N OF KY 61 (Lat: 38.179167, Lng: -85.719444), Route carried "under" structure: County highway 1001, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 13,352 (year 2020), Features Intersected: GRADE LN, Facility Carried by Structure: I-65 NB ON RAMP
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.134, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.2m (105.6ft)
Structure Number: 56B00422N, Location: 0.15 MI N OF KY 61 (Lat: 38.179167, Lng: -85.719444), Route carried "under" structure: County highway 1001, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 13,352 (year 2020), Features Intersected: GRADE LN, Facility Carried by Structure: I-65 NB ON RAMP
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.134, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.2m (105.6ft)
Find on map >> Show street view
Structure Number: 56B00423N, Location: 0.2 MI E OF LUCAS AVE (Lat: 38.191667, Lng: -85.715278), Route carried "under" structure: City street 1490, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 649 (year 2006), Features Intersected: CURTIS AVE & NS RR, Facility Carried by Structure: DURRETT LN
Minimum Vertical Clearance: 6.05m (19.85ft), Kilometerpoint: 0.098, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 56B00423N, Location: 0.2 MI E OF LUCAS AVE (Lat: 38.191667, Lng: -85.715278), Route carried "under" structure: City street 1490, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 649 (year 2006), Features Intersected: CURTIS AVE & NS RR, Facility Carried by Structure: DURRETT LN
Minimum Vertical Clearance: 6.05m (19.85ft), Kilometerpoint: 0.098, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 56B00424L, Location: 0.8 MI E OF I-65 (Lat: 38.191667, Lng: -85.715000), Route carried "under" structure: City street 1490, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 649 (year 2006), Features Intersected: CURTIS AVE & NS RR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 0.071, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.1m (85.6ft)
Structure Number: 56B00424L, Location: 0.8 MI E OF I-65 (Lat: 38.191667, Lng: -85.715000), Route carried "under" structure: City street 1490, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 649 (year 2006), Features Intersected: CURTIS AVE & NS RR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 5.92m (19.42ft), Kilometerpoint: 0.071, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.1m (85.6ft)
Find on map >> Show street view
Structure Number: 56B00426L, Location: 1.5 MI W OF I-65 (Lat: 38.190278, Lng: -85.755833), Route carried "under" structure: City street 2577, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 0.225, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00426L, Location: 1.5 MI W OF I-65 (Lat: 38.190278, Lng: -85.755833), Route carried "under" structure: City street 2577, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 0.225, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00426L, Location: 1.5 MI W OF I-65 (Lat: 38.190278, Lng: -85.755833), Route carried "under" structure: City street 1040, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,630 (year 2020), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 7.57m (24.84ft), Kilometerpoint: 0.908, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00426L, Location: 1.5 MI W OF I-65 (Lat: 38.190278, Lng: -85.755833), Route carried "under" structure: City street 1040, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,630 (year 2020), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 7.57m (24.84ft), Kilometerpoint: 0.908, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00426L, Location: 1.5 MI W OF I-65 (Lat: 38.190278, Lng: -85.755833), Route carried "under" structure: City street 1130, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 0.974, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00426L, Location: 1.5 MI W OF I-65 (Lat: 38.190278, Lng: -85.755833), Route carried "under" structure: City street 1130, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 WB
Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 0.974, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00427R, Location: 1.5 MI W OF I-65 (Lat: 38.190000, Lng: -85.755833), Route carried "under" structure: City street 1130, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 7.57m (24.84ft), Kilometerpoint: 0.946, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00427R, Location: 1.5 MI W OF I-65 (Lat: 38.190000, Lng: -85.755833), Route carried "under" structure: City street 1130, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 7.57m (24.84ft), Kilometerpoint: 0.946, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00427R, Location: 1.5 MI W OF I-65 (Lat: 38.190000, Lng: -85.755833), Route carried "under" structure: City street 1040, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,630 (year 2020), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 7.19m (23.59ft), Kilometerpoint: 0.933, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00427R, Location: 1.5 MI W OF I-65 (Lat: 38.190000, Lng: -85.755833), Route carried "under" structure: City street 1040, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,630 (year 2020), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 7.19m (23.59ft), Kilometerpoint: 0.933, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00427R, Location: 1.5 MI W OF I-65 (Lat: 38.190000, Lng: -85.755833), Route carried "under" structure: City street 2577, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 0.249, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 56B00427R, Location: 1.5 MI W OF I-65 (Lat: 38.190000, Lng: -85.755833), Route carried "under" structure: City street 2577, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,558 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: I-264 EB
Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 0.249, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 56B00428N, Location: 0.55 MI N OF WOODLAWN AVE (Lat: 38.189722, Lng: -85.756667), Route carried "under" structure: City street 1040, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,630 (year 2020), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.964, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 56B00428N, Location: 0.55 MI N OF WOODLAWN AVE (Lat: 38.189722, Lng: -85.756667), Route carried "under" structure: City street 1040, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,630 (year 2020), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.964, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 56B00428N, Location: 0.55 MI N OF WOODLAWN AVE (Lat: 38.189722, Lng: -85.756667), Route carried "under" structure: City street 1130, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,758 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 7.14m (23.43ft), Kilometerpoint: 0.904, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 56B00428N, Location: 0.55 MI N OF WOODLAWN AVE (Lat: 38.189722, Lng: -85.756667), Route carried "under" structure: City street 1130, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,758 (year 2006), Features Intersected: CSX RR & CRITTENDEN DR, Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 7.14m (23.43ft), Kilometerpoint: 0.904, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 56B00429N, Location: 0.2 MI N OF GARDINER LN (Lat: 38.195556, Lng: -85.707500), Route carried "under" structure: Interstate 264, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264, Facility Carried by Structure: KY 864
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 21.519, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 56B00429N, Location: 0.2 MI N OF GARDINER LN (Lat: 38.195556, Lng: -85.707500), Route carried "under" structure: Interstate 264, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 155,395 (year 2020), Truck Traffic: 9%, Features Intersected: I-264, Facility Carried by Structure: KY 864
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 21.519, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)