Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Nashville-Davidson, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,275Number of bridges
  • 15,341ft / 4,676mTotal length
  • $710,240,000Total costs
  • 51,390,975Total average daily traffic
  • 6,660,324Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Nashville-Davidson
  • No street view available for this location

New bridges in Nashville-Davidson, TN - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 41900-1909
  • 91910-1919
  • 491920-1929
  • 271930-1939
  • 411940-1949
  • 1031950-1959
  • 3411960-1969
  • 1811970-1979
  • 2261980-1989
  • 1061990-1999
  • 1482000-2009
  • 382010-2019
  • 12020-2022
Reconstructed bridges in Nashville-Davidson, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51940-1949
  • 61950-1959
  • 131960-1969
  • 71970-1979
  • 371980-1989
  • 331990-1999
  • 272000-2009
  • 42010-2019
  • 42020-2022
Average Bridge Truck Traffic in Nashville-Davidson, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.6%Very good
  • 45.7%Good
  • 29.1%Satisfactory
  • 14.6%Fair
  • 1.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.5%Very good
  • 54.5%Good
  • 21.9%Satisfactory
  • 12.2%Fair
  • 2.7%Poor
  • 0.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.4%Very good
  • 60.2%Good
  • 17.4%Satisfactory
  • 11.8%Fair
  • 3.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Very good
  • 34.2%Good
  • 47.1%Satisfactory
  • 13.4%Fair
  • 0.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 1.9%Very good
  • 63.9%Good
  • 24.2%Satisfactory
  • 8.1%Fair
  • 1.9%Poor
Find on map >>   Show street view

Structure Number: 19I00400165,  Location: ROBERTSON RD. I/C (Lat: 36.151467,  Lng: -86.858800),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 2010,  Status: Open,  Structure Length: 46.33m (152.00ft),  Average Daily Traffic: 104,620 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 167,392 (year 2042),  Design Load: HL 93,  Features Intersected: I-40-EB-RP-B / 6 ROUTES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.101,  Lanes on structure: 2,  Lanes under structure: 27,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 40,  Length of Maximum Span: 67.0m (219.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400166,  Location: ROBERTSON RD. I/C (Lat: 36.156842,  Lng: -86.859131),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 2002,  Status: Open,  Structure Length: 158.50m (520.01ft),  Average Daily Traffic: 104,620 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 167,392 (year 2042),  Design Load: HS 20,  Features Intersected: I-40 RP/ 5 ROUTES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.181,  Lanes on structure: 2,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 40,  Length of Maximum Span: 41.4m (135.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $50,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400301,  Location: I40-I440 INTERCHANGE (Lat: 36.156703,  Lng: -86.825147),  Route carried "on" structure: Ramp Interstate 440,  Year Built: 1986,  Status: Open,  Structure Length: 13.41m (44.00ft),  Average Daily Traffic: 75,489 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 42,416 (year 2040),  Design Load: HS 20,  Features Intersected: I440-RMP-NW-STR#4/I40E&W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 49.4m (162.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Critical Feature Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400303,  Location: I40-I440 INTERCHANGE (Lat: 36.155569,  Lng: -86.823064),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1985,  Status: Open,  Structure Length: 11.34m (37.20ft),  Average Daily Traffic: 113,117 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 180,987 (year 2042),  Design Load: HS 20,  Features Intersected: I-40W RAMP / I-440W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.175,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.34m (37.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $3,129,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $4,694,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400305,  Location: IN WEST NASHVILLE (Lat: 36.157203,  Lng: -86.823161),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1985,  Status: Open,  Structure Length: 10.61m (34.81ft),  Average Daily Traffic: 113,117 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 180,987 (year 2042),  Design Load: HS 20,  Features Intersected: I-40W RAMP / I-40E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.239,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 59.4m (194.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400309,  Location: I24-I40 INTERCHANGE - C7 (Lat: 36.139739,  Lng: -86.726589),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 2003,  Status: Open,  Structure Length: 3.97m (13.02ft),  Average Daily Traffic: 141,389 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 226,222 (year 2042),  Design Load: HS 20,  Features Intersected: I40 RAMP STR 5A / I40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.826,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400311,  Location: IN SOUTH NASHVILLE (Lat: 36.150986,  Lng: -86.769169),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1968,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 125,059 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 200,094 (year 2042),  Design Load: HS 20,  Features Intersected: STR 84B I40 EXIT RMP/SR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.465,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,276,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,915,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400312,  Location: SOUTH NASHVILLE (Lat: 36.151261,  Lng: -86.769831),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1968,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 125,059 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 200,094 (year 2042),  Design Load: HS 20,  Features Intersected: STR 84A I40 EXIT RMP/SR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.433,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,238,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,858,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400313,  Location: I65-I40 INTERCHANGE (Lat: 36.154650,  Lng: -86.761703),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1960,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 78,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 126,080 (year 2042),  Design Load: HS 20,  Features Intersected: I40 RMP/I40 RMP & SR 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.254,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.8m (137.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.07m (39.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,831,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $4,247,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400317,  Location: 8TH AVE.SOUTH (Lat: 36.148097,  Lng: -86.779197),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1970,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 110,974 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 177,558 (year 2042),  Design Load: HS 20,  Features Intersected: I40 RMP / 8TH AVE SR 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.515,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.79m (15.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $982,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400325,  Location: I40 RMP &26&27 AVE (Lat: 36.166361,  Lng: -86.817744),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1967,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 113,117 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 180,987 (year 2042),  Design Load: HS 20,  Features Intersected: I40 RMP JB / RMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.398,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.42m (34.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,544,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $2,317,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19I00400327,  Location: I40 RMP&CHURCH&BROAD (Lat: 36.156694,  Lng: -86.790264),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1968,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 84,715 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 135,544 (year 2042),  Design Load: HS 20,  Features Intersected: I40 RMP B2 / RMP CH 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.099,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 7 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400328,  Location: I40 RMP&CHURCH&BROAD (Lat: 36.157742,  Lng: -86.790131),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1968,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 84,715 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 135,544 (year 2042),  Design Load: HS 20,  Features Intersected: I40 RMP CH 3 / RMP B1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.067,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400329,  Location: IN NASHVILLE @ AIRPORT (Lat: 36.141581,  Lng: -86.673456),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 1988,  Status: Open,  Structure Length: 14.33m (47.01ft),  Average Daily Traffic: 153,002 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 244,803 (year 2042),  Design Load: HS 20,  Features Intersected: AIRPORT-RAMP A / I40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.703,  Lanes on structure: 1,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 71.6m (234.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400331,  Location: SR155&I40 I/C (Lat: 36.144428,  Lng: -86.692231),  Route carried "on" structure: Ramp Interstate 40,  Year Built: 2008,  Status: Open,  Structure Length: 27.68m (90.81ft),  Average Daily Traffic: 153,002 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 244,803 (year 2042),  Design Load: HL 93,  Features Intersected: BR3-I40 WB RMP B / 2 RTS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.755,  Lanes on structure: 1,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 64.7m (212.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400333,  Location: BRILEY PARKWAY / I40 (Lat: 36.143861,  Lng: -86.699558),  Route carried "on" structure: State highway 155,  Year Built: 2008,  Status: Open,  Structure Length: 15.54m (50.98ft),  Average Daily Traffic: 53,624 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 85,798 (year 2042),  Design Load: HL 93,  Features Intersected: BR4-SR155-RP-D/2 RTS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.010,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00400335,  Location: I40 / CSX RR (Lat: 36.165728,  Lng: -86.794739),  Route carried "on" structure: Interstate 40,  Year Built: 2015,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 140,162 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 224,259 (year 2042),  Design Load: HL 93,  Features Intersected: I40 / CSX R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.973,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 40.8m (133.9ft),  Out-to-Out Width: 41.1m (134.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00400337,  Location: I40 / CLINTON ST (Lat: 36.165158,  Lng: -86.794417),  Route carried "on" structure: Interstate 40,  Year Built: 2015,  Status: Open,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 140,162 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 224,259 (year 2042),  Design Load: HL 93,  Features Intersected: I40 / CLINTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.053,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.9m (137.5ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 41.9m (137.5ft),  Out-to-Out Width: 42.3m (138.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00650001,  Location: IN BRENTWOOD (Lat: 36.039247,  Lng: -86.782406),  Route carried "on" structure: State highway 254,  Year Built: 1989,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 51,229 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 81,966 (year 2042),  Design Load: HS 20,  Features Intersected: OLD HICKORY BLVD / I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.829,  Lanes on structure: 8,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.4m (103.0ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 31.4m (103.0ft),  Out-to-Out Width: 34.7m (113.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650003,  Location: .2 M N WILLAMS0N CO LN (Lat: 36.041831,  Lng: -86.782111),  Route carried "on" structure: Interstate 65,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 94,378 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 151,005 (year 2042),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 15 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.42m (30.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,101,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $4,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650004,  Location: .2 M N WILLIAMSON CO LN (Lat: 36.041628,  Lng: -86.782428),  Route carried "on" structure: Interstate 65,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 94,378 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 151,005 (year 2042),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 15 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.42m (30.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,793,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $5,690,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650005,  Location: I65/HOGAN RD (Lat: 36.066006,  Lng: -86.770819),  Route carried "on" structure: Interstate 65,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 94,378 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 151,005 (year 2042),  Design Load: HS 20,  Features Intersected: I65 / HOGAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.734,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.3m (142.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 43.3m (142.1ft),  Out-to-Out Width: 43.9m (144.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650007,  Location: I65/FARRELL RD (Lat: 36.074414,  Lng: -86.768597),  Route carried "on" structure: Interstate 65,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 94,378 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 151,005 (year 2042),  Design Load: HS 20,  Features Intersected: I65 RL / FARRELL PKWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.683,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650008,  Location: I65/FARRELL RD (Lat: 36.074486,  Lng: -86.768817),  Route carried "on" structure: Interstate 65,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 94,378 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 151,005 (year 2042),  Design Load: HS 20,  Features Intersected: I65 LL / FARRELL PKWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.683,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650009,  Location: HARDING PLACE/I65 (Lat: 36.082556,  Lng: -86.764211),  Route carried "on" structure: State highway 255,  Year Built: 2000,  Status: Open,  Structure Length: 11.37m (37.30ft),  Average Daily Traffic: 32,526 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 52,042 (year 2042),  Design Load: HS 20,  Features Intersected: HARDING PLACE / I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 8,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 58.6m (192.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 37.2m (122.0ft),  Out-to-Out Width: 37.8m (124.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00650011,  Location: THOMPSON LN/I65&SS RR (Lat: 36.110731,  Lng: -86.771403),  Route carried "on" structure: State highway 155,  Year Built: 1971,  Status: Open,  Structure Length: 15.54m (50.98ft),  Average Daily Traffic: 27,279 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 43,646 (year 2042),  Design Load: HS 20,  Features Intersected: THOMPSON LN / I65 &CSX R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 32.3m (106.0ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19I00650025,  Location: 1.0 M N SR155&I65 (Lat: 36.121856,  Lng: -86.773064),  Route carried "on" structure: Interstate 65,  Year Built: 1969,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 117,786 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 188,458 (year 2042),  Design Load: HS 20,  Features Intersected: BROWN'S CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.219,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $997,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19I00650027,  Location: I65/CRAIGHEAD AVE (Lat: 36.126433,  Lng: -86.772433),  Route carried "on" structure: Interstate 65,  Year Built: 1970,  Year Reconstructed: 1982,  Status: Posted for load,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 117,786 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 188,458 (year 2041),  Design Load: HS 20,  Features Intersected: I-65 / CRAIGHEAD AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.783,  Lanes on structure: 8,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 41.5m (136.2ft),  Out-to-Out Width: 42.1m (138.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,900,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $4,351,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650029,  Location: I65/WEDEWOOD AVE (Lat: 36.134156,  Lng: -86.775328),  Route carried "on" structure: Interstate 65,  Year Built: 1970,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 117,786 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 207,328 (year 2040),  Design Load: HS 20,  Features Intersected: I65 / WEDGEWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.700,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 34.1m (111.9ft),  Out-to-Out Width: 34.7m (113.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00650031,  Location: HAMILTON AVE@ RIDLEY BLVD (Lat: 36.139136,  Lng: -86.775825),  Route carried "on" structure: City street 416,  Year Built: 1966,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 3,570 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,712 (year 2042),  Design Load: H 20,  Features Intersected: HAMILTON AVENUE / I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.038,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $681,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,022,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19I00650033,  Location: CHESTNUT AVE @ 8TH AVE. S (Lat: 36.141872,  Lng: -86.776961),  Route carried "on" structure: City street 4911,  Year Built: 1970,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 6,450 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,320 (year 2042),  Design Load: HS 20,  Features Intersected: CHESTNUT STREET / I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.52m (18.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,160,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19I00650059,  Location: IN NASHVILLE (Lat: 36.195531,  Lng: -86.775461),  Route carried "on" structure: City street 3267,  Year Built: 1965,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 6,899 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,038 (year 2042),  Design Load: HS 20,  Features Intersected: FERN AVE RL / I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I0065006,  Location: IN NASHVILLE (Lat: 36.195589,  Lng: -86.792703),  Route carried "on" structure: City street 3267,  Year Built: 1965,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 6,899 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,038 (year 2042),  Design Load: HS 20,  Features Intersected: FERN AVE LL / I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650061,  Location: .1 M S TRINITY LANE (Lat: 36.202686,  Lng: -86.776561),  Route carried "on" structure: Interstate 65,  Year Built: 1961,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 168,680 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 269,888 (year 2042),  Design Load: HS 20,  Features Intersected: PAGES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.395,  Lanes on structure: 6,  Base Highway Network: Yes (Inventory Route: 19I00650,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $686,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,030,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19I00650063,  Location: I65/TRINITY LANE (Lat: 36.206269,  Lng: -86.776239),  Route carried "on" structure: Interstate 65,  Year Built: 1961,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 168,680 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 269,888 (year 2042),  Design Load: HS 20,  Features Intersected: I65 / TRINITY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.829,  Lanes on structure: 10,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 19I00650,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 50.6m (166.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 50.6m (166.0ft),  Out-to-Out Width: 51.2m (168.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $4,007,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $6,011,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650067,  Location: I65/EWING DR (Lat: 36.230108,  Lng: -86.771178),  Route carried "on" structure: Interstate 65,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 92,300 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 147,680 (year 2042),  Design Load: HS 20,  Features Intersected: I65 / EWING DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.501,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 19I00650,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 34 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 33.4m (109.6ft),  Out-to-Out Width: 34.0m (111.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19I00650068,  Location: I65/EWING DR (Lat: 36.230039,  Lng: -86.779528),  Route carried "on" structure: Interstate 65,  Year Built: 2015,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 92,300 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 147,680 (year 2042),  Design Load: HL 93,  Features Intersected: I65 / EWING DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.501,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 19I00650,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 4.3m (14.1ft),  Right: 4.9m (16.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Nashville-Davidson, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.