Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Charleston, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 444Number of bridges
  • 7,077ft / 2,157mTotal length
  • $104,834,000Total costs
  • 5,199,565Total average daily traffic
  • 748,147Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Charleston
  • No street view available for this location

New bridges in Charleston, WV - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 61920-1929
  • 171930-1939
  • 111940-1949
  • 381950-1959
  • 271960-1969
  • 2161970-1979
  • 531980-1989
  • 311990-1999
  • 272000-2009
  • 162010-2019
Reconstructed bridges in Charleston, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 51970-1979
  • 151980-1989
  • 31990-1999
  • 62000-2009
  • 22010-2019
Average Bridge Daily Traffic in Charleston, WV
Average Bridge Truck Traffic in Charleston, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.3%Very good
  • 33.2%Good
  • 31.1%Satisfactory
  • 26.0%Fair
  • 4.7%Poor
  • 0.9%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Very good
  • 37.4%Good
  • 23.1%Satisfactory
  • 26.9%Fair
  • 6.7%Poor
  • 0.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Very good
  • 29.0%Good
  • 28.6%Satisfactory
  • 27.7%Fair
  • 8.0%Poor
  • 0.8%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.4%Excellent
  • 29.8%Very good
  • 23.8%Good
  • 23.8%Satisfactory
  • 18.5%Fair
  • 1.2%Poor
  • 0.6%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.7%Good
  • 45.5%Satisfactory
  • 31.8%Fair
Find on map >>   Show street view

Structure Number: 20A432,  Location: 0.10 MI N OF I-64 (Lat: 38.361150,  Lng: -81.627389),  Route carried "on" structure: Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 1.93m (6.33ft),  Average Daily Traffic: 25,450 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 39,702 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SPRING STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.833,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb-To-Curb Width: 22.1m (72.5ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.93m (6.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A433,  Location: 0.10 MI N OF I-64 (Lat: 38.361450,  Lng: -81.627381),  Route carried "on" structure: Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 25,450 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 39,702 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SPRING STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.833,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A434,  Location: 0.32 MI N OF I-64 (Lat: 38.362350,  Lng: -81.623531),  Route carried "on" structure: Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 5.78m (18.96ft),  Average Daily Traffic: 50,900 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 79,404 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GARRISON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.187,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.8m (147.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 44.7m (146.7ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.78m (18.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Total Project Cost: $100,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A436,  Location: 0.54 MI N OF I-64 (Lat: 38.363311,  Lng: -81.619719),  Route carried "on" structure: Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 50,900 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 79,404 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WESTMORELAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.542,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.4m (73.5ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 34.8m (114.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Total Project Cost: $100,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A438,  Location: 0.78 MI N OF I-64 (Lat: 38.364431,  Lng: -81.615681),  Route carried "on" structure: Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 62,400 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 76,128 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: CORA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.928,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 45.4m (149.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 45.7m (149.9ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,300,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A44,  Location: 0.13 MI N OF I-79 (Lat: 38.376919,  Lng: -81.606281),  Route carried "on" structure: Ramp Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 3.34m (10.96ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,120 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-77 NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.666,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.34m (10.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $800,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A441,  Location: 0.09 MI N 0F I-79 (Lat: 38.376731,  Lng: -81.605189),  Route carried "on" structure: Ramp Interstate 77,  Year Built: 1974,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,900 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,964 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NEWHOUSE DRIVE
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 165.601,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.3m (89.6ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A442,  Location: 1.00 MI N OF I-79 (Lat: 38.384250,  Lng: -81.615339),  Route carried "on" structure: Interstate 77,  Year Built: 1972,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 19,511 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 23,803 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: CR 119/37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.825,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A443,  Location: 1.00 MI N OF I-79 (Lat: 38.384111,  Lng: -81.615531),  Route carried "on" structure: Interstate 77,  Year Built: 1972,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 13,300 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 20,748 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR 119/37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.825,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A444,  Location: 2.97 MI N OF I-79 N(X) (Lat: 38.413061,  Lng: -81.630469),  Route carried "on" structure: Interstate 7700,  Year Built: 1972,  Status: Open,  Structure Length: 9.18m (30.12ft),  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 15,860 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: CR 27 & KAN TWOMILE CK,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.767,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.6m (113.5ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A445,  Location: 2.97 MI N OF I-79 (X) (Lat: 38.412889,  Lng: -81.630631),  Route carried "on" structure: Interstate 77,  Year Built: 1972,  Status: Open,  Structure Length: 9.18m (30.12ft),  Average Daily Traffic: 5,000 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,750 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: CR 27 & KAN TWOMILE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.767,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.6m (113.5ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A45,  Location: 0.99 MI N OF CR 28 (Lat: 38.509600,  Lng: -81.644161),  Route carried "on" structure: Interstate 77,  Year Built: 1959,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 5.65m (18.54ft),  Average Daily Traffic: 22,000 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 31,020 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: CR 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 182.564,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.65m (18.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A453,  Location: 1.28 MI N OF CR 21/17 (Lat: 38.562161,  Lng: -81.636539),  Route carried "on" structure: Interstate 77,  Year Built: 1959,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 8.07m (26.48ft),  Average Daily Traffic: 8,300 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,948 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CR 19 & ALLEN FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 188.776,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $425,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A49,  Location: 0.10 MI N OF I-77 (Lat: 38.375411,  Lng: -81.605939),  Route carried "on" structure: Interstate 79,  Year Built: 1976,  Status: Open,  Structure Length: 10.56m (34.65ft),  Average Daily Traffic: 28,800 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 35,136 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.56m (34.65ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $850,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A491,  Location: 0.20 MI N OF I-77 (Lat: 38.376011,  Lng: -81.604561),  Route carried "on" structure: Interstate 79,  Year Built: 1974,  Status: Open,  Structure Length: 4.34m (14.24ft),  Average Daily Traffic: 13,700 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 16,714 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: CR 119/16 NEWHOUSE BR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.4m (60.4ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.34m (14.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $700,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A492,  Location: 0.22 MI N OF I-77 (Lat: 38.376750,  Lng: -81.605039),  Route carried "on" structure: Interstate 79,  Year Built: 1974,  Status: Open,  Structure Length: 10.34m (33.92ft),  Average Daily Traffic: 28,800 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 40,608 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.34m (33.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A493,  Location: 0.76 MI N OF I-77 (Lat: 38.382611,  Lng: -81.598361),  Route carried "on" structure: Interstate 79,  Year Built: 1978,  Status: Open,  Structure Length: 9.70m (31.82ft),  Average Daily Traffic: 11,910 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 14,292 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: CR 119/31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.70m (31.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A494,  Location: 0.76 MI. N. OF I-77 (Lat: 38.382781,  Lng: -81.598531),  Route carried "on" structure: Interstate 79,  Year Built: 1978,  Status: Open,  Structure Length: 9.86m (32.35ft),  Average Daily Traffic: 11,910 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 14,530 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: CR 119/31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.86m (32.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $550,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A495,  Location: 1.03 MI N OF I-77 (Lat: 38.384069,  Lng: -81.593850),  Route carried "on" structure: Interstate 79,  Year Built: 1978,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 13,700 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 16,714 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: US 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.658,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A497,  Location: 1.95 MI N OF I-77 (Lat: 38.393231,  Lng: -81.588969),  Route carried "on" structure: Interstate 79,  Year Built: 1978,  Status: Open,  Structure Length: 6.12m (20.08ft),  Average Daily Traffic: 13,700 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 19,317 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: 119 (SLS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.138,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.2m (79.4ft),  Curb-To-Curb Width: 25.7m (84.3ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A501,  Location: 0.29 MI N OF WV 114 (Lat: 38.419789,  Lng: -81.544831),  Route carried "on" structure: Interstate 79,  Year Built: 1978,  Status: Open,  Structure Length: 6.48m (21.26ft),  Average Daily Traffic: 11,223 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 13,692 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: CR 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.948,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.48m (21.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A502,  Location: 2.11 MI N OF WV 114 (Lat: 38.437081,  Lng: -81.520431),  Route carried "on" structure: Interstate 79,  Year Built: 1975,  Status: Open,  Structure Length: 30.72m (100.79ft),  Average Daily Traffic: 9,450 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 11,529 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CR45 & LITTLE SANDY CK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.877,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 3,  Length of Maximum Span: 51.2m (168.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A503,  Location: 2.11 MI N OF WV 114 (Lat: 38.437169,  Lng: -81.520650),  Route carried "on" structure: Interstate 79,  Year Built: 1975,  Status: Open,  Structure Length: 29.44m (96.59ft),  Average Daily Traffic: 10,783 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 13,155 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: CR45 LITTLE SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.877,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.44m (96.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A525,  Location: 0.11 MI N OF US 60 (Lat: 38.340869,  Lng: -81.613050),  Route carried "on" structure: State highway 114,  Year Built: 1974,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 13,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,552 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PIEDMONT ROAD & N&S RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 29.1m (95.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 22.1m (72.5ft),  Out-to-Out Width: 31.8m (104.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $850,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 20A528,  Location: 0.19 MI N OF US 60 (Lat: 38.341789,  Lng: -81.612219),  Route carried "on" structure: State highway 114,  Year Built: 1975,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 12,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,884 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-77 SB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.676,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.0m (105.0ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 28.8m (94.5ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 20A531,  Location: 1.37 MI N OF CR 60/63 (Lat: 38.334089,  Lng: -81.622331),  Route carried "on" structure: State highway 61,  Year Built: 1956,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 19,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,180 (year 2039),  Features Intersected: LICK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.427,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 20A533,  Location: 0.63 MI N OF CR 214/2 (Lat: 38.349339,  Lng: -81.649961),  Route carried "on" structure: Ramp US 119,  Year Built: 1975,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 12,700 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,494 (year 2038),  Design Load: HS 20,  Features Intersected: US 119 SPUR NB&SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.87m (42.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A534,  Location: 2.14 MI E OF CR 60/64 (Lat: 38.354019,  Lng: -81.649839),  Route carried "on" structure: Ramp Interstate 64,  Year Built: 1975,  Status: Open,  Structure Length: 9.07m (29.76ft),  Average Daily Traffic: 11,939 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 16,834 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: WV61 & CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.682,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A536,  Location: 0.95 MI N OF US 119 (Lat: 38.409039,  Lng: -81.577100),  Route carried "on" structure: County highway 11913,  Year Built: 1976,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 197 (year 2040),  Design Load: HS 20,  Features Intersected: I 79 NB/SB,  Facility Carried by Structure: CR 119/13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $800,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A543,  Location: 0.04 MI S OF CR 23/15 (Lat: 38.278831,  Lng: -81.639461),  Route carried "on" structure: County highway 23,  Year Built: 1981,  Status: Posted for load,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 65 (year 2041),  Features Intersected: KANAWHA FK OF DAVIS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.851,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.93m (3.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $550,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 20A547,  Location: 0.01 MI N OF CR 73/5 (Lat: 38.323881,  Lng: -81.507781),  Route carried "on" structure: County highway 7313,  Year Built: 1988,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 61 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: POINT LICK FORK,  Facility Carried by Structure: COUNTY ROUTE 73/13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A549,  Location: 0.01 MI SOUTH OF CR 79/3 (Lat: 38.174450,  Lng: -81.457219),  Route carried "on" structure: County highway 799,  Year Built: 1983,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 61 (year 2038),  Design Load: HS 20,  Features Intersected: CABIN CREEK,  Facility Carried by Structure: CR 79/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.0m (72.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000 ( Estimate for 2020),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 20A55,  Location: 0.20 MI S OF WV 61 (Lat: 38.241089,  Lng: -81.564861),  Route carried "on" structure: State highway 94,  Year Built: 1979,  Status: Open,  Structure Length: 3.52m (11.55ft),  Average Daily Traffic: 9,000 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,980 (year 2038),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A554,  Location: 0.01 MI E OF WV 94 (Lat: 38.237161,  Lng: -81.567200),  Route carried "on" structure: County highway 11964,  Year Built: 1979,  Status: Open,  Structure Length: 4.31m (14.14ft),  Average Daily Traffic: 30 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 37 (year 2038),  Design Load: HS 15,  Features Intersected: LENS CREEK,  Facility Carried by Structure: CR 119/64
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A561,  Location: 0.04 MILE N OF CR 5/3 (Lat: 38.427869,  Lng: -81.747119),  Route carried "on" structure: State highway 622,  Year Built: 1971,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 14,800 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,836 (year 2040),  Design Load: HS 20,  Features Intersected: ROCKY FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.867,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.9m (65.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.12m (6.96ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A586,  Location: 0.40 MI E OF WV 25 (Lat: 38.420261,  Lng: -81.834761),  Route carried "on" structure: County highway 251,  Year Built: 1992,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,013 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BLAKES CREEK,  Facility Carried by Structure: CR 25/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A587,  Location: 0.08 MI N OF CR 47/7 (Lat: 38.439511,  Lng: -81.484761),  Route carried "on" structure: County highway 47,  Year Built: 1985,  Status: Open,  Structure Length: 12.99m (42.62ft),  Average Daily Traffic: 4,400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,368 (year 2039),  Design Load: HS 20,  Features Intersected: ELK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.651,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.99m (42.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $700,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A633,  Location: 0.89 MI S OF WV61 (Lat: 38.297789,  Lng: -81.565550),  Route carried "on" structure: Interstate 7700,  Year Built: 1983,  Status: Open,  Structure Length: 7.69m (25.23ft),  Average Daily Traffic: 35,546 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 62,206 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Route 61,  Facility Carried by Structure: I-77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 150.731,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 35 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Charleston, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.