Bridge Statistics for West Seneca, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 92Number of bridges
  • 1,168ft / 356mTotal length
  • $453,965,000Total costs
  • 1,734,757Total average daily traffic
  • 96,771Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Seneca
  • No street view available for this location

New bridges in West Seneca, NY - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 41930-1939
  • 121950-1959
  • 171960-1969
  • 251970-1979
  • 71980-1989
  • 111990-1999
  • 72000-2009
  • 72010-2019
Reconstructed bridges in West Seneca, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 31990-1999
  • 52000-2009
  • 52010-2019
Average Bridge Daily Traffic in West Seneca, NY
Average Bridge Truck Traffic in West Seneca, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.4%Excellent
  • 22.4%Very good
  • 43.1%Good
  • 19.0%Satisfactory
  • 10.3%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.2%Excellent
  • 30.5%Very good
  • 30.5%Good
  • 11.9%Satisfactory
  • 11.9%Fair
  • 5.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.8%Excellent
  • 16.9%Very good
  • 45.8%Good
  • 20.3%Satisfactory
  • 5.1%Fair
  • 3.4%Poor
  • 1.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.4%Excellent
  • 27.6%Very good
  • 31.0%Good
  • 31.0%Satisfactory
  • 6.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101549,  Location: 0.7 MI W JCT RTS 20 & 219 (Lat: 42.780289,  Lng: -78.784431),  Route carried "on" structure: US 20,  Year Built: 1979,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 15,922 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,996 (year 2040),  Design Load: HS 20,  Features Intersected: SMOKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.720,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 25.4m (83.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,225,000,  Roadway Improvement Cost: $1,303,000,  Total Project Cost: $3,529,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101551,  Location: JCT RTS 20 + 277 (Lat: 42.795453,  Lng: -78.753369),  Route carried "on" structure: US 20,  Year Built: 1965,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 20,303 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,398 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SMOKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.986,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 38.1m (125.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,182,000,  Roadway Improvement Cost: $1,278,000,  Total Project Cost: $3,460,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101552,  Location: 0.7 MI S JCT RTS 20 + 16 (Lat: 42.815314,  Lng: -78.696903),  Route carried "on" structure: US 20,  Year Built: 1929,  Status: Open,  Structure Length: 25.33m (83.10ft),  Average Daily Traffic: 19,766 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,858 (year 2040),  Design Load: HS 20,  Features Intersected: CAZENOVIA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.473,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 25.32m (83.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $20,102,000,  Roadway Improvement Cost: $11,772,000,  Total Project Cost: $31,874,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 101554,  Location: JCT RTE 20 + BFLO CREEK (Lat: 42.859364,  Lng: -78.697028),  Route carried "on" structure: US 20,  Year Built: 2002,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 21,638 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,739 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.364,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.4m (63.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 24.9m (81.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,897,000,  Roadway Improvement Cost: $2,282,000,  Total Project Cost: $6,179,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104256,  Location: 0.2 MI S JCT RTS 240 + 20 (Lat: 42.793133,  Lng: -78.751669),  Route carried "on" structure: State highway 240,  Year Built: 1993,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 13,180 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,241 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SMOKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.984,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,736,000,  Roadway Improvement Cost: $1,017,000,  Total Project Cost: $2,753,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104257,  Location: .8 MI SE JCT SH240 & SH16 (Lat: 42.833272,  Lng: -78.782364),  Route carried "on" structure: State highway 240,  Year Built: 1999,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 10,015 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,062 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.342,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,760,000,  Roadway Improvement Cost: $1,030,000,  Total Project Cost: $2,790,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10426,  Location: 0.1 MI SE JCT RTS 240 +16 (Lat: 42.841456,  Lng: -78.789394),  Route carried "on" structure: State highway 240,  Year Built: 1932,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 12,794 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,854 (year 2040),  Design Load: HS 20,  Features Intersected: CAZENOVIA CREEK
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 46.532,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.7m (159.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.05m (16.57ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $5,718,000,  Roadway Improvement Cost: $3,348,000,  Total Project Cost: $9,066,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104261,  Location: 1.2 MI S JCT SH240 &SH354 (Lat: 42.854547,  Lng: -78.787719),  Route carried "on" structure: State highway 240,  Year Built: 1987,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 8,763 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,253 (year 2040),  Design Load: HS 20,  Features Intersected: INDIN CH RD-CR109, NORFO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.093,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,292,000,  Roadway Improvement Cost: $2,513,000,  Total Project Cost: $6,805,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104262,  Location: 0.1 MI S JCT RTS 240 +354 (Lat: 42.870031,  Lng: -78.787267),  Route carried "on" structure: State highway 240,  Year Built: 2017,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 12,722 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,434 (year 2040),  Design Load: HL 93,  Features Intersected: BUFFALO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.831,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $8,439,000,  Roadway Improvement Cost: $4,942,000,  Total Project Cost: $13,382,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104422,  Location: 1.3 MI S JCT RTS 277 +400 (Lat: 42.825256,  Lng: -78.753308),  Route carried "on" structure: State highway 277,  Year Built: 1929,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 19,585 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,677 (year 2040),  Features Intersected: CAZENOVIA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.088,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $6,574,000,  Roadway Improvement Cost: $3,850,000,  Total Project Cost: $10,424,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104423,  Location: 0.1 MI N JCT RTS 400 &277 (Lat: 42.844383,  Lng: -78.754311),  Route carried "on" structure: State highway 277,  Year Built: 1997,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 21,280 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,380 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SO RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.211,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $4,360,000,  Roadway Improvement Cost: $2,553,000,  Total Project Cost: $6,914,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104425,  Location: JCT RTE 277 & BUFFALO CK (Lat: 42.854742,  Lng: -78.754675),  Route carried "on" structure: State highway 277,  Year Built: 1980,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 21,280 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,380 (year 2040),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.386,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,289,000,  Roadway Improvement Cost: $2,511,000,  Total Project Cost: $6,800,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104648,  Location: 0.2 MI E JCT RTS 354 &240 (Lat: 42.871069,  Lng: -78.783625),  Route carried "on" structure: State highway 354,  Year Built: 1981,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 8,072 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,524 (year 2040),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.659,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,464,000,  Roadway Improvement Cost: $2,614,000,  Total Project Cost: $7,078,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1047671,  Location: .8 MI W JCT SH400 & US 20 (Lat: 42.839200,  Lng: -78.711617),  Route carried "on" structure: State highway 400,  Year Built: 1968,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 11,370 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,175 (year 2040),  Features Intersected: LEIN ROAD- CR 154
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.595,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,394,000,  Roadway Improvement Cost: $816,000,  Total Project Cost: $2,210,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1047672,  Location: .8 MI W JCT SH400 & US 20 (Lat: 42.839492,  Lng: -78.711592),  Route carried "on" structure: State highway 400,  Year Built: 1968,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 11,370 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,175 (year 2040),  Features Intersected: LEIN ROAD- CR 154
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.595,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $2,384,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1047689,  Location: 3.1 MI E JCT RTS 400 + 20 (Lat: 42.843314,  Lng: -78.756658),  Route carried "on" structure: Ramp State highway ,  Year Built: 1969,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 1,110 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,286 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 400,  Facility Carried by Structure: RAMP E FROM 277
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,625,000,  Roadway Improvement Cost: $2,708,000,  Total Project Cost: $7,333,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104769,  Location: 3.5 MI E JCT SH400 & US20 (Lat: 42.843431,  Lng: -78.764806),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 1,399 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,959 (year 2038),  Design Load: HS 20,  Features Intersected: RTE 400, AURORA EXPRESSW,  Facility Carried by Structure: BIRCHWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.94m (22.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,681,000,  Roadway Improvement Cost: $1,570,000,  Total Project Cost: $4,251,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1047701,  Location: 4.1 MI E JCT SH400 & US20 (Lat: 42.845078,  Lng: -78.774569),  Route carried "on" structure: State highway 400,  Year Built: 1968,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 13,315 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,429 (year 2040),  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.841,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,069,000,  Roadway Improvement Cost: $1,211,000,  Total Project Cost: $3,280,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1047702,  Location: 4.1 MI E JCT SH400 & US20 (Lat: 42.845325,  Lng: -78.774408),  Route carried "on" structure: State highway 400,  Year Built: 1968,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 13,315 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,429 (year 2040),  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.841,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.27m (20.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,255,000,  Roadway Improvement Cost: $1,320,000,  Total Project Cost: $3,575,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1047719,  Location: 0.2 MI E JCT RT 400 + I90 (Lat: 42.848253,  Lng: -78.780894),  Route carried "on" structure: Ramp State highway ,  Year Built: 1968,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 2,454 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,843 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 400 400 53011164 NB, RTE,  Facility Carried by Structure: 400 WB to 953C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.8m (120.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Poor,  Superstructure: Very good,  Substructure: Poor,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,962,000,  Roadway Improvement Cost: $2,320,000,  Total Project Cost: $6,282,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106067,  Location: JCT RTS 277 + 400 (Lat: 42.843278,  Lng: -78.754264),  Route carried "on" structure: State highway 277,  Year Built: 1969,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 25,807 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,928 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 400
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.099,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.3m (115.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,955,000,  Roadway Improvement Cost: $2,902,000,  Total Project Cost: $7,856,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 106291,  Location: JCT RTS 20 + 219 (Lat: 42.781844,  Lng: -78.771725),  Route carried "on" structure: US 20,  Year Built: 1971,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 15,922 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,996 (year 2040),  Features Intersected: 219 219 53121229 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.733,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.4m (122.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $6,869,000,  Roadway Improvement Cost: $4,022,000,  Total Project Cost: $10,891,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062921,  Location: 0.6 MI N JCT RTS 219 + 20 (Lat: 42.789231,  Lng: -78.775000),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 15,573 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,045 (year 2040),  Design Load: HS 20,  Features Intersected: 179 179 53011037 WB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.230,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,116,000,  Roadway Improvement Cost: $2,411,000,  Total Project Cost: $6,527,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062922,  Location: 0.6 MI N JCT RTS 219 + 20 (Lat: 42.788906,  Lng: -78.774072),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 15,573 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,045 (year 2040),  Design Load: HS 20,  Features Intersected: 179 179 53011037 WB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.230,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,116,000,  Roadway Improvement Cost: $2,411,000,  Total Project Cost: $6,527,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062931,  Location: 1.1 MI N JCT RTS 219 + 20 (Lat: 42.796528,  Lng: -78.776731),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 14,601 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,919 (year 2040),  Features Intersected: LAKE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.099,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,779,000,  Roadway Improvement Cost: $1,042,000,  Total Project Cost: $2,821,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062932,  Location: 1.1 MI N JCT RTS 219 + 20 (Lat: 42.796514,  Lng: -78.775881),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 14,601 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,919 (year 2040),  Features Intersected: LAKE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.099,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,779,000,  Roadway Improvement Cost: $1,042,000,  Total Project Cost: $2,821,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106294,  Location: 1.5 MI N JCT US20 & US219 (Lat: 42.803739,  Lng: -78.778056),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 2,631 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,255 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 219,  Facility Carried by Structure: COUNTY ROAD 187
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.0m (137.8ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,630,000,  Roadway Improvement Cost: $2,126,000,  Total Project Cost: $5,755,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106295,  Location: 1.6 MI N JCT US20 & US219 (Lat: 42.804072,  Lng: -78.779425),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 2,631 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,255 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 219,  Facility Carried by Structure: COUNTY ROAD 187
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,767,000,  Roadway Improvement Cost: $1,621,000,  Total Project Cost: $4,388,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062961,  Location: 1.1 MI S JCT RTE 219 +I90 (Lat: 42.813636,  Lng: -78.792953),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 20.94m (68.70ft),  Average Daily Traffic: 14,601 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,919 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I90, CR 459 FISHER R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.641,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 55.7m (182.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 20.93m (68.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $9,601,000,  Roadway Improvement Cost: $5,622,000,  Total Project Cost: $15,224,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062962,  Location: 1.1 MI S JCT RTE 219 +I90 (Lat: 42.814383,  Lng: -78.792003),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 14,601 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,919 (year 2040),  Design Load: HS 20,  Features Intersected: FISHER RD CR 459
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.641,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.1m (144.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,172,000,  Roadway Improvement Cost: $1,857,000,  Total Project Cost: $5,029,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062971,  Location: .6 MI S JCT US 219 & I90 (Lat: 42.819661,  Lng: -78.791547),  Route carried "on" structure: US 219,  Year Built: 1972,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 21,329 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,716 (year 2040),  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.252,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $6,669,000,  Roadway Improvement Cost: $3,905,000,  Total Project Cost: $10,574,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062972,  Location: .6 MI S JCT US 219 & I90 (Lat: 42.820153,  Lng: -78.790808),  Route carried "on" structure: US 219,  Year Built: 1972,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 14.72m (48.29ft),  Average Daily Traffic: 21,329 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,716 (year 2040),  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.252,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.72m (48.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $7,955,000,  Roadway Improvement Cost: $4,658,000,  Total Project Cost: $12,614,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062981,  Location: 0.4 MI S JCT RTE 219 +I90 (Lat: 42.823669,  Lng: -78.791406),  Route carried "on" structure: US 219,  Year Built: 1972,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 21,329 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,716 (year 2040),  Features Intersected: SMOKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.671,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,442,000,  Roadway Improvement Cost: $1,430,000,  Total Project Cost: $3,871,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1062982,  Location: 0.4 MI S JCT RTE 219 +I90 (Lat: 42.823758,  Lng: -78.790692),  Route carried "on" structure: US 219,  Year Built: 1972,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 21,329 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,716 (year 2040),  Features Intersected: SMOKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.671,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,312,000,  Roadway Improvement Cost: $1,354,000,  Total Project Cost: $3,667,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1062999,  Location: EXIT 55 OF US 219 (Lat: 42.828228,  Lng: -78.790786),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 19,169 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,259 (year 2040),  Features Intersected: 219 219 53121265 NB, 90I,  Facility Carried by Structure: COUNTY ROAD 137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 4,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.26m (30.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,252,000,  Roadway Improvement Cost: $4,246,000,  Total Project Cost: $11,498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 22604,  Location: 2.5 MI W JCT SH78 & US20 (Lat: 42.829486,  Lng: -78.744122),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 2,401 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,361 (year 2037),  Features Intersected: CAZENOVIA CREEK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,351,000,  Roadway Improvement Cost: $1,376,000,  Total Project Cost: $3,727,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss West Seneca, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.