Bridge Statistics for Portsmouth, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 60Number of bridges
  • 1,230ft / 375mTotal length
  • $132,499,000Total costs
  • 1,230,403Total average daily traffic
  • 72,213Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Portsmouth
  • No street view available for this location

New bridges in Portsmouth, NH - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31920-1929
  • 51940-1949
  • 31950-1959
  • 311970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
  • 112010-2019
  • 22020-2022
Reconstructed bridges in Portsmouth, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 21970-1979
  • 01980-1989
  • 01990-1999
  • 32000-2009
  • 22010-2019
  • 32020-2022
Average Bridge Daily Traffic in Portsmouth, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.0%Excellent
  • 27.5%Very good
  • 35.0%Good
  • 25.0%Satisfactory
  • 5.0%Fair
  • 2.5%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Excellent
  • 27.5%Very good
  • 47.5%Good
  • 12.5%Satisfactory
  • 7.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Excellent
  • 25.0%Very good
  • 50.0%Good
  • 17.5%Satisfactory
  • 2.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 11.1%Very good
  • 55.6%Good
  • 27.8%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 25.0%Serious
Find on map >>   Show street view

Structure Number: 217024100069,  Location: 200 FT FROM MECHANIC ST (Lat: 43.075297,  Lng: -70.749481),  Route carried "on" structure: City street ,  Year Built: 1958,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 912 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,349 (year 2042),  Design Load: HS 15,  Features Intersected: LITTLE HARBOR,  Facility Carried by Structure: PIERCES ISLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.092,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 217024100106,  Location: .5 MI E JCT I-95 (Lat: 43.083128,  Lng: -70.763458),  Route carried "on" structure: State highway ,  Year Built: 1971,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 7,936 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,745 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: TIDAL BASIN,  Facility Carried by Structure: MARKET STREET WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 217024100108,  Location: 0.1 FROM SARAH LONG BR. (Lat: 43.083461,  Lng: -70.765714),  Route carried "on" structure: Business Other road ,  Year Built: 1984,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 10 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 14 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NORTH MILL POND,  Facility Carried by Structure: SUBMARINE WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.027,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 217024600083,  Location: 0.1 MI SOUTH MAINE-NH SL (Lat: 43.078108,  Lng: -70.753122),  Route carried "on" structure: US 1,  Year Built: 1921,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 4.06m (13.32ft),  Average Daily Traffic: 12,566 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,597 (year 2042),  Design Load: HL 93,  Features Intersected: DANIEL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.841,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.06m (13.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 217024700084,  Location: NH-MAINE SL (Lat: 43.079611,  Lng: -70.752553),  Route carried "on" structure: US 1,  Year Built: 1921,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 27.51m (90.26ft),  Average Daily Traffic: 8,377 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,397 (year 2042),  Design Load: HL 93,  Features Intersected: PISCATAQUA RIVER
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 26.998,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 45.7m (149.9ft), Horizontal Clearance: 80.5m (264.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 90.5m (296.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 27.51m (90.26ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: September 2008,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21702500011,  Location: MAINE STATELINE (Lat: 43.086617,  Lng: -70.761139),  Route carried "on" structure: US 1BYP,  Year Built: 2017,  Status: Open,  Structure Length: 84.86m (278.41ft),  Average Daily Traffic: 10,398 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,389 (year 2042),  Design Load: HL 93,  Features Intersected: PISCATAQUA RIVER,RR,  Facility Carried by Structure: US 1 BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.096,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 76.2m (250.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 102.1m (335.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 84.86m (278.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 217025700127,  Location: Approach to High Level Br (Lat: 43.089706,  Lng: -70.771006),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Status: Open,  Structure Length: 55.17m (181.00ft),  Average Daily Traffic: 69,967 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 103,551 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: PREBLE WAY,PAR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.465,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 55.17m (181.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 217025800128,  Location: I-95 AT MAINE STATE LINE (Lat: 43.092536,  Lng: -70.766983),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Status: Open,  Structure Length: 40.97m (134.42ft),  Average Daily Traffic: 69,967 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 103,551 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: PISCATAQUA RIVER
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 25.880,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 134.1m (440.0ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 230.4m (755.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.97m (134.42ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 217013600127,  Location: 3.0MI S OF MAINE S/L (Lat: 43.058031,  Lng: -70.804217),  Route carried "under" structure: Interstate 95,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 97,000 (year 2012),  Truck Traffic: 6%,  Features Intersected: I-95,  Facility Carried by Structure: NH 33
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 217014400125,  Location: 2.8MI S OF MAINE S/L (Lat: 43.060233,  Lng: -70.800889),  Route carried "under" structure: Interstate 95,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 69,000 (year 2015),  Truck Traffic: 6%,  Features Intersected: I-95,  Facility Carried by Structure: SHERBURNE ROAD
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 217018000122,  Location: SP TPK,I-95 INTERCHANGE (Lat: 43.069625,  Lng: -70.787756),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 1984),  Truck Traffic: 6%,  Features Intersected: I-95 NB RAMP
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 217018300087,  Location: 0.6MI FROM JCT RT 1 (Lat: 43.061814,  Lng: -70.774239),  Route carried "under" structure: Bypass US 1,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2013),  Truck Traffic: 8%,  Features Intersected: US 1 BYPASS,  Facility Carried by Structure: NH 33
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 217018300121,  Location: SP TPK,I-95 INTERCHANGE (Lat: 43.070017,  Lng: -70.786772),  Route carried "under" structure: Interstate 95,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 89,900 (year 2009),  Truck Traffic: 6%,  Features Intersected: I-95 NB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 217018400124,  Location: SP TPK,I-95 INTERCHANGE (Lat: 43.070769,  Lng: -70.787419),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 1984),  Truck Traffic: 4%,  Features Intersected: NB RAMP
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 217018800097,  Location: 1.0 MI FROM JCT US 1 (Lat: 43.065828,  Lng: -70.776469),  Route carried "under" structure: Bypass US 1,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 2015),  Truck Traffic: 8%,  Features Intersected: US 1 BYPASS,  Facility Carried by Structure: ISLINGTON STREET
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 217019100131,  Location: AUX. ENTRANCE TO PAFB (Lat: 43.074714,  Lng: -70.788086),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 1984),  Truck Traffic: 6%,  Features Intersected: I-95 RAMPS,  Facility Carried by Structure: ASHLAND ROAD
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 217019700122,  Location: I-95,SP TPK INTERCHANGE (Lat: 43.074214,  Lng: -70.782461),  Route carried "under" structure: US 4,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 2013),  Truck Traffic: 8%,  Features Intersected: US 4,NH 16,SP TPK,  Facility Carried by Structure: I-95 NB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 217019800123,  Location: I-95,SP TPK INTERCHANGE (Lat: 43.074450,  Lng: -70.782733),  Route carried "under" structure: US 4,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 2013),  Truck Traffic: 8%,  Features Intersected: US 4,NH 16,SP TPK,  Facility Carried by Structure: I-95 SB
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 217019900139,  Location: N SP TPK I-95 INTERCHANGE (Lat: 43.078967,  Lng: -70.789125),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2002),  Truck Traffic: 8%,  Features Intersected: NB RAMP,  Facility Carried by Structure: US 4,NH 16,SP TPK
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 217020500116,  Location: 0.6 MI FROM MAINE SL (Lat: 43.074700,  Lng: -70.778303),  Route carried "under" structure: Bypass US 1,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2015),  Truck Traffic: 8%,  Features Intersected: US 1 BYPASS,  Facility Carried by Structure: WOODBURY AVENUE
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 217021100114,  Location: 0.2 MI FROM JCT NH 16 (Lat: 43.076400,  Lng: -70.775831),  Route carried "under" structure: Bypass US 1,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2012),  Truck Traffic: 8%,  Features Intersected: US 1 BYPASS,  Facility Carried by Structure: STARK STREET
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 217022200121,  Location: .6 MI FROM JCT NH 16 (Lat: 43.081128,  Lng: -70.774847),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 1,300 (year 2014),  Truck Traffic: 3%,  Features Intersected: MAPLEWOOD AVENUE,  Facility Carried by Structure: I-95
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 217022700112,  Location: .8 MI FROM JCT NH 16 (Lat: 43.080611,  Lng: -70.769647),  Route carried "under" structure: Bypass US 1,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2012),  Truck Traffic: 8%,  Features Intersected: US 1 BYPASS,  Facility Carried by Structure: MAPLEWOOD AVENUE
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 217024600083,  Location: 0.1 MI SOUTH MAINE-NH SL (Lat: 43.078108,  Lng: -70.753122),  Route carried "under" structure: City street ,  Year Built: 1921,  Structure Length: 0. m,  Average Daily Traffic: 4,400 (year 2009),  Truck Traffic: 5%,  Features Intersected: DANIEL STREET,  Facility Carried by Structure: US 1,SCOTT AVENUE
Minimum Vertical Clearance: 4.03m (13.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)