Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Toledo, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 309Number of bridges
  • 7,083ft / 2,159mTotal length
  • $659,445,000Total costs
  • 7,287,020Total average daily traffic
  • 979,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Toledo
  • No street view available for this location

New bridges in Toledo, OH - historical statistics
  • New bridges - historical statistics
  • 51910-1919
  • 21920-1929
  • 71930-1939
  • 31940-1949
  • 201950-1959
  • 571960-1969
  • 371970-1979
  • 141980-1989
  • 281990-1999
  • 562000-2009
  • 612010-2019
  • 192020-2022
Reconstructed bridges in Toledo, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 31980-1989
  • 111990-1999
  • 192000-2009
  • 192010-2019
  • 52020-2022
Average Bridge Daily Traffic in Toledo, OH
Average Bridge Truck Traffic in Toledo, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 32.0%Excellent
  • 32.6%Very good
  • 23.3%Good
  • 7.0%Satisfactory
  • 3.5%Fair
  • 1.2%Poor
  • 0.6%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.2%Excellent
  • 26.4%Very good
  • 31.6%Good
  • 10.9%Satisfactory
  • 1.7%Fair
  • 1.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.9%Excellent
  • 29.3%Very good
  • 33.3%Good
  • 10.9%Satisfactory
  • 0.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 24.7%Excellent
  • 34.4%Very good
  • 24.7%Good
  • 12.9%Satisfactory
  • 2.2%Fair
  • 1.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 55.6%Good
  • 27.8%Satisfactory
Find on map >>   Show street view

Structure Number: 480622,  Location: JCT. IR 280 and SR25 (Lat: 41.674689,  Lng: -83.515231),  Route carried "under" structure: State highway 25,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 12,297 (year 2018),  Truck Traffic: 4%,  Features Intersected: IR 280
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 18.324,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 4806263,  Location: JCT CENTRAL AVE I-280 (Lat: 41.678989,  Lng: -83.515661),  Route carried "under" structure: Interstate 280,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 64,897 (year 2019),  Truck Traffic: 11%,  Features Intersected: CENTRAL AVENUE
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 7.918,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 4806344,  Location: JCT I280 & MANHATTAN BLVD (Lat: 41.687489,  Lng: -83.516689),  Route carried "under" structure: Interstate 280,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 15,896 (year 2019),  Truck Traffic: 8%,  Features Intersected: MANHATTAN BOULEVARD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 8.835,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 4806379,  Location: JCT I280 & MANHATTAN BLVD (Lat: 41.687550,  Lng: -83.515681),  Route carried "under" structure: Interstate 280,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 27,312 (year 2019),  Truck Traffic: 14%,  Features Intersected: MANHATTAN BLVD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 8.835,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 4806433,  Location: JCT I 280 SB & I 75 NB (Lat: 41.689200,  Lng: -83.516600),  Route carried "under" structure: Interstate 280,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 16,195 (year 2010),  Truck Traffic: 21%,  Features Intersected: IR 280 NB RAMP TO SB IR7
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 9.061,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 4807324,  Location: 0.23 Mi. N. of IR 80/90 (Lat: 41.595419,  Lng: -83.691781),  Route carried "under" structure: Interstate 475,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 80,199 (year 2019),  Truck Traffic: 9%,  Features Intersected: CR 84 GARDEN ROAD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 5.617,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 4807359,  Location: 0.56 Mi. N. of IR 80/90 (Lat: 41.599989,  Lng: -83.690789),  Route carried "under" structure: Interstate 475,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 80,199 (year 2019),  Truck Traffic: 9%,  Features Intersected: C1571-PERRYSBURG HOLLAND
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 6.148,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 4807626,  Location: Int. IR 475 & Hill Ave. (Lat: 41.638500,  Lng: -83.694711),  Route carried "under" structure: County highway C0030,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,196 (year 2018),  Truck Traffic: 2%,  Features Intersected: IR 475
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 5.549,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.4m (73.5ft)

Find on map >>   Show street view

Structure Number: 480765,  Location: Int. IR 475 & Hill Ave. (Lat: 41.638489,  Lng: -83.694300),  Route carried "under" structure: County highway C0030,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,196 (year 2018),  Truck Traffic: 2%,  Features Intersected: IR 475
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 5.584,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.4m (73.5ft)

Find on map >>   Show street view

Structure Number: 4807685,  Location: Int. IR 475 & Dorr St. (Lat: 41.653631,  Lng: -83.695161),  Route carried "under" structure: State highway 246,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 7,935 (year 2018),  Truck Traffic: 8%,  Features Intersected: IR 475
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 10.400,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.4m (73.5ft)

Find on map >>   Show street view

Structure Number: 4807715,  Location: Int. IR 475 & Dorr St. (Lat: 41.653631,  Lng: -83.694761),  Route carried "under" structure: State highway 246,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 7,935 (year 2018),  Truck Traffic: 8%,  Features Intersected: IR 475
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 10.437,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.4m (73.5ft)

Find on map >>   Show street view

Structure Number: 4807774,  Location: IR 475 & Bancroft St. (Lat: 41.660969,  Lng: -83.694531),  Route carried "under" structure: Interstate 475,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 80,920 (year 2018),  Truck Traffic: 9%,  Features Intersected: CR 22-BANCROFT STREET
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 12.923,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 4808045,  Location: 1.65 MI E - US23 & IR 475 (Lat: 41.689839,  Lng: -83.663439),  Route carried "under" structure: Interstate 475,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 49,660 (year 2010),  Truck Traffic: 12%,  Features Intersected: M0062 COREY ROAD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 18.314,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 4808134,  Location: 2.65 MI E - US23 & IR 475 (Lat: 41.688039,  Lng: -83.644461),  Route carried "under" structure: Interstate 475,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 52,022 (year 2018),  Truck Traffic: 9%,  Features Intersected: C0083 TALMADGE ROAD
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 19.924,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 4808169,  Location: 3.10 MI E - US23 & IR 475 (Lat: 41.688219,  Lng: -83.635611),  Route carried "under" structure: Interstate 475,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 71,067 (year 2018),  Truck Traffic: 9%,  Features Intersected: WOODLEY ROAD
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 20.648,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 4808193,  Location: 3.75 MI E - US23 & IR 475 (Lat: 41.686550,  Lng: -83.623050),  Route carried "under" structure: City street C0501,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 21,856 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 475
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 9.704,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 4808223,  Location: 4.15 Mi E - US23 & IR 475 (Lat: 41.685350,  Lng: -83.616039),  Route carried "under" structure: Interstate 475,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 71,290 (year 2019),  Truck Traffic: 9%,  Features Intersected: RAMP FROM SB 51 TO EB 47
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 22.354,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 4808282,  Location: 0.19 Mi. E. of SR 51 (Lat: 41.685489,  Lng: -83.610389),  Route carried "under" structure: Interstate 475,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 80,228 (year 2019),  Truck Traffic: 9%,  Features Intersected: M0766 BOWEN ROAD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 22.820,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 4808312,  Location: 0.36 Mi E. - SR 51 (Lat: 41.685661,  Lng: -83.607361),  Route carried "under" structure: Interstate 475,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 80,228 (year 2019),  Truck Traffic: 9%,  Features Intersected: M1899 RUSHLAND AVE
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 23.078,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 4808355,  Location: 1/4 MI N SR 51 (Lat: 41.684881,  Lng: -83.603719),  Route carried "under" structure: Interstate 475,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 83,030 (year 2010),  Truck Traffic: 11%,  Features Intersected: M0502 DOUGLAS ROAD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 23.384,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 4808444,  Location: JCT I-475 & SHERBROOKE RD (Lat: 41.683061,  Lng: -83.599619),  Route carried "under" structure: Interstate 475,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 97,026 (year 2019),  Truck Traffic: 9%,  Features Intersected: M1962 SHERBROOKE ROAD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 23.786,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 4808495,  Location: 0.7 MI W. of IR 75 (Lat: 41.678100,  Lng: -83.587300),  Route carried "under" structure: State highway 120,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 15,405 (year 2018),  Truck Traffic: 4%,  Features Intersected: IR 475
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 24.349,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 4808509,  Location: JCT I475 & PROMEDICA PKWY (Lat: 41.679531,  Lng: -83.591381),  Route carried "under" structure: Interstate 475,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 97,026 (year 2019),  Truck Traffic: 9%,  Features Intersected: M9006 PROMEDICA PARKWAY
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 24.575,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 4808525,  Location: JCT IR475 & UPTON AVE (Lat: 41.678969,  Lng: -83.589339),  Route carried "under" structure: County highway C0522,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 8,553 (year 2019),  Truck Traffic: 8%,  Features Intersected: IR 475
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 2.981,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 4808533,  Location: JCT I-475 & UPTON AVE (Lat: 41.679439,  Lng: -83.589361),  Route carried "under" structure: City street C0522,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 8,553 (year 2019),  Truck Traffic: 8%,  Features Intersected: IR 475 Ramp D4
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 10.799,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 4808541,  Location: JCT I-475 & UPTON AVE (Lat: 41.678550,  Lng: -83.589331),  Route carried "under" structure: City street C0522,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 8,553 (year 2019),  Truck Traffic: 8%,  Features Intersected: IR 475 RAMP D6
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 2.876,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 4808584,  Location: 0.36 MI W - US23 & IR 475 (Lat: 41.674861,  Lng: -83.579411),  Route carried "under" structure: Interstate 475,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 90,124 (year 2018),  Truck Traffic: 9%,  Features Intersected: AUBURN AVE.
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 25.669,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 4808681,  Location: JCT 475 & 75 (Lat: 41.675381,  Lng: -83.575311),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 90,150 (year 2018),  Truck Traffic: 9%,  Features Intersected: IR 475
Minimum Vertical Clearance: 8.59m (28.18ft),  Kilometerpoint: 7.403,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 4860004,  Location: E. OF SUMMIT (Lat: 41.651139,  Lng: -83.526289),  Route carried "under" structure: City street 2153,  Year Built: 1914,  Structure Length: 0. m,  Average Daily Traffic: 3,479 (year 2015),  Truck Traffic: 5%,  Features Intersected: CHERRY ST BRIDGE,  Facility Carried by Structure: WATER STREET
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.032,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Length of Maximum Span: 74.5m (244.4ft)

Find on map >>   Show street view

Structure Number: 4860543,  Location: .5 MI S OF HILL (Lat: 41.631261,  Lng: -83.625919),  Route carried "under" structure: City street 209,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 1,295 (year 2015),  Truck Traffic: 5%,  Features Intersected: BYRNE ROAD,  Facility Carried by Structure: SOUTH STREET
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 14.548,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 4861116,  Location: 0.74 MI N OF DORR STR (Lat: 41.663150,  Lng: -83.608381),  Route carried "under" structure: City street 1W06,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 33 (year 2015),  Truck Traffic: 6%,  Features Intersected: N. DOUGLAS RD.,  Facility Carried by Structure: BANCROFT STREET
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 13.728,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 4861175,  Location: 2.0 MI E OF CHERRY STREET (Lat: 41.679119,  Lng: -83.516900),  Route carried "under" structure: City street BKEYE,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1951),  Features Intersected: E. CENTRAL AVE,  Facility Carried by Structure: BUCKEYE STREET
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 4861531,  Location: JEEP DRIVE (Lat: 41.698981,  Lng: -83.527661),  Route carried "under" structure: City street O1W43,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 1,295 (year 2015),  Truck Traffic: 5%,  Features Intersected: JEEP DRIVE,  Facility Carried by Structure: STICKNEY AVENUE
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 6.759,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 8729085,  Location: 3.7MI EAST OF EXIT 59 (Lat: 41.577431,  Lng: -83.601461),  Route carried "under" structure: State highway 65,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 7,463 (year 2015),  Truck Traffic: 3%,  Features Intersected: I80 OHIO TPK
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 33.152,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Toledo, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.