Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Evergreen, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 587ft / 179mTotal length
  • $66,263,000Total costs
  • 344,954Total average daily traffic
  • 86,822Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Evergreen
  • No street view available for this location

New bridges in Evergreen, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21930-1939
  • 21940-1949
  • 101950-1959
  • 161960-1969
  • 31980-1989
  • 61990-1999
  • 62000-2009
  • 22020-2022
Reconstructed bridges in Evergreen, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Evergreen, AL
Average Bridge Truck Traffic in Evergreen, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 38.5%Good
  • 11.5%Satisfactory
  • 38.5%Fair
  • 3.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 34.6%Good
  • 19.2%Satisfactory
  • 26.9%Fair
  • 3.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 34.6%Good
  • 38.5%Satisfactory
  • 7.7%Fair
  • 3.8%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.3%Very good
  • 30.0%Good
  • 26.7%Satisfactory
  • 20.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 41.7%Fair
Find on map >>   Show street view

Structure Number: 6802,  Location: 2 MI N JCT US 84 (Lat: 31.440708,  Lng: -86.980958),  Route carried "under" structure: County highway 20,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 740 (year 2019),  Truck Traffic: 8%,  Features Intersected: CO RD 20,  Facility Carried by Structure: I-65 NB
Minimum Vertical Clearance: 5.75m (18.86ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 6803,  Location: 0.7 MI N SR 83 (Lat: 31.465264,  Lng: -86.959475),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 27,187 (year 2019),  Truck Traffic: 28%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 30
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 156.343,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 6804,  Location: 3.3 MI N SR 83 (Lat: 31.495794,  Lng: -86.933592),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 27,187 (year 2019),  Truck Traffic: 28%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 22
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 160.539,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 6805,  Location: 4.2 MI N SR 83 (Lat: 31.506350,  Lng: -86.923203),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 27,187 (year 2019),  Truck Traffic: 28%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 29
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 162.024,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 7105,  Location: JCT I-65 * SR 83 (Lat: 31.457239,  Lng: -86.965092),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 27,350 (year 2019),  Truck Traffic: 28%,  Features Intersected: I-65,  Facility Carried by Structure: SR 83
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 155.297,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Discuss Evergreen, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.