Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sunrise, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 88Number of bridges
  • 2,178ft / 664mTotal length
  • 2,248,223Total average daily traffic
  • 163,574Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sunrise
  • No street view available for this location

New bridges in Sunrise, FL - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 51970-1979
  • 711980-1989
  • 31990-1999
  • 72010-2019
  • 12020-2022
Reconstructed bridges in Sunrise, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 61990-1999
Average Bridge Daily Traffic in Sunrise, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.7%Excellent
  • 80.0%Good
  • 8.6%Satisfactory
  • 5.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.7%Excellent
  • 5.7%Very good
  • 57.1%Good
  • 25.7%Satisfactory
  • 5.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.7%Excellent
  • 31.4%Very good
  • 48.6%Good
  • 14.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 7.1%Very good
  • 78.6%Good
  • 7.1%Satisfactory
Find on map >>   Show street view

Structure Number: 860387,  Location: I-595 & I-75 INTERCHANGE (Lat: 26.119692,  Lng: -80.343550),  Route carried "under" structure: State highway 869,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2022),  Truck Traffic: 6%,  Features Intersected: I-75 & I-75 Connectors,  Facility Carried by Structure: I595 WB to I75 SB
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.898,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 60.4m (198.2ft)

Find on map >>   Show street view

Structure Number: 860387,  Location: I-595 & I-75 INTERCHANGE (Lat: 26.119692,  Lng: -80.343550),  Route carried "under" structure: State highway 84,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2022),  Truck Traffic: 7%,  Features Intersected: I-75 & I-75 Connectors,  Facility Carried by Structure: I595 WB to I75 SB
Minimum Vertical Clearance: 8.26m (27.10ft),  Kilometerpoint: 7.194,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 60.4m (198.2ft)

Find on map >>   Show street view

Structure Number: 860482,  Location: 2.2 MI S OF OAKLND PK BLV (Lat: 26.146708,  Lng: -80.341689),  Route carried "under" structure: State highway 838,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 53,500 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 838 SUNRISE BLVD,  Facility Carried by Structure: SR869 NB SAW 1.04
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 1.674,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 860483,  Location: 2.2 MI S of Oakland Blvd (Lat: 26.146861,  Lng: -80.342025),  Route carried "under" structure: State highway 838,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 53,500 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 838 SUNRISE BLVD,  Facility Carried by Structure: SR869 SB SAW 1.04
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 1.674,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 860484,  Location: INTER SR-869 AND SR-816 (Lat: 26.170008,  Lng: -80.316972),  Route carried "under" structure: State highway 816,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 45,800 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 816 OAKLAND PK BLVD,  Facility Carried by Structure: SR869 NB SAW 3.27
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 5.251,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 860485,  Location: INTER. SR-869 AND SR-816 (Lat: 26.170253,  Lng: -80.317231),  Route carried "under" structure: State highway 816,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 45,800 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 816 OAKLAND PK BLVD,  Facility Carried by Structure: SR869 SB SAW 3.27
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 5.251,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 860486,  Location: INTER SR-869 AND SR-870 (Lat: 26.193742,  Lng: -80.294972),  Route carried "under" structure: State highway 870,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 41,850 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 870 COMMERCIAL BLVD,  Facility Carried by Structure: SR869 SB SAW 5.46
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 8.756,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 860487,  Location: INTERS.SR-869 AND SR-870 (Lat: 26.193711,  Lng: -80.294594),  Route carried "under" structure: State highway 870,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 41,850 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 870 COMMERCIAL BLVD,  Facility Carried by Structure: SR869 NB SAW 5.46
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 8.756,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 860509,  Location: I-595/I-75 INTERCHANGE (Lat: 26.122917,  Lng: -80.345694),  Route carried "under" structure: State highway 84,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 4%,  Features Intersected: SR-84 WB & NEW RIVER,  Facility Carried by Structure: SR-869SB to I-75NB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 12.340,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 7,800 (year 2020),  Truck Traffic: 8%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 13.14m (43.11ft),  Kilometerpoint: 0.108,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 8.50m (27.89ft),  Kilometerpoint: 1.242,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 39,500 (year 2018),  Truck Traffic: 6%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 8.60m (28.22ft),  Kilometerpoint: 0.355,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2020),  Truck Traffic: 8%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.632,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 0.280,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.655,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860511,  Location: I-75 & I-595 Interchange (Lat: 26.120856,  Lng: -80.344992),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 162,500 (year 2017),  Truck Traffic: 6%,  Features Intersected: I-75 Cnctrs & New River,  Facility Carried by Structure: SB-869 To EB I-595
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 0.355,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 59.5m (195.2ft)

Find on map >>   Show street view

Structure Number: 860512,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.120556,  Lng: -80.347472),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-75 CONNCTRS &NEW RIVER
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 1.590,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: 860512,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.120556,  Lng: -80.347472),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: I-75 CONNCTRS &NEW RIVER
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 1.215,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: 860512,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.120556,  Lng: -80.347472),  Route carried "under" structure: Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 52,500 (year 2020),  Truck Traffic: 7%,  Features Intersected: I-75 CONNCTRS &NEW RIVER
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 19.401,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: 860512,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.120556,  Lng: -80.347472),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: I-75 CONNCTRS &NEW RIVER
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 1.197,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: 860512,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.120556,  Lng: -80.347472),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: I-75 CONNCTRS &NEW RIVER
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: 860512,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.120556,  Lng: -80.347472),  Route carried "under" structure: State highway 84,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 4%,  Features Intersected: I-75 CONNCTRS &NEW RIVER,  Facility Carried by Structure: I-75 SB TO 869 NB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 12.134,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: 860515,  Location: I-595/I-75 INTERCHANGE (Lat: 26.117119,  Lng: -80.348947),  Route carried "under" structure: Interstate 75,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 26,250 (year 2020),  Truck Traffic: 7%,  Features Intersected: SR-93(I-75) NB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 19.003,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 55.8m (183.1ft)

Find on map >>   Show street view

Structure Number: 860516,  Location: I-595&I-75 INTERCHANGE (Lat: 26.119694,  Lng: -80.346972),  Route carried "under" structure: Interstate 75,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: I75 connectors&EB SR-84
Minimum Vertical Clearance: 8.60m (28.22ft),  Kilometerpoint: 1.576,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 860516,  Location: I-595&I-75 INTERCHANGE (Lat: 26.119694,  Lng: -80.346972),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 13%,  Features Intersected: I75 connectors&EB SR-84
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 1.775,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 860516,  Location: I-595&I-75 INTERCHANGE (Lat: 26.119694,  Lng: -80.346972),  Route carried "under" structure: State highway 84,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 3%,  Features Intersected: I75 connectors&EB SR-84,  Facility Carried by Structure: SB 869 TO SB I-75
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 7.578,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 860517,  Location: I-595 / I-75 Interchange (Lat: 26.122753,  Lng: -80.345139),  Route carried "under" structure: State highway 84,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 4%,  Features Intersected: WB SR-84 & N. New River,  Facility Carried by Structure: SB 869 to SB I-75
Minimum Vertical Clearance: 6.77m (22.21ft),  Kilometerpoint: 12.258,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 860518,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.119306,  Lng: -80.345222),  Route carried "under" structure: State highway 84,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2022),  Truck Traffic: 3%,  Features Intersected: EB SR84 & I75 Connectors,  Facility Carried by Structure: NB I-75 TO NBSR869
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 7.770,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 860518,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.119306,  Lng: -80.345222),  Route carried "under" structure: Ramp State highway 84,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2022),  Truck Traffic: 7%,  Features Intersected: EB SR84 & I75 Connectors,  Facility Carried by Structure: NB I-75 TO NBSR869
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.002,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 860518,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.119306,  Lng: -80.345222),  Route carried "under" structure: Interstate 75,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2022),  Truck Traffic: 13%,  Features Intersected: EB SR84 & I75 Connectors
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 1.777,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 860518,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.119306,  Lng: -80.345222),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2022),  Truck Traffic: 12%,  Features Intersected: EB SR84 & I75 Connectors
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 1.423,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 860518,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.119306,  Lng: -80.345222),  Route carried "under" structure: Other road 595,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2022),  Truck Traffic: 10%,  Features Intersected: EB SR84 & I75 Connectors,  Facility Carried by Structure: NB I-75 TO NBSR869
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 860518,  Location: I-75 & I-595 INTERCHANGE (Lat: 26.119306,  Lng: -80.345222),  Route carried "under" structure: Other road 595,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 10%,  Features Intersected: EB SR84 & I75 Connectors,  Facility Carried by Structure: NB I-75 TO NBSR869
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 860671,  Location: 4.0 Mi N of SR-818 (Lat: 26.118567,  Lng: -80.346775),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: I75 SR84 & SR869
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.819,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 860671,  Location: 4.0 Mi N of SR-818 (Lat: 26.118567,  Lng: -80.346775),  Route carried "under" structure: Ramp State highway 84,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2017),  Truck Traffic: 2%,  Features Intersected: I75 SR84 & SR869,  Facility Carried by Structure: I-75 to I-595 RvLn
Minimum Vertical Clearance: 14.51m (47.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 860671,  Location: 4.0 Mi N of SR-818 (Lat: 26.118567,  Lng: -80.346775),  Route carried "under" structure: Interstate 75,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 26,250 (year 2020),  Truck Traffic: 7%,  Features Intersected: I75 SR84 & SR869
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 18.984,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 860671,  Location: 4.0 Mi N of SR-818 (Lat: 26.118567,  Lng: -80.346775),  Route carried "under" structure: State highway 84,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 3%,  Features Intersected: I75 SR84 & SR869,  Facility Carried by Structure: I-75 to I-595 RvLn
Minimum Vertical Clearance: 12.80m (41.99ft),  Kilometerpoint: 7.662,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 861,  Location: 0.4 MI N OF SAWGRASS TOLL (Lat: 26.161469,  Lng: -80.327567),  Route carried "under" structure: State highway 869,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 92,800 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR-869 & PANTHER DR
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 3.903,  Lanes on structure: 2,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 63.4m (208.0ft)

Discuss Sunrise, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.