Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pasadena, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 232Number of bridges
  • 3,068ft / 935mTotal length
  • $10,758,000Total costs
  • 13,865,314Total average daily traffic
  • 685,839Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pasadena
  • No street view available for this location

New bridges in Pasadena, CA - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 61920-1929
  • 61930-1939
  • 131950-1959
  • 51960-1969
  • 1841970-1979
  • 61980-1989
  • 41990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Pasadena, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 31960-1969
  • 01970-1979
  • 11980-1989
  • 21990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Pasadena, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.7%Very good
  • 70.0%Good
  • 4.5%Satisfactory
  • 22.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 0.9%Very good
  • 63.6%Good
  • 4.5%Satisfactory
  • 28.2%Fair
  • 2.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.8%Very good
  • 91.8%Good
  • 2.7%Satisfactory
  • 3.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 71.0%Excellent
  • 22.6%Very good
  • 3.2%Good
  • 3.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 53 2093R,  Location: 07-LA-210-R27.18-PAS (Lat: 34.152028,  Lng: -118.117594),  Route carried "under" structure: City street Q310,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2015),  Truck Traffic: 2%,  Features Intersected: SIERRA BONITA AVE,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 53 2097,  Location: 07-LA-134-R12.36-PAS (Lat: 34.143489,  Lng: -118.171089),  Route carried "under" structure: State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 224,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 134,  Facility Carried by Structure: SAN RAFAEL AVE
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 12.360,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.8m (94.5ft)

Find on map >>   Show street view

Structure Number: 53 2099L,  Location: 07-LA-210-R28.87-PAS (Lat: 34.150253,  Lng: -118.088692),  Route carried "under" structure: City street L718,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 2015),  Truck Traffic: 7%,  Features Intersected: FOOTHILL BLVD,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 53 2099R,  Location: 07-LA-210-R28.87-PAS (Lat: 34.150239,  Lng: -118.089342),  Route carried "under" structure: City street L718,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 2015),  Truck Traffic: 3%,  Features Intersected: FOOTHILL BLVD,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 53 2153,  Location: 07-LA-210-R22.49-PAS (Lat: 34.181639,  Lng: -118.169122),  Route carried "under" structure: Interstate 210,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 113,000 (year 2015),  Truck Traffic: 10%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: ARROYO BLVD
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 22.490,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 53 2154,  Location: 07-LA-210-R22.84-PAS (Lat: 34.177733,  Lng: -118.164608),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 2015),  Truck Traffic: 2%,  Features Intersected: CASITAS AVE,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 53 2155,  Location: 07-LA-210-R23.19-PAS (Lat: 34.174039,  Lng: -118.159928),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2015),  Truck Traffic: 2%,  Features Intersected: LINCOLN - HOWARD UC,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 23.190,  Lanes on structure: 9,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 53 2155,  Location: 07-LA-210-R23.19-PAS (Lat: 34.174039,  Lng: -118.159928),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2015),  Truck Traffic: 3%,  Features Intersected: LINCOLN - HOWARD UC,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 23.190,  Lanes on structure: 9,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 53 2156K,  Location: 07-LA-210-R23.22-PAS (Lat: 34.173606,  Lng: -118.158642),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2015),  Truck Traffic: 2%,  Features Intersected: HOWARD STREET,  Facility Carried by Structure: INTERSTATE 210 OFF
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 23.220,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: 53 2157,  Location: 07-LA-210-R23.55-PAS (Lat: 34.169772,  Lng: -118.158119),  Route carried "under" structure: City street Q295,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 10,500 (year 2015),  Truck Traffic: 2%,  Features Intersected: WASHINGTON BLVD,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 53 2158,  Location: 07-LA-210-R23.80-PAS (Lat: 34.166167,  Lng: -118.158400),  Route carried "under" structure: City street Q489,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,800 (year 2015),  Truck Traffic: 2%,  Features Intersected: HAMMOND STREET,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 53 2159,  Location: 07-LA-210-R24.06-PAS (Lat: 34.162389,  Lng: -118.158728),  Route carried "under" structure: City street Q488,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 9,500 (year 2015),  Truck Traffic: 2%,  Features Intersected: MOUNTAIN AVENUE,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 216,  Location: 07-LA-210-R24.17-PAS (Lat: 34.161058,  Lng: -118.158842),  Route carried "under" structure: City street L509,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,560 (year 2015),  Truck Traffic: 2%,  Features Intersected: LINCOLN AVE,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 53 2160S,  Location: 07-LA-210-R24.17-PAS (Lat: 34.161244,  Lng: -118.159044),  Route carried "under" structure: City street L509,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,560 (year 2015),  Truck Traffic: 2%,  Features Intersected: LINCOLN AVE,  Facility Carried by Structure: INTERSTATE 210 ONR
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 53 2173,  Location: 07-LA-210-R22.14-PAS (Lat: 34.183408,  Lng: -118.174328),  Route carried "under" structure: Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 113,000 (year 2010),  Truck Traffic: 10%,  Features Intersected: ARROYO SECO
Minimum Vertical Clearance: 13.30m (43.64ft),  Kilometerpoint: 22.140,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: 53 2195,  Location: 07-LA-210-R24.64-PAS (Lat: 34.154567,  Lng: -118.156644),  Route carried "under" structure: State highway 210,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,350 (year 2015),  Truck Traffic: 7%,  Features Intersected: I 210 & CONNECTORS,  Facility Carried by Structure: ORANGE GROVE BLVD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 24.640,  Lanes on structure: 4,  Lanes under structure: 15,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 53 2197K,  Location: 07-LA-134-R12.90-PAS (Lat: 34.146231,  Lng: -118.164347),  Route carried "under" structure: State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 224,000 (year 2014),  Truck Traffic: 6%,  Features Intersected: ST RTE 134 & STREETS
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 12.900,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 53 2197K,  Location: 07-LA-134-R12.90-PAS (Lat: 34.146231,  Lng: -118.164347),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 1998),  Truck Traffic: 1%,  Features Intersected: ST RTE 134 & STREETS,  Facility Carried by Structure: ORANGE GROVE-W134
Minimum Vertical Clearance: 17.22m (56.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 53 2197K,  Location: 07-LA-134-R12.90-PAS (Lat: 34.146231,  Lng: -118.164347),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 1998),  Truck Traffic: 1%,  Features Intersected: ST RTE 134 & STREETS,  Facility Carried by Structure: ORANGE GROVE-W134
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 53 2226,  Location: 07-LA-134-R12.90-PAS (Lat: 34.145658,  Lng: -118.162575),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 6,401 (year 2014),  Truck Traffic: 6%,  Features Intersected: E134-COLORADO BL OFF-RMP,  Facility Carried by Structure: COLORADO BLVD WB
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 12.900,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 53 2253K,  Location: 07-LA-134-R13.08-PAS (Lat: 34.147750,  Lng: -118.160264),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 2013),  Truck Traffic: 2%,  Features Intersected: E210-W134 & N710-W134,  Facility Carried by Structure: W134-ORANGE GROVE
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 13.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2253K,  Location: 07-LA-134-R13.08-PAS (Lat: 34.147750,  Lng: -118.160264),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 7,690 (year 2015),  Truck Traffic: 5%,  Features Intersected: E210-W134 & N710-W134,  Facility Carried by Structure: W134-ORANGE GROVE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 32.570,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2254,  Location: 07-LA-210-R24.58-PAS (Lat: 34.152075,  Lng: -118.153547),  Route carried "under" structure: State highway 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 8,350 (year 2015),  Truck Traffic: 7%,  Features Intersected: I-210 & I-710 CONN,  Facility Carried by Structure: MAPLE ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 24.860,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 53 2254,  Location: 07-LA-210-R24.58-PAS (Lat: 34.152075,  Lng: -118.153547),  Route carried "under" structure: State highway 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 8,350 (year 2015),  Truck Traffic: 7%,  Features Intersected: I-210 & I-710 CONN,  Facility Carried by Structure: MAPLE ST
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 24.580,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 53 2254,  Location: 07-LA-210-R24.58-PAS (Lat: 34.152075,  Lng: -118.153547),  Route carried "under" structure: State highway 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 8,350 (year 2015),  Truck Traffic: 7%,  Features Intersected: I-210 & I-710 CONN,  Facility Carried by Structure: MAPLE ST
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 24.580,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 53 2254,  Location: 07-LA-210-R24.58-PAS (Lat: 34.152075,  Lng: -118.153547),  Route carried "under" structure: State highway 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 8,350 (year 2015),  Truck Traffic: 7%,  Features Intersected: I-210 & I-710 CONN,  Facility Carried by Structure: MAPLE ST
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 24.860,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 53 2255F,  Location: 07-LA-210-R25.10-PAS (Lat: 34.151392,  Lng: -118.154206),  Route carried "under" structure: Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210 EB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 25.100,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: 53 2257,  Location: 07-LA-710-R32.68-PAS (Lat: 34.148811,  Lng: -118.154386),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 73,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: N710-E210 CONNECTOR RAMP,  Facility Carried by Structure: S. PASADENA AVE
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 32.680,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 53 2258,  Location: 07-LA-710-R32.69-PAS (Lat: 34.149544,  Lng: -118.154444),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 73,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: N710-E210 CONNECTOR RAMP,  Facility Carried by Structure: WALNUT ST
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 32.690,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 2259K,  Location: 07-LA-210-R25.21-PAS (Lat: 34.151506,  Lng: -118.152444),  Route carried "under" structure: Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 295,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: W210-S710 & W210 CONN
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 25.470,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: 53 2259K,  Location: 07-LA-210-R25.21-PAS (Lat: 34.151506,  Lng: -118.152444),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 14,600 (year 2015),  Truck Traffic: 5%,  Features Intersected: W210-S710 & W210 CONN
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 25.250,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: 53 226,  Location: 07-LA-210-R24.94-PAS (Lat: 34.149672,  Lng: -118.157694),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,700 (year 2015),  Truck Traffic: 7%,  Features Intersected: E210-W134 CONNECTOR RAMP,  Facility Carried by Structure: WALNUT ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 24.940,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 53 2262,  Location: 07-LA-710-T32.11-PAS (Lat: 34.140622,  Lng: -118.155575),  Route carried "under" structure: State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 47,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: DEL MAR BLVD
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 32.110,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 2263,  Location: 07-LA-710-R32.37-PAS (Lat: 34.144544,  Lng: -118.155597),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 73,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: GREEN ST
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 32.370,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2263,  Location: 07-LA-710-R32.37-PAS (Lat: 34.144544,  Lng: -118.155597),  Route carried "under" structure: Ramp Interstate 134,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 52,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: GREEN ST
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 13.230,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2263,  Location: 07-LA-710-R32.37-PAS (Lat: 34.144544,  Lng: -118.155597),  Route carried "under" structure: State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 47,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: GREEN ST
Minimum Vertical Clearance: 6.43m (21.10ft),  Kilometerpoint: 32.370,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2264,  Location: 07-LA-710-R32.45-PAS (Lat: 34.145614,  Lng: -118.155747),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 73,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: COLORADO BLVD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 32.450,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 63.1m (207.0ft)

Find on map >>   Show street view

Structure Number: 53 2264,  Location: 07-LA-710-R32.45-PAS (Lat: 34.145614,  Lng: -118.155747),  Route carried "under" structure: State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 66,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: COLORADO BLVD
Minimum Vertical Clearance: 6.38m (20.93ft),  Kilometerpoint: 32.450,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 63.1m (207.0ft)

Find on map >>   Show street view

Structure Number: 53 2264,  Location: 07-LA-710-R32.45-PAS (Lat: 34.145614,  Lng: -118.155747),  Route carried "under" structure: Ramp Interstate 134,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 52,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: COLORADO BLVD
Minimum Vertical Clearance: 7.08m (23.23ft),  Kilometerpoint: 13.230,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 63.1m (207.0ft)

Find on map >>   Show street view

Structure Number: 53 2265,  Location: 07-LA-134-R13.23-PAS (Lat: 34.146789,  Lng: -118.155928),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 225,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: E134-S710 CONNECTOR RAMP,  Facility Carried by Structure: ST JOHN AVENUE
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 13.230,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.6m (103.7ft)

Find on map >>   Show street view

Structure Number: 53 2266G,  Location: 07-LA-710-R32.63-PAS (Lat: 34.147289,  Lng: -118.154558),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 2,200 (year 2009),  Truck Traffic: 1%,  Features Intersected: I 710, CONNS, ST JOHN AV,  Facility Carried by Structure: N710-W134 CONNECTR
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 2266G,  Location: 07-LA-710-R32.63-PAS (Lat: 34.147289,  Lng: -118.154558),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 52,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: I 710, CONNS, ST JOHN AV,  Facility Carried by Structure: N710-W134 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.630,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 2266G,  Location: 07-LA-710-R32.63-PAS (Lat: 34.147289,  Lng: -118.154558),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 73,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: I 710, CONNS, ST JOHN AV
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 32.630,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 2266G,  Location: 07-LA-710-R32.63-PAS (Lat: 34.147289,  Lng: -118.154558),  Route carried "under" structure: State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 66,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: I 710, CONNS, ST JOHN AV
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.630,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 2267,  Location: 07-LA-210-R24.95-PAS (Lat: 34.149611,  Lng: -118.155003),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 15,200 (year 2015),  Truck Traffic: 8%,  Features Intersected: W210&E210-S710,N710-W210,  Facility Carried by Structure: WALNUT STREET
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 24.950,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 53 2267,  Location: 07-LA-210-R24.95-PAS (Lat: 34.149611,  Lng: -118.155003),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2015),  Truck Traffic: 1%,  Features Intersected: W210&E210-S710,N710-W210,  Facility Carried by Structure: WALNUT STREET
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 32.720,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 53 2269S,  Location: 07-LA-134-R13.07-PAS (Lat: 34.147514,  Lng: -118.160653),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 8,950 (year 2015),  Truck Traffic: 2%,  Features Intersected: SR 134 & CONNECTORS,  Facility Carried by Structure: ORANGE GROVE-E134
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.580,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.3m (155.2ft)

Find on map >>   Show street view

Structure Number: 53 2269S,  Location: 07-LA-134-R13.07-PAS (Lat: 34.147514,  Lng: -118.160653),  Route carried "under" structure: Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 2013),  Truck Traffic: 5%,  Features Intersected: SR 134 & CONNECTORS,  Facility Carried by Structure: ORANGE GROVE-E134
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 24.950,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.3m (155.2ft)

Find on map >>   Show street view

Structure Number: 53 2269S,  Location: 07-LA-134-R13.07-PAS (Lat: 34.147514,  Lng: -118.160653),  Route carried "under" structure: State highway 134,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 220,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: SR 134 & CONNECTORS
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 13.070,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.3m (155.2ft)

Find on map >>   Show street view

Structure Number: 53 2272,  Location: 07-LA-210-R25.29-PAS (Lat: 34.152308,  Lng: -118.150669),  Route carried "under" structure: Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: FAIR OAKS AVE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 25.290,  Lanes on structure: 6,  Lanes under structure: 16,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 53 2273,  Location: 07-LA-210-R25.54-PAS (Lat: 34.152383,  Lng: -118.146183),  Route carried "under" structure: Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: MARENGO AVE
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 25.540,  Lanes on structure: 6,  Lanes under structure: 14,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2274,  Location: 07-LA-210-R25.81-PAS (Lat: 34.152311,  Lng: -118.141658),  Route carried "under" structure: Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: LOS ROBLES AVE
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 25.810,  Lanes on structure: 6,  Lanes under structure: 14,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.0m (173.9ft)

Find on map >>   Show street view

Structure Number: 53 2275,  Location: 07-LA-210-R26.07-PAS (Lat: 34.152250,  Lng: -118.137094),  Route carried "under" structure: Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: EL MOLINO AVE
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 26.070,  Lanes on structure: 5,  Lanes under structure: 14,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 62.2m (204.1ft)

Find on map >>   Show street view

Structure Number: 53 2276,  Location: 07-LA-210-R26.33-PAS (Lat: 34.152158,  Lng: -118.132600),  Route carried "under" structure: Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: LAKE AVE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 26.330,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: 53 2277,  Location: 07-LA-210-R26.57-PAS (Lat: 34.152322,  Lng: -118.128281),  Route carried "under" structure: Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: WILSON AVE
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 26.570,  Lanes on structure: 6,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.5m (159.1ft)

Find on map >>   Show street view

Structure Number: 53 2278L,  Location: 07-LA-210-R28.25-PAS (Lat: 34.152614,  Lng: -118.098861),  Route carried "under" structure: City street L519,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 2015),  Truck Traffic: 7%,  Features Intersected: ALTADENA DR,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 53 2278R,  Location: 07-LA-210-R28.25-PAS (Lat: 34.152222,  Lng: -118.098858),  Route carried "under" structure: City street L519,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 22,720 (year 2012),  Truck Traffic: 2%,  Features Intersected: ALTADENA DR,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 53 2279L,  Location: 07-LA-210-R28.46-PAS (Lat: 34.152625,  Lng: -118.095050),  Route carried "under" structure: City street L514,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 2012),  Truck Traffic: 7%,  Features Intersected: SIERRA MADRE BLVD,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 53 2279R,  Location: 07-LA-210-R28.46-PAS (Lat: 34.152294,  Lng: -118.095417),  Route carried "under" structure: City street L514,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 6,160 (year 2012),  Truck Traffic: 2%,  Features Intersected: SIERRA MADRE BLVD,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 53 2280L,  Location: 07-LA-210-R28.73-PAS (Lat: 34.151583,  Lng: -118.090744),  Route carried "under" structure: City street Q295,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 2012),  Truck Traffic: 7%,  Features Intersected: SUNNYSLOPE AVE,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 7.39m (24.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 62.5m (205.1ft)

Find on map >>   Show street view

Structure Number: 53 2280R,  Location: 07-LA-210-R28.73-PAS (Lat: 34.151122,  Lng: -118.090731),  Route carried "under" structure: City street Q295,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 27,200 (year 2012),  Truck Traffic: 2%,  Features Intersected: SUNNYSLOPE AVE,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.9m (203.1ft)

Find on map >>   Show street view

Structure Number: 53 2317,  Location: 07-LA-134-R13.24-PAS (Lat: 34.148808,  Lng: -118.156606),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2012),  Truck Traffic: 3%,  Features Intersected: I-710, STREET & CONN,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 24.900,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2317,  Location: 07-LA-134-R13.24-PAS (Lat: 34.148808,  Lng: -118.156606),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 10,720 (year 2015),  Truck Traffic: 2%,  Features Intersected: I-710, STREET & CONN,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 32.560,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2317,  Location: 07-LA-134-R13.24-PAS (Lat: 34.148808,  Lng: -118.156606),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 6,480 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-710, STREET & CONN,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2317,  Location: 07-LA-134-R13.24-PAS (Lat: 34.148808,  Lng: -118.156606),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 1991),  Truck Traffic: 1%,  Features Intersected: I-710, STREET & CONN,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2317,  Location: 07-LA-134-R13.24-PAS (Lat: 34.148808,  Lng: -118.156606),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 10,500 (year 2013),  Truck Traffic: 2%,  Features Intersected: I-710, STREET & CONN,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 24.950,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2317,  Location: 07-LA-134-R13.24-PAS (Lat: 34.148808,  Lng: -118.156606),  Route carried "under" structure: State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 75,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: I-710, STREET & CONN,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 32.580,  Lanes on structure: 12,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 2013),  Truck Traffic: 5%,  Features Intersected: 210,710,134 & CONN
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 24.980,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 14,100 (year 2013),  Truck Traffic: 5%,  Features Intersected: 210,710,134 & CONN
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 24.940,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 66,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: 210,710,134 & CONN,  Facility Carried by Structure: E134-W210 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.700,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: State highway 134,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 220,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: 210,710,134 & CONN
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 13.250,  Lanes on structure: 2,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2012),  Truck Traffic: 3%,  Features Intersected: 210,710,134 & CONN
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 24.970,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 8,950 (year 2015),  Truck Traffic: 2%,  Features Intersected: 210,710,134 & CONN,  Facility Carried by Structure: E134-W210 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.550,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 2,700 (year 1998),  Truck Traffic: 2%,  Features Intersected: 210,710,134 & CONN,  Facility Carried by Structure: E134-W210 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2318G,  Location: 07-LA-134-R13.25-PAS (Lat: 34.148253,  Lng: -118.156567),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 1998),  Truck Traffic: 3%,  Features Intersected: 210,710,134 & CONN,  Facility Carried by Structure: E134-W210 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 53 2323S,  Location: 07-LA-210-R25.12-PAS (Lat: 34.150311,  Lng: -118.153767),  Route carried "under" structure: Interstate 210,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 295,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: N710-E210 CONNECTOR,  Facility Carried by Structure: E134-FAIR OAKS AVE
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 25.150,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.0m (173.9ft)

Find on map >>   Show street view

Structure Number: 53 2392,  Location: 07-LA-210-R25.97-PAS (Lat: 34.152172,  Lng: -118.138547),  Route carried "under" structure: Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: ROUTE 210,  Facility Carried by Structure: MADISON AVE UTL OC
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 25.970,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 53 2398S,  Location: 07-LA-210-R29.35-PAS (Lat: 34.147364,  Lng: -118.082200),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 4,850 (year 2012),  Truck Traffic: 3%,  Features Intersected: SIERRA MADRE & E210 ONRP
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 29.350,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 2398S,  Location: 07-LA-210-R29.35-PAS (Lat: 34.147364,  Lng: -118.082200),  Route carried "under" structure: City street ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2012),  Truck Traffic: 3%,  Features Intersected: SIERRA MADRE & E210 ONRP,  Facility Carried by Structure: E210-ROSEMEAD OFF
Minimum Vertical Clearance: 6.42m (21.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 2431Y,  Location: 07-LA-134-R13.22-PAS (Lat: 34.147186,  Lng: -118.156308),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,100 (year 2014),  Truck Traffic: 6%,  Features Intersected: EB 134-SB 710 CONNECTOR,  Facility Carried by Structure: DYNA-METRIC DRWY
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 13.220,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 53 2537,  Location: 07-LA-710-R32.51-PAS (Lat: 34.146578,  Lng: -118.155842),  Route carried "under" structure: State highway 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 66,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: UNION STREET
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.510,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 53 2537,  Location: 07-LA-710-R32.51-PAS (Lat: 34.146578,  Lng: -118.155842),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 33,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: UNION STREET
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 32.510,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 53 2537,  Location: 07-LA-710-R32.51-PAS (Lat: 34.146578,  Lng: -118.155842),  Route carried "under" structure: Ramp Interstate 134,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 32,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: UNION STREET
Minimum Vertical Clearance: 7.10m (23.29ft),  Kilometerpoint: 13.230,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 53 2782,  Location: 07-LA-210-R25.30-PAS (Lat: 34.151708,  Lng: -118.150364),  Route carried "under" structure: Ramp State highway 210,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2015),  Truck Traffic: 3%,  Features Intersected: I 210 MEDIAN
Minimum Vertical Clearance: 3.50m (11.48ft),  Kilometerpoint: 25.300,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 296,  Location: 07-LA-210-R29.35 (Lat: 34.148389,  Lng: -118.081464),  Route carried "under" structure: Interstate 210,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 294,000 (year 2012),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: PEDESTRIANS
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 29.350,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 53C0107,  Location: 0.5MI E/O SAN RAFAEL AVE (Lat: 34.144525,  Lng: -118.167442),  Route carried "under" structure: City street _,  Year Built: 1913,  Structure Length: 0. m,  Average Daily Traffic: 2,900 (year 2014),  Truck Traffic: 2%,  Features Intersected: ARROYO BLVD / ARROYO S,  Facility Carried by Structure: COLORADO BLVD
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 67.9m (222.8ft)

Find on map >>   Show street view

Structure Number: 53C0264,  Location: 0.4MI S/O LINCOLN BLVD (Lat: 34.158261,  Lng: -118.161814),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 5,126 (year 2010),  Truck Traffic: 1%,  Features Intersected: SECO ST,  Facility Carried by Structure: PROSPECT BLVD
Minimum Vertical Clearance: 12.80m (41.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 53C0314,  Location: 300FT N/O COLORADO BLVD (Lat: 34.147658,  Lng: -118.082275),  Route carried "under" structure: City street L522,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 4,434 (year 2012),  Truck Traffic: 4%,  Features Intersected: SIERRA MADRE VILLA AV,  Facility Carried by Structure: MTA
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 53C0359,  Location: 0.2MI N/O WALNUT AVE (Lat: 34.152242,  Lng: -118.121708),  Route carried "under" structure: City street Q309,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 26,463 (year 2012),  Truck Traffic: 4%,  Features Intersected: HILL AVE,  Facility Carried by Structure: METRO
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.0m (78.7ft)

Find on map >>   Show street view

Structure Number: 53C036,  Location: 0.2MI N/O WALNUT AVE (Lat: 34.152314,  Lng: -118.117611),  Route carried "under" structure: City street Q310,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 785 (year 2012),  Truck Traffic: 2%,  Features Intersected: SIERRA BONITA AVE,  Facility Carried by Structure: METRO
Minimum Vertical Clearance: 6.20m (20.34ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.8m (74.8ft)

Discuss Pasadena, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.