Bridge Statistics for Evergreen, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 587ft / 179mTotal length
  • $66,263,000Total costs
  • 344,954Total average daily traffic
  • 86,822Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Evergreen
  • No street view available for this location

New bridges in Evergreen, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21930-1939
  • 21940-1949
  • 101950-1959
  • 161960-1969
  • 31980-1989
  • 61990-1999
  • 62000-2009
  • 22020-2022
Reconstructed bridges in Evergreen, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Evergreen, AL
Average Bridge Truck Traffic in Evergreen, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 38.5%Good
  • 11.5%Satisfactory
  • 38.5%Fair
  • 3.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 34.6%Good
  • 19.2%Satisfactory
  • 26.9%Fair
  • 3.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 34.6%Good
  • 38.5%Satisfactory
  • 7.7%Fair
  • 3.8%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.3%Very good
  • 30.0%Good
  • 26.7%Satisfactory
  • 20.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 41.7%Fair
Find on map >>   Show street view

Structure Number: 3031,  Location: 2.8 MI W OF I-65 (Lat: 31.421778,  Lng: -87.050611),  Route carried "on" structure: US 84,  Year Built: 1947,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,499 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,249 (year 2039),  Design Load: H 15,  Features Intersected: HUNTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 153.818,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $400,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3067,  Location: 1.5 MI SOUTH EVERG (Lat: 31.410681,  Lng: -86.954983),  Route carried "on" structure: County highway 29,  Year Built: 1947,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 750 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,363 (year 2034),  Design Load: H 10,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 1 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $262,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4539,  Location: 0.5 MI N SR 84 S JCT (Lat: 31.416889,  Lng: -86.988992),  Route carried "on" structure: US 31,  Year Built: 1953,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 6,288 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,432 (year 2039),  Design Load: HS 20,  Features Intersected: MURDER CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.186,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,874,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,061,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 454,  Location: 0.5 MI N SR 84 JCT (Lat: 31.417608,  Lng: -86.987344),  Route carried "on" structure: US 31,  Year Built: 1953,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 6,288 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,432 (year 2039),  Design Load: HS 20,  Features Intersected: MURDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.363,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.28m (46.85ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $3,232,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,555,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5452,  Location: 5MI N.W EVERGREEN (Lat: 31.491222,  Lng: -87.021072),  Route carried "on" structure: County highway 4,  Year Built: 1956,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 10%,  Average Future Daily Traffic: 261 (year 2035),  Design Load: H 10,  Features Intersected: MURDER CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5877,  Location: 3 MI WEST OWASSA (Lat: 31.499944,  Lng: -86.960311),  Route carried "on" structure: County highway 22,  Year Built: 1957,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 328 (year 1995),  Truck Traffic: 13%,  Average Future Daily Traffic: 568 (year 2035),  Design Load: H 15,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $496,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6467,  Location: 3.5 MI S JCT US 84 (Lat: 31.378258,  Lng: -87.043300),  Route carried "on" structure: County highway 65,  Year Built: 1959,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 75 (year 2039),  Design Load: H 20,  Features Intersected: I-65,  Facility Carried by Structure: PATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,730,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,903,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6468,  Location: 2.3 MI S JCT US 84 (Lat: 31.391886,  Lng: -87.029803),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 26,152 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 39,228 (year 2039),  Design Load: HS 20,  Features Intersected: AUTRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.774,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.3m (76.4ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,367,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,504,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6474,  Location: 0.9 MI N JCT US 84 (Lat: 31.435897,  Lng: -86.986878),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 27,350 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 41,025 (year 2039),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.956,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.7m (77.8ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,346,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6564,  Location: EVERGREEN (Lat: 31.418956,  Lng: -87.006656),  Route carried "on" structure: US 84,  Year Built: 1959,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 5,476 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,214 (year 2039),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.081,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,618,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $2,880,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6801,  Location: 2 MI N JCT US 84 (Lat: 31.440706,  Lng: -86.981294),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 13,076 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 19,614 (year 2039),  Design Load: HS 20,  Features Intersected: CO RD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 152.944,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.92m (22.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,183,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,401,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Membrane: Built-up,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 6802,  Location: 2 MI N JCT US 84 (Lat: 31.440708,  Lng: -86.980958),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 13,076 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 19,614 (year 2039),  Design Load: HS 20,  Features Intersected: CO RD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 152.944,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.92m (22.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,183,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,401,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Membrane: Built-up,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 6803,  Location: 0.7 MI N SR 83 (Lat: 31.465264,  Lng: -86.959475),  Route carried "on" structure: County highway 30,  Year Built: 1960,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 320 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 480 (year 2039),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,812,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,993,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6804,  Location: 3.3 MI N SR 83 (Lat: 31.495794,  Lng: -86.933592),  Route carried "on" structure: County highway 22,  Year Built: 1960,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 330 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 495 (year 2039),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,812,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,993,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6805,  Location: 4.2 MI N SR 83 (Lat: 31.506350,  Lng: -86.923203),  Route carried "on" structure: County highway 29,  Year Built: 1960,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 861 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,292 (year 2039),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 37.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.67m (31.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,188,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,407,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6917,  Location: 0.2 MI N CO RD 77 (Lat: 31.436831,  Lng: -86.915972),  Route carried "on" structure: US 31,  Year Built: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,271 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,825 (year 2039),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 157.967,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7105,  Location: JCT I-65 * SR 83 (Lat: 31.457239,  Lng: -86.965092),  Route carried "on" structure: State highway 83,  Year Built: 1960,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 6,882 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,323 (year 2039),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.323,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,930,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7324,  Location: 5MI N.W EVERGREEN (Lat: 31.491078,  Lng: -87.019872),  Route carried "on" structure: County highway 4,  Year Built: 1961,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 10%,  Average Future Daily Traffic: 259 (year 2034),  Design Load: H 15,  Features Intersected: MURDER CREEK MC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 934,  Location: 2MI WEST EVERGREEN (Lat: 31.446272,  Lng: -87.022017),  Route carried "on" structure: County highway 20,  Year Built: 1967,  Status: Posted for load,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 450 (year 1995),  Truck Traffic: 12%,  Average Future Daily Traffic: 819 (year 2034),  Design Load: H 15,  Features Intersected: MURDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $2,242,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,466,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10018,  Location: 5 MI S. EVERGREEN (Lat: 31.373650,  Lng: -86.978756),  Route carried "on" structure: County highway 25,  Year Built: 1969,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 361 (year 1995),  Truck Traffic: 10%,  Average Future Daily Traffic: 597 (year 2035),  Design Load: HS 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $381,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13077,  Location: .5MI WEST OF I 65 (Lat: 31.440758,  Lng: -86.985822),  Route carried "on" structure: County highway 20,  Year Built: 1900,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 460 (year 1995),  Truck Traffic: 12%,  Average Future Daily Traffic: 776 (year 2034),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $316,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13229,  Location: 2.3 MI S SR 84 (Lat: 31.387722,  Lng: -87.018528),  Route carried "on" structure: US 31,  Year Built: 1984,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,825 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,738 (year 2039),  Design Load: HS 20,  Features Intersected: AUTREY CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.831,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 87.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1323,  Location: 2.3 MI S SR 84 (Lat: 31.387192,  Lng: -87.018986),  Route carried "on" structure: US 31,  Year Built: 1984,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,825 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,738 (year 2039),  Design Load: HS 20,  Features Intersected: AUTREY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.757,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 145,  Location: 0.5 MI N CO RD 77 (Lat: 31.437958,  Lng: -86.911183),  Route carried "on" structure: US 31,  Year Built: 1988,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 3,271 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,907 (year 2039),  Design Load: HS 20,  Features Intersected: JAY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.445,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,230,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,353,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16458,  Location: 1.5 MI NW I-65 (Lat: 31.465164,  Lng: -86.991581),  Route carried "on" structure: State highway 83,  Year Built: 1996,  Status: Open,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 1,867 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,798 (year 2039),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.041,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.10m (39.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,484,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $3,832,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1658,  Location: SEC 24 T5N R11E (Lat: 31.402914,  Lng: -86.907347),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 50 (year 1995),  Average Future Daily Traffic: 86 (year 2034),  Features Intersected: CREEK,  Facility Carried by Structure: HUGH HAGOOD DT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $240,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 16931,  Location: 0.9 MI NW I-65 (Lat: 31.460981,  Lng: -86.978183),  Route carried "on" structure: State highway 83,  Year Built: 1998,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,867 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,800 (year 2039),  Design Load: HS 20,  Features Intersected: COWART'S BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.656,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $571,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16973,  Location: 1MI E EVERGREEN (Lat: 31.424928,  Lng: -86.934147),  Route carried "on" structure: County highway 42,  Year Built: 1996,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 690 (year 2001),  Truck Traffic: 15%,  Average Future Daily Traffic: 798 (year 2034),  Design Load: HS 20,  Features Intersected: UNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.9m (32.5ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.82m (9.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $660,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16974,  Location: 1.5MI S EVERGREEN (Lat: 31.408922,  Lng: -86.955047),  Route carried "on" structure: County highway 29,  Year Built: 1998,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 120 (year 2000),  Truck Traffic: 5%,  Average Future Daily Traffic: 174 (year 2034),  Design Load: HS 20,  Features Intersected: MILL CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $836,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16975,  Location: 2MI S EVERGREEN (Lat: 31.405019,  Lng: -86.955519),  Route carried "on" structure: County highway 29,  Year Built: 1998,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 100 (year 2000),  Average Future Daily Traffic: 184 (year 2034),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,493,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18241,  Location: 3 MI. N.W. OF EVERGREEN (Lat: 31.478928,  Lng: -86.975711),  Route carried "on" structure: County highway 30,  Year Built: 2003,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 612 (year 1995),  Truck Traffic: 8%,  Average Future Daily Traffic: 782 (year 2033),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.5m (34.4ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,087,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,196,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18242,  Location: 6 MI S E. OF EVERGREEN (Lat: 31.367744,  Lng: -86.932303),  Route carried "on" structure: County highway 29,  Year Built: 2002,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 450 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 520 (year 2035),  Design Load: HS 20,  Features Intersected: TRIBUTARY TO SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.97m (13.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $898,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18744,  Location: 0.5 MI N JCT US 84 (Lat: 31.424908,  Lng: -87.000089),  Route carried "on" structure: Interstate 65,  Year Built: 2021,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 23,522 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 35,283 (year 2040),  Design Load: HL 93,  Features Intersected: MURDER CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.411,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.4m (96.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.84m (35.56ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $7,135,000,  Roadway Improvement Cost: $714,000,  Total Project Cost: $7,849,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18746,  Location: 0.3 MI N JCT US 84 (Lat: 31.423128,  Lng: -87.002039),  Route carried "on" structure: Interstate 65,  Year Built: 2021,  Status: Open,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 23,522 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 35,283 (year 2040),  Design Load: HL 93,  Features Intersected: MURDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.139,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.4m (96.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.67m (48.13ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $9,656,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $10,622,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1986,  Location: 2.1 MILE WEST OF BROOKLYN (Lat: 31.273378,  Lng: -86.890203),  Route carried "on" structure: County highway 6,  Year Built: 2006,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 610 (year 1995),  Truck Traffic: 12%,  Average Future Daily Traffic: 809 (year 2035),  Design Load: HS 20,  Features Intersected: FEAGIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.9m (32.5ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19861,  Location: 2.1 MI.W OF BROOKLYN (Lat: 31.273400,  Lng: -86.803200),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Posted for load,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 610 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 809 (year 2035),  Design Load: HS 20,  Features Intersected: POLLY CREEK,  Facility Carried by Structure: C.R.6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 11.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19949,  Location: 2 MILE WEST OF PAUL AL. (Lat: 31.306192,  Lng: -86.764019),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 100 (year 1995),  Average Future Daily Traffic: 174 (year 2034),  Features Intersected: BUCKET BRANCH CR.,  Facility Carried by Structure: BUCKET BRANCH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.0m (16.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $210,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 20247,  Location: 4 MI W OWASSA (Lat: 31.487467,  Lng: -86.955317),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 15 (year 2009),  Average Future Daily Traffic: 23 (year 2034),  Features Intersected: STREAM,  Facility Carried by Structure: TWO BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.7m (5.6ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.35m (4.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $275,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 139,  Location: DOWNTOWN EVERGREEN (Lat: 31.434508,  Lng: -86.954275),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 215 (year 2019),  Truck Traffic: 10%,  Features Intersected: CSX RR * CITY STREETS,  Facility Carried by Structure: US 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 139,  Location: DOWNTOWN EVERGREEN (Lat: 31.434508,  Lng: -86.954275),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 222 (year 2019),  Truck Traffic: 10%,  Features Intersected: CSX RR * CITY STREETS,  Facility Carried by Structure: US 31
Minimum Vertical Clearance: 6.13m (20.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 6467,  Location: 3.5 MI S JCT US 84 (Lat: 31.378258,  Lng: -87.043300),  Route carried "under" structure: Interstate 65,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 26,152 (year 2019),  Truck Traffic: 28%,  Features Intersected: I-65,  Facility Carried by Structure: PATE ROAD
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 143.795,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 6564,  Location: EVERGREEN (Lat: 31.418956,  Lng: -87.006656),  Route carried "under" structure: Interstate 65,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 27,350 (year 2019),  Truck Traffic: 28%,  Features Intersected: I-65,  Facility Carried by Structure: US 84
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 149.605,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 6801,  Location: 2 MI N JCT US 84 (Lat: 31.440706,  Lng: -86.981294),  Route carried "under" structure: County highway 20,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 740 (year 2019),  Truck Traffic: 8%,  Features Intersected: CO RD 20,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 5.60m (18.37ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)