Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Weston, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 71Number of bridges
  • 692ft / 211mTotal length
  • $49,485,000Total costs
  • 281,045Total average daily traffic
  • 45,952Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Weston
  • No street view available for this location

New bridges in Weston, WV - historical statistics
  • New bridges - historical statistics
  • 51910-1919
  • 121920-1929
  • 11930-1939
  • 21940-1949
  • 21950-1959
  • 31960-1969
  • 251970-1979
  • 31980-1989
  • 61990-1999
  • 72000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in Weston, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Weston, WV
Average Bridge Truck Traffic in Weston, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.0%Good
  • 39.5%Satisfactory
  • 39.5%Fair
  • 4.7%Poor
  • 2.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.5%Good
  • 26.3%Satisfactory
  • 31.6%Fair
  • 24.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.5%Good
  • 21.6%Satisfactory
  • 47.1%Fair
  • 3.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Good
  • 23.6%Satisfactory
  • 12.7%Fair
  • 3.6%Poor
Find on map >>   Show street view

Structure Number: 21A002,  Location: 0.06 MI N OF CO 1/7 (Lat: 39.086589,  Lng: -80.475611),  Route carried "on" structure: County highway 100,  Year Built: 1924,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 1,700 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,278 (year 2035),  Features Intersected: GEELICK RUN,  Facility Carried by Structure: GEELICK RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $270,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 21A027,  Location: 0.01 MI W OF CO 9/5 SLS (Lat: 39.096450,  Lng: -80.526050),  Route carried "on" structure: County highway 1000,  Year Built: 1925,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 700 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 938 (year 2038),  Features Intersected: RIGHT FORK FREEMANS CK,  Facility Carried by Structure: COUNTY ROUTE 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.584,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $375,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 21A031,  Location: 0.01 MI S CO 10 (Lat: 39.091089,  Lng: -80.530039),  Route carried "on" structure: County highway 1008,  Year Built: 1914,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 250 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 275 (year 2035),  Features Intersected: LEFT FORK OF FREEMANS CK,  Facility Carried by Structure: COUNTY ROUTE 10/8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.895,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Superstructure: Poor,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $300,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 21A045,  Location: 0.11 MI S OF US 33 X (Lat: 38.999061,  Lng: -80.384150),  Route carried "on" structure: County highway 1500,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,725 (year 2038),  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: COUNTY ROUTE 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.114,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A06,  Location: 0.40 MI N OF US RT 33 F (Lat: 39.043361,  Lng: -80.462119),  Route carried "on" structure: US 1900,  Year Built: 1929,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 6,500 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,800 (year 2038),  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: US ROUTE 19 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.831,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.1m (62.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $600,000,  Total Project Cost: $2,200,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A061,  Location: 0.14 MI N OF CO RT 12 SLS (Lat: 39.063939,  Lng: -80.453000),  Route carried "on" structure: US 1900,  Year Built: 1927,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,620 (year 2038),  Features Intersected: MAXWELL RUN,  Facility Carried by Structure: US 19 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.776,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $212,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A062,  Location: 0.14 MI N OF CO 19/26 SLS (Lat: 39.064369,  Lng: -80.441169),  Route carried "on" structure: US 1900,  Year Built: 1929,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,082 (year 2038),  Features Intersected: MAXWELL RUN,  Facility Carried by Structure: US 19 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.806,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $450,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A07,  Location: 0.02 MI W CO 20/2 (Lat: 39.028181,  Lng: -80.528481),  Route carried "on" structure: County highway 2200,  Year Built: 1923,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 200 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 228 (year 2035),  Features Intersected: LIMESTONE RUN,  Facility Carried by Structure: COUNTY ROUTE 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.129,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $185,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A074,  Location: 0.26 MI N CO 24/4 (Lat: 38.995189,  Lng: -80.512639),  Route carried "on" structure: County highway 2400,  Year Built: 1923,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 275 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2035),  Features Intersected: JENNINGS RUN,  Facility Carried by Structure: COUNTY ROUTE 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $419,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 21A089,  Location: 0.04 MI W OF CO RT 119/11 (Lat: 39.048011,  Lng: -80.533689),  Route carried "on" structure: US 3300,  Year Built: 1921,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 3,000 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,130 (year 2038),  Features Intersected: DRY FORK,  Facility Carried by Structure: US ROUTE 33 F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.115,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A09,  Location: 0.23 MI E OF CO 119/15 (Lat: 39.048000,  Lng: -80.479669),  Route carried "on" structure: US 3300,  Year Built: 1931,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 10,000 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,400 (year 2038),  Features Intersected: POLK CREEK,  Facility Carried by Structure: US ROUTE 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.120,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Superstructure: Fair,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $86,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 21A091,  Location: 0.01 MI E OF CO RT 1 SLS (Lat: 39.038781,  Lng: -80.468150),  Route carried "on" structure: US 3300,  Year Built: 1922,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 12,200 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,800 (year 2038),  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: US ROUTE 33 F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.568,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,000,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 21A093,  Location: 0.08 MI W OF CO 119/18 (Lat: 39.013639,  Lng: -80.406850),  Route carried "on" structure: US 3300,  Year Built: 1974,  Status: Open,  Structure Length: 4.14m (13.58ft),  Average Daily Traffic: 12,450 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,070 (year 2038),  Design Load: HS 20,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: US 33 EBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.166,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.15m (13.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $600,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A094,  Location: 0.09 MI W OF CO 119/21 (Lat: 39.004869,  Lng: -80.392611),  Route carried "on" structure: US 3300,  Year Built: 1974,  Status: Open,  Structure Length: 4.37m (14.34ft),  Average Daily Traffic: 7,450 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,820 (year 2038),  Design Load: HS 20,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: US 33 EBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A095,  Location: 0.06 MI E CO 13 (Lat: 39.022961,  Lng: -80.415131),  Route carried "on" structure: County highway 3301,  Year Built: 1918,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 225 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2035),  Features Intersected: HILLY UPLAND RUN,  Facility Carried by Structure: COUNTY ROUTE 33/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.1m (26.6ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $416,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A098,  Location: 0.01 MI S OF CO 38/6 (Lat: 39.014769,  Lng: -80.477161),  Route carried "on" structure: County highway 3803,  Year Built: 1952,  Status: Posted for load,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 11 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 13 (year 2035),  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: COUNTY ROUTE 38/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 21A117,  Location: 2.87 MI S US 33 (Lat: 39.014569,  Lng: -80.471769),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 13.44m (44.09ft),  Average Daily Traffic: 9,800 (year 2015),  Truck Traffic: 27%,  Average Future Daily Traffic: 14,425 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: W Fk Rvr Co 19/39 & 38/3,  Facility Carried by Structure: I-79 N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 154.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.44m (44.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A118,  Location: 2.87 M1 S OF US 33 (Lat: 39.014339,  Lng: -80.471619),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 13.44m (44.09ft),  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 13,968 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: W Fk Rvr Co 19/39 & 38/3,  Facility Carried by Structure: I-79 S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 154.063,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.44m (44.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A121,  Location: 0.20 MI S US 33 (Lat: 39.019731,  Lng: -80.429200),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 11,350 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 16,700 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: I-79 N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $6,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A122,  Location: 0.20 MI S US 33 (Lat: 39.019689,  Lng: -80.429250),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 9.67m (31.73ft),  Average Daily Traffic: 11,350 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 16,700 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: I-79 S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $6,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A123,  Location: 0.19 MI S OF US 33 (Lat: 39.019750,  Lng: -80.428661),  Route carried "on" structure: Ramp Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 10.22m (33.53ft),  Average Daily Traffic: 8,750 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,866 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: I-79 NBL EXIT RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.376,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.21m (33.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $400,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A124,  Location: 2.81 MI N OF CO 19/39 (Lat: 39.021700,  Lng: -80.427750),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 10,316 (year 2015),  Truck Traffic: 27%,  Average Future Daily Traffic: 15,168 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: US 33,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.633,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A125,  Location: 2.81 MI N OF CO 19/39 (Lat: 39.021719,  Lng: -80.427689),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 10,316 (year 2015),  Truck Traffic: 27%,  Average Future Daily Traffic: 15,168 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: US 33,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.633,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A126,  Location: 2.74 MI N US 33 (Lat: 39.053931,  Lng: -80.400431),  Route carried "on" structure: Interstate 7900,  Year Built: 1971,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 13,900 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 19,900 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Co 14,  Facility Carried by Structure: I-79 NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.091,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.3m (112.5ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $6,500,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A127,  Location: 2.74 MI N US 33 (Lat: 39.054081,  Lng: -80.400581),  Route carried "on" structure: Interstate 7900,  Year Built: 1971,  Status: Open,  Structure Length: 8.25m (27.07ft),  Average Daily Traffic: 13,900 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 19,900 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Co 14,  Facility Carried by Structure: I-79 SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.091,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $6,500,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A137,  Location: 0.03 MI S US 33 (Lat: 39.047389,  Lng: -80.509600),  Route carried "on" structure: County highway 11914,  Year Built: 1923,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 225 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2035),  Features Intersected: POLK CREEK,  Facility Carried by Structure: COUNTY RTE 119/14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.044,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Superstructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $138,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 21A141,  Location: 0.32 MI W US 33 (Lat: 39.019600,  Lng: -80.430331),  Route carried "on" structure: County highway 11916,  Year Built: 1912,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 20 (year 2015),  Average Future Daily Traffic: 25 (year 2035),  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: COUNTY RTE 119/16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $475,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 21A142,  Location: 0.20 MI S OF US 33 X (Lat: 39.001711,  Lng: -80.394131),  Route carried "on" structure: County highway 11921,  Year Built: 1963,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 460 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: COUNTY RT 119/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.849,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $119,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $160,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21A144,  Location: 0.03 MI N OF US 33 (Lat: 39.008119,  Lng: -80.396011),  Route carried "on" structure: County highway 11926,  Year Built: 1914,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 150 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 175 (year 2035),  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: COUNTY 119/26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Superstructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $862,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 21A15,  Location: 0.05 MI W OF CO 26 (Lat: 39.036389,  Lng: -80.358931),  Route carried "on" structure: County highway 2604,  Year Built: 1980,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 30 (year 2015),  Average Future Daily Traffic: 35 (year 2035),  Features Intersected: LAUREL LICK,  Facility Carried by Structure: COUNTY ROUTE 26/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $230,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A152,  Location: 0.08 MI W OF CO 119/18 (Lat: 39.013661,  Lng: -80.406639),  Route carried "on" structure: US 3300,  Year Built: 1963,  Status: Open,  Structure Length: 3.91m (12.83ft),  Average Daily Traffic: 12,450 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,070 (year 2038),  Design Load: HS 20,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: US 33 WBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.166,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $2,300,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A153,  Location: 0.09 MI W OF CO 119/21 (Lat: 39.004969,  Lng: -80.392511),  Route carried "on" structure: US 3300,  Year Built: 1963,  Status: Open,  Structure Length: 4.37m (14.34ft),  Average Daily Traffic: 7,450 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,820 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: STONECOAL CREEK,  Facility Carried by Structure: US 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $2,300,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21A158,  Location: 0.05 MI S OF CO 33/24 (Lat: 39.044800,  Lng: -80.500300),  Route carried "on" structure: County highway 3323,  Year Built: 1995,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 20 (year 2018),  Average Future Daily Traffic: 27 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: POLK CREEK,  Facility Carried by Structure: COUNTY ROUTE 33/23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Wood or Timber,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $240,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21A173,  Location: 0.08 MI S JCT CO 36 SLS (Lat: 38.970711,  Lng: -80.416869),  Route carried "on" structure: County highway 3000,  Year Built: 1985,  Status: Open,  Structure Length: 6.20m (20.34ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2038),  Features Intersected: LITTLE SKIN CREEK,  Facility Carried by Structure: CO ROUTE 30 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.668,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.0m (65.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: August 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21A174,  Location: 0.01 MI W OF US 19 SLS (Lat: 39.017169,  Lng: -80.478639),  Route carried "on" structure: County highway 1943,  Year Built: 1994,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: COUNTY ROUTE 19/43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21A176,  Location: 0.03 MI S OF US 33 (Lat: 39.049289,  Lng: -80.491150),  Route carried "on" structure: County highway 3329,  Year Built: 1990,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 58 (year 2038),  Design Load: HS 20,  Features Intersected: POLK CREEK,  Facility Carried by Structure: CO RT 33/29 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 21A178,  Location: 0.08 MI S JCT US 19 (Lat: 39.029261,  Lng: -80.474100),  Route carried "on" structure: County highway 2400,  Year Built: 1997,  Status: Open,  Structure Length: 6.02m (19.75ft),  Average Daily Traffic: 443 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 505 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: CO RT 24 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.095,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.7m (74.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2019,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21A184,  Location: 0.01 MI S US 33 (Lat: 39.048681,  Lng: -80.521811),  Route carried "on" structure: County highway 11929,  Year Built: 2001,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 55 (year 2015),  Average Future Daily Traffic: 63 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: POLK CREEK,  Facility Carried by Structure: CO 119/29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Discuss Weston, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.