Bridge Statistics for Boligee, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 45Number of bridges
  • 974ft / 297mTotal length
  • $90,664,000Total costs
  • 462,352Total average daily traffic
  • 200,983Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Boligee
  • No street view available for this location

New bridges in Boligee, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 101960-1969
  • 251970-1979
  • 21980-1989
  • 31990-1999
Average Bridge Daily Traffic in Boligee, AL
Average Bridge Truck Traffic in Boligee, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.7%Excellent
  • 8.1%Very good
  • 18.9%Good
  • 54.1%Satisfactory
  • 16.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.7%Excellent
  • 8.1%Very good
  • 62.2%Good
  • 24.3%Satisfactory
  • 2.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Very good
  • 73.0%Good
  • 16.2%Satisfactory
  • 2.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.8%Very good
  • 54.8%Good
  • 19.4%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 606,  Location: 0.7 MI N ALLISION (Lat: 32.794983,  Lng: -87.968400),  Route carried "on" structure: US 11,  Year Built: 1929,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,060 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,389 (year 2040),  Design Load: H 15,  Features Intersected: Bean Stack Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.601,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $365,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1732,  Location: 1.7 MI. W. OF ZIMCO (Lat: 31.721025,  Lng: -87.897583),  Route carried "on" structure: US 84,  Year Built: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,500 (year 2013),  Truck Traffic: 28%,  Average Future Daily Traffic: 2,012 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.731,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $384,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7917,  Location: 3.9 MI NW US HWY 11 (Lat: 32.831300,  Lng: -87.982200),  Route carried "on" structure: County highway 3,  Year Built: 1963,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 316 (year 1995),  Truck Traffic: 30%,  Average Future Daily Traffic: 360 (year 2031),  Design Load: H 15,  Features Intersected: BRUSH CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8548,  Location: I-20/59 MM 36.54 (Lat: 32.829050,  Lng: -87.979633),  Route carried "on" structure: County highway 133,  Year Built: 1965,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 167 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 371 (year 2041),  Design Load: HS 20,  Features Intersected: I-20/59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.58m (28.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,647,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $1,812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8649,  Location: 0.5 MI N US 11 AT FOWLER (Lat: 32.732561,  Lng: -88.066233),  Route carried "on" structure: County highway 1,  Year Built: 1965,  Status: Posted for load,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 156 (year 1995),  Truck Traffic: 15%,  Average Future Daily Traffic: 180 (year 2030),  Design Load: H 15,  Features Intersected: BOLIGEE CREEK,  Facility Carried by Structure: CO RD 82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 16.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $966,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,063,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 9513,  Location: 2.0 MI W of Boligee (Lat: 32.796617,  Lng: -88.032850),  Route carried "on" structure: County highway 20,  Year Built: 1968,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 1,333 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,007 (year 2041),  Design Load: HS 20,  Features Intersected: I-20/59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.64m (31.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,917,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,109,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9616,  Location: BOLIGEE (Lat: 32.756733,  Lng: -88.021900),  Route carried "on" structure: US 11,  Year Built: 1968,  Status: Open,  Structure Length: 4.98m (16.34ft),  Average Daily Traffic: 870 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,140 (year 2033),  Design Load: HS 20,  Features Intersected: NORFORK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.853,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.99m (19.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,931,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,124,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9617,  Location: 0.1 MI N BOLIGEE (Lat: 32.757167,  Lng: -88.020133),  Route carried "on" structure: US 11,  Year Built: 1968,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 870 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,140 (year 2040),  Design Load: H 15,  Features Intersected: Meeting House Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.022,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,130,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,243,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9654,  Location: 0.3 MI N. US 11 (Lat: 32.768333,  Lng: -88.023333),  Route carried "on" structure: County highway 19,  Year Built: 1968,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 630 (year 1995),  Truck Traffic: 60%,  Average Future Daily Traffic: 720 (year 2030),  Design Load: HS 15,  Features Intersected: SOUTHERN RAILROAD,  Facility Carried by Structure: CO RD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.23m (23.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,636,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,800,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9655,  Location: 1.0 MI N US 11 (Lat: 32.761667,  Lng: -88.020000),  Route carried "on" structure: County highway 19,  Year Built: 1968,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 630 (year 1995),  Truck Traffic: 60%,  Average Future Daily Traffic: 720 (year 2034),  Design Load: HS 15,  Features Intersected: BOLIGEE CANAL,  Facility Carried by Structure: CO RD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.27m (40.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,777,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $3,055,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10445,  Location: 3.3 MI N SUMTER CO LINE (Lat: 32.720133,  Lng: -88.071200),  Route carried "on" structure: US 11,  Year Built: 1930,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 34.61m (113.55ft),  Average Daily Traffic: 700 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 917 (year 2033),  Design Load: H 10,  Features Intersected: TOMBIGBEE RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.562,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 63,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 34.61m (113.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $6,882,000,  Roadway Improvement Cost: $688,000,  Total Project Cost: $7,570,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10446,  Location: 3.8 MI N SUMTER CO LINE (Lat: 32.726300,  Lng: -88.065050),  Route carried "on" structure: US 11,  Year Built: 1930,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 24.73m (81.14ft),  Average Daily Traffic: 700 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 917 (year 2033),  Design Load: H 10,  Features Intersected: TOMBIGBEE RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.457,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 45,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.73m (81.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,919,000,  Roadway Improvement Cost: $492,000,  Total Project Cost: $5,411,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10471,  Location: 4.5 MI S OF BOLIGEE (Lat: 32.746708,  Lng: -88.087589),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.124,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10472,  Location: 4.5 MI S OF BOLIGEE (Lat: 32.746536,  Lng: -88.087383),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.124,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10473,  Location: 4.1 MI S OF BOLIGEE (Lat: 32.751303,  Lng: -88.081883),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.863,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10474,  Location: 4.1 MI S OF BOLIGEE (Lat: 32.751125,  Lng: -88.081669),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,553 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.863,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10475,  Location: 3.9 MI S BOLIGEE (Lat: 32.753411,  Lng: -88.079356),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.198,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10476,  Location: 3.9 MI S BOLIGEE (Lat: 32.753239,  Lng: -88.079158),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,553 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.198,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10477,  Location: 3.7 MI S OF BOLIGEE (Lat: 32.755642,  Lng: -88.076878),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.539,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10478,  Location: 3.7 MI S OF BOLIGEE (Lat: 32.755469,  Lng: -88.076639),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,552 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.539,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10479,  Location: 3.5 MI S OF BOLIGEE (Lat: 32.757653,  Lng: -88.074717),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.840,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1048,  Location: 3.5 MI S OF BOLIGEE (Lat: 32.757481,  Lng: -88.074492),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,553 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.840,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10481,  Location: MM 29.4 on I-20/59 (Lat: 32.760567,  Lng: -88.071550),  Route carried "on" structure: County highway 78,  Year Built: 1971,  Status: Open,  Structure Length: 11.64m (38.19ft),  Average Daily Traffic: 380 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20,  Features Intersected: I-20/59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.51m (41.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,659,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $2,925,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10482,  Location: 3.1 MI S OF BOLIGEE (Lat: 32.761844,  Lng: -88.069853),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2033),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.487,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,158,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10483,  Location: 3.1 MI S OF BOLIGEE (Lat: 32.762022,  Lng: -88.070094),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.487,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,158,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10484,  Location: 2.5 MI S OF BOLIGEE (Lat: 32.768472,  Lng: -88.063222),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.451,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,158,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10485,  Location: 2.5 MI S OF BOLIGEE (Lat: 32.768308,  Lng: -88.062989),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.451,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,158,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10486,  Location: 2.1 MI S OF BOLIGEE (Lat: 32.773167,  Lng: -88.058350),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.136,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10487,  Location: 2.1 MI S OF BOLIGEE (Lat: 32.773000,  Lng: -88.058033),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 16,553 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.136,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10488,  Location: 1.7 MI S OF BOLIGEE (Lat: 32.777933,  Lng: -88.053283),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.845,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10489,  Location: 1.7 MI S OF BOLIGEE (Lat: 32.777733,  Lng: -88.052983),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 11,035 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.845,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1049,  Location: 1.1 MI S of Boligee (Lat: 32.782967,  Lng: -88.047683),  Route carried "on" structure: County highway 80,  Year Built: 1971,  Status: Open,  Structure Length: 10.55m (34.61ft),  Average Daily Traffic: 304 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 403 (year 2040),  Design Load: HS 20,  Features Intersected: I-20/59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.45m (37.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,435,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $2,679,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10668,  Location: 0.5 MI S OF BOLIGEE (Lat: 32.789517,  Lng: -88.040650),  Route carried "on" structure: Interstate 59,  Year Built: 1972,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: AGR Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.583,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.98m (19.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,764,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,940,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10669,  Location: 0.5 MI S OF BOLIGEE (Lat: 32.789233,  Lng: -88.040500),  Route carried "on" structure: Interstate 59,  Year Built: 1972,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: AGR Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.583,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.98m (19.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,764,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,940,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10933,  Location: ALLISON (Lat: 32.786717,  Lng: -87.975917),  Route carried "on" structure: US 11,  Year Built: 1973,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 1,060 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,389 (year 2033),  Design Load: HS 20,  Features Intersected: NORFORK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.431,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,611,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $2,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13292,  Location: 1.6 M N LIZZIEVILLE (Lat: 32.815000,  Lng: -88.031667),  Route carried "on" structure: County highway 19,  Year Built: 1984,  Status: Open,  Structure Length: 15.24m (50.00ft),  Average Daily Traffic: 840 (year 1995),  Truck Traffic: 80%,  Average Future Daily Traffic: 900 (year 2030),  Design Load: H 20,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 18,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 8.7m (28.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.01m (52.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,293,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $3,622,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15868,  Location: 1.3 MI N BRAGSVILLE (Lat: 32.698333,  Lng: -87.993333),  Route carried "on" structure: County highway 9,  Year Built: 1993,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 305 (year 1991),  Truck Traffic: 31%,  Average Future Daily Traffic: 366 (year 2031),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK RELIEF,  Facility Carried by Structure: CO RD 72
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1732,  Location: 3.1 MI N ALA HWY 39 (Lat: 32.920203,  Lng: -88.086450),  Route carried "on" structure: County highway 125,  Year Built: 1999,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 175 (year 1999),  Average Future Daily Traffic: 200 (year 2031),  Design Load: HS 20,  Features Intersected: TUBBS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,134,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,247,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19777,  Location: 0.6 MI N BOLIGEE (Lat: 32.763333,  Lng: -88.030000),  Route carried "on" structure: County highway 81,  Year Built: 1993,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 325 (year 2000),  Average Future Daily Traffic: 360 (year 2030),  Design Load: HS 20,  Features Intersected: BOLIGEE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,036,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,140,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous