Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Plano, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 326Number of bridges
  • 6,532ft / 1,991mTotal length
  • $1,545,000Total costs
  • 10,778,666Total average daily traffic
  • 502,222Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Plano
  • No street view available for this location

New bridges in Plano, TX - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 31960-1969
  • 391970-1979
  • 731980-1989
  • 991990-1999
  • 682000-2009
  • 352010-2019
  • 42020-2022
Reconstructed bridges in Plano, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 171990-1999
  • 42000-2009
  • 112010-2019
  • 102020-2022
Average Bridge Daily Traffic in Plano, TX
Average Bridge Truck Traffic in Plano, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.7%Very good
  • 73.4%Good
  • 15.6%Satisfactory
  • 1.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 36.4%Very good
  • 51.9%Good
  • 11.0%Satisfactory
  • 0.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.6%Very good
  • 64.9%Good
  • 34.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.7%Very good
  • 40.3%Good
  • 44.2%Satisfactory
  • 5.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.9%Good
  • 37.3%Satisfactory
  • 1.8%Fair
  • 0.9%Poor
Find on map >>   Show street view

Structure Number: 180430C01040005,  Location: 0.65 MI N OF PARKER BLVD (Lat: 33.054375,  Lng: -96.829714),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 13,933 (year 2015),  Features Intersected: WINDHAVEN PARKWAY,  Facility Carried by Structure: DALLAS N TOLLWAY
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 1.062,  Lanes on structure: 9,  Lanes under structure: 12,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 180430C01040006,  Location: 1.55 MI N OF PARKER BLVD (Lat: 33.064928,  Lng: -96.824661),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 14,252 (year 2015),  Truck Traffic: 3%,  Features Intersected: W SPRING CREEK PKWY,  Facility Carried by Structure: DALLAS N TOLLWAY
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.002,  Lanes on structure: 8,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 180430C0104001,  Location: 1.2 MI N OF W PARK BLVD (Lat: 33.044814,  Lng: -96.829486),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 29,712 (year 2015),  Truck Traffic: 3%,  Features Intersected: W PARKER RD,  Facility Carried by Structure: DALLAS N TOLLWAY
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 1.255,  Lanes on structure: 8,  Lanes under structure: 12,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 180430C01040011,  Location: 1.2 MI S OF W PARKER RD (Lat: 33.027536,  Lng: -96.829200),  Route carried "under" structure: City street 544,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 33,244 (year 2015),  Truck Traffic: 3%,  Features Intersected: W PARK BLVD,  Facility Carried by Structure: DALLAS N TOLLWAY
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 1.384,  Lanes on structure: 9,  Lanes under structure: 11,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 180430C01040012,  Location: 0.85 MI S OF SH 121 (Lat: 33.077822,  Lng: -96.824794),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2011),  Truck Traffic: 10%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: LEGACY DR EB
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 7.242,  Lanes on structure: 5,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 180430C01040013,  Location: 0.85 MI S OF SH 121 (Lat: 33.078100,  Lng: -96.824794),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2011),  Truck Traffic: 10%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: LEGACY DR WB
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 7.258,  Lanes on structure: 5,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 180430C01040014,  Location: 0.25 MI N OF PGBT (Lat: 33.016481,  Lng: -96.829044),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 106,835 (year 2017),  Truck Traffic: 3%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: EB PLANO PKWY
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.002,  Lanes on structure: 6,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 180430C01040018,  Location: 0.5 MI S OF SH 121 (Lat: 33.084369,  Lng: -96.823692),  Route carried "under" structure: Other road ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: HEADQUARTERS (WB)
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.805,  Lanes on structure: 6,  Lanes under structure: 9,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180430C01040019,  Location: 0.5 MI S OF SH 121 (Lat: 33.084014,  Lng: -96.824303),  Route carried "under" structure: Other road ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: HEADQUARTERS (EB)
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.805,  Lanes on structure: 6,  Lanes under structure: 9,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180430C0104002,  Location: 0.5 Mi N of PGB Turnpike (Lat: 33.020458,  Lng: -96.829642),  Route carried "under" structure: Ramp Other road ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 15,191 (year 2017),  Features Intersected: DNT ENTRANCE RAMP,  Facility Carried by Structure: DNT Entrance Ramp
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 180430C01040021,  Location: 0.4 Mi N of PGB Turnpike (Lat: 33.019775,  Lng: -96.828972),  Route carried "under" structure: Ramp Other road ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 26,483 (year 2017),  Features Intersected: DNT NB EXIT RAMP,  Facility Carried by Structure: DNT NB Exit Ramp
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 180430C01040022,  Location: 1.3 MI S OF SH 121 (Lat: 33.072164,  Lng: -96.824706),  Route carried "under" structure: Other road ,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2011),  Truck Traffic: 10%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: TENNYSON PKWY WB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 6.582,  Lanes on structure: 10,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 180430C01040023,  Location: 1.3 mi S of SH 121 (Lat: 33.071903,  Lng: -96.824717),  Route carried "under" structure: Other road ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2018),  Truck Traffic: 5%,  Features Intersected: Dallas North Tollway,  Facility Carried by Structure: Tennyson Pkwy EB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 6.582,  Lanes on structure: 10,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 180430C01040024,  Location: 0.90 MI S OF SRT (Lat: 33.078261,  Lng: -96.824506),  Route carried "under" structure: Other road ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 106,835 (year 2017),  Truck Traffic: 3%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: LEGACY DR NORTH TA
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 10,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 180430C01040025,  Location: 0.25 MI N OF PGBT (Lat: 33.016458,  Lng: -96.828869),  Route carried "under" structure: Other road ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 22,723 (year 2017),  Truck Traffic: 3%,  Features Intersected: DALLAS NORTH TOLLWAY,  Facility Carried by Structure: WB PLANO PKWY
Minimum Vertical Clearance: 5.13m (16.83ft),  Lanes on structure: 6,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Discuss Plano, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.