Bridge Statistics for Spokane, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 164Number of bridges
  • 3,543ft / 1,080mTotal length
  • $877,961,000Total costs
  • 3,701,590Total average daily traffic
  • 278,995Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Spokane
  • No street view available for this location

New bridges in Spokane, WA - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 221910-1919
  • 21920-1929
  • 41930-1939
  • 31940-1949
  • 211950-1959
  • 491960-1969
  • 311970-1979
  • 51980-1989
  • 61990-1999
  • 32000-2009
  • 122010-2019
  • 22020-2022
Reconstructed bridges in Spokane, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Spokane, WA
Average Bridge Truck Traffic in Spokane, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.4%Very good
  • 38.0%Good
  • 27.2%Satisfactory
  • 6.5%Fair
  • 6.5%Poor
  • 4.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.4%Very good
  • 32.6%Good
  • 37.0%Satisfactory
  • 10.9%Fair
  • 1.1%Poor
  • 1.1%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.0%Very good
  • 45.7%Good
  • 31.5%Satisfactory
  • 6.5%Fair
  • 2.2%Poor
  • 1.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 63.3%Very good
  • 30.0%Good
  • 6.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 37.5%Very good
  • 37.5%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 5258A,  Location: 0.4 N SR 90 (Lat: 47.659372,  Lng: -117.434931),  Route carried "on" structure: City street 816,  Year Built: 1958,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 52.40m (171.92ft),  Average Daily Traffic: 45,696 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 70,245 (year 2038),  Design Load: HS 20,  Features Intersected: SPOKANE RIVER,  Facility Carried by Structure: MAPLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 14,  Number Of Approach Spans: 5,  Length of Maximum Span: 46.6m (152.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 52.43m (172.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,017,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,526,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5453A,  Location: 1.7 E JCT US 2 (Lat: 47.653958,  Lng: -117.375583),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 119,564 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 153,998 (year 2039),  Design Load: HS 20,  Features Intersected: S ALTAMONT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 455.493,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 32.6m (107.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,373,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $2,746,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5453C,  Location: 2.3 E JCT US 2 (Lat: 47.653778,  Lng: -117.360389),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 14,200 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,079 (year 2036),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: THOR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,389,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $2,778,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5453D,  Location: 2.4 E JCT US 2 (Lat: 47.653778,  Lng: -117.357694),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 15,400 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,053 (year 2036),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: FREYA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.246,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,389,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $2,778,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5453E,  Location: 3.0 E JCT US 2 (Lat: 47.653889,  Lng: -117.347333),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 127,505 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 164,226 (year 2039),  Design Load: HS 20,  Features Intersected: S HAVANA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 457.601,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 31.2m (102.4ft),  Out-to-Out Width: 32.5m (106.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,373,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $2,746,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6579A,  Location: 0.4 E JCT US 195 (Lat: 47.647583,  Lng: -117.448944),  Route carried "on" structure: Interstate 90,  Year Built: 1963,  Status: Open,  Structure Length: 37.25m (122.21ft),  Average Daily Traffic: 43,937 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 56,590 (year 2039),  Design Load: HS 20,  Features Intersected: HANGMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 449.796,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 66.4m (217.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Very good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.25m (122.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $14,175,000,  Roadway Improvement Cost: $2,835,000,  Total Project Cost: $28,350,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6579B,  Location: 0.4 E JCT US 195 (Lat: 47.647722,  Lng: -117.449083),  Route carried "on" structure: Interstate 90,  Year Built: 1963,  Status: Open,  Structure Length: 37.25m (122.21ft),  Average Daily Traffic: 43,937 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 56,590 (year 2039),  Design Load: HS 20,  Features Intersected: HANGMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 449.796,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 66.4m (217.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.25m (122.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $11,242,000,  Roadway Improvement Cost: $2,248,000,  Total Project Cost: $22,485,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6822A,  Location: 3.5 E JCT SR 902 (Lat: 47.619750,  Lng: -117.502583),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 7,361 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,081 (year 2038),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,960,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $3,919,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6875A,  Location: 16.3 E LINCOLN CO (Lat: 47.633639,  Lng: -117.480556),  Route carried "on" structure: US 2,  Year Built: 1962,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 9,939 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,801 (year 2039),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 455.718,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.71m (25.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,923,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $3,846,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6875B,  Location: 16.3 E LINCOLN CO (Lat: 47.633778,  Lng: -117.480361),  Route carried "on" structure: US 2,  Year Built: 1962,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 9,939 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,801 (year 2039),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 455.718,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $1,512,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $3,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6875C,  Location: 4.7 E JCT SR 902 (Lat: 47.631250,  Lng: -117.483644),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 24,201 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 31,170 (year 2039),  Design Load: HS 20,  Features Intersected: GARDEN SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 446.609,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $2,520,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6875D,  Location: 4.7 E JCT SR 902 (Lat: 47.631500,  Lng: -117.483694),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 24,201 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 31,170 (year 2039),  Design Load: HS 20,  Features Intersected: GARDEN SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 446.609,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,980,000,  Roadway Improvement Cost: $396,000,  Total Project Cost: $3,960,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6896B,  Location: 1.5 E JCT US 2 (Lat: 47.645639,  Lng: -117.452472),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 1,550 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,108 (year 2036),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: LINDEKE ST
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 67.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,761,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $3,522,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6956A,  Location: 1.4 E JCT US 2 (Lat: 47.645000,  Lng: -117.455000),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Closed,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 600 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 834 (year 2036),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: ROSAMOND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.382,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,440,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $2,880,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7072A,  Location: 0.5 E JCT US 2 (Lat: 47.637250,  Lng: -117.471917),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 966 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,301 (year 2040),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: GARDEN SPRING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,440,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $2,880,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7094A,  Location: 29.0 N WHITMAN CO (Lat: 47.646444,  Lng: -117.451083),  Route carried "on" structure: US 195,  Year Built: 1963,  Status: Posted for load,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 5,367 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,912 (year 2039),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 154.417,  Lanes on structure: 1,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 20.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,296,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $2,592,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7094B,  Location: 29.0 N WHITMAN CO (Lat: 47.646361,  Lng: -117.451250),  Route carried "on" structure: US 195,  Year Built: 1963,  Status: Posted for load,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 5,367 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,912 (year 2039),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 154.417,  Lanes on structure: 1,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 20.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,296,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $2,592,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7317A,  Location: 15.2 E LINCOLN CO (Lat: 47.642592,  Lng: -117.501125),  Route carried "on" structure: US 2,  Year Built: 1964,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 14,800 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,062 (year 2039),  Design Load: HS 20,  Features Intersected: W AIRPORT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.883,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,112,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7317B,  Location: 15.2 E LINCOLN CO (Lat: 47.642747,  Lng: -117.500925),  Route carried "on" structure: US 2,  Year Built: 1964,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 14,800 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,062 (year 2039),  Design Load: HS 20,  Features Intersected: W AIRPORT DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.883,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.24m (13.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,112,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $2,224,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7317C,  Location: 16.0 E LINCOLN CO (Lat: 47.637778,  Lng: -117.490000),  Route carried "on" structure: US 2,  Year Built: 1964,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 20,141 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,941 (year 2039),  Design Load: HS 20,  Features Intersected: GEIGER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 454.881,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,269,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,538,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7317D,  Location: 16.0 E LINCOLN CO (Lat: 47.637917,  Lng: -117.489889),  Route carried "on" structure: US 2,  Year Built: 1964,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 20,141 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,941 (year 2039),  Design Load: HS 20,  Features Intersected: GEIGER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 454.881,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,269,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,538,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7630A,  Location: 12.3 E JCT I-90 (Lat: 47.592167,  Lng: -117.565472),  Route carried "on" structure: State highway 902,  Year Built: 1965,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 5,301 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,141 (year 2040),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.827,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,924,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $3,848,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7841A,  Location: 0.8 E JCT US 195 (Lat: 47.651506,  Lng: -117.435803),  Route carried "on" structure: Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 88.09m (289.01ft),  Average Daily Traffic: 100,158 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 129,003 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CITY STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 450.874,  Lanes on structure: 6,  Lanes under structure: 22,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.0m (105.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 30.4m (99.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 88.09m (289.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $61,846,000,  Roadway Improvement Cost: $12,369,000,  Total Project Cost: $123,692,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7954A,  Location: 1.3 E JCT US 195 (Lat: 47.652672,  Lng: -117.422242),  Route carried "on" structure: Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 84.28m (276.51ft),  Average Daily Traffic: 100,158 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 129,003 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: VIADUCT STA 1396 US 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 451.904,  Lanes on structure: 8,  Lanes under structure: 23,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 22,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 34.1m (111.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 84.28m (276.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $67,466,000,  Roadway Improvement Cost: $13,493,000,  Total Project Cost: $134,932,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7954B,  Location: 1.9 E JCT US 195 (Lat: 47.652539,  Lng: -117.414033),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 15.00m (49.21ft),  Average Daily Traffic: 9,611 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,378 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BROWNE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.00m (49.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,460,000,  Roadway Improvement Cost: $492,000,  Total Project Cost: $4,920,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7954C,  Location: 1.9 E JCT US 195 (Lat: 47.652356,  Lng: -117.412592),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 11.61m (38.09ft),  Average Daily Traffic: 14,446 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,606 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: DIVISION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.61m (38.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,667,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $5,334,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7996A,  Location: 10.0 N JCT US 2 (Lat: 47.782861,  Lng: -117.530611),  Route carried "on" structure: State highway 291,  Year Built: 1966,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 8,401 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,820 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: LITTLE SPOKANE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.158,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Bridge Improvement Cost: $1,080,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,160,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8288A,  Location: 1.7 E JCT US 195 (Lat: 47.652894,  Lng: -117.414594),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 14.75m (48.39ft),  Average Daily Traffic: 8,435 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,864 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MCCLELLAN ST, BERNARD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.75m (48.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,226,000,  Roadway Improvement Cost: $445,000,  Total Project Cost: $4,453,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8307A,  Location: 1.5 E JCT US 195 (Lat: 47.652889,  Lng: -117.421278),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 7,876 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,144 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: HOWARD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.71m (25.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,265,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $2,530,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8322A,  Location: 1.0 E JCT US 195 (Lat: 47.652472,  Lng: -117.431417),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 10.91m (35.79ft),  Average Daily Traffic: 4,577 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,895 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: PARKING LOT,  Facility Carried by Structure: JEFFERSON-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,647,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $3,294,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8322B,  Location: 1.1 E JCT US 195 (Lat: 47.651861,  Lng: -117.432250),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 12,131 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,624 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: PARKING AREA,  Facility Carried by Structure: WALNUT-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,653,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $5,306,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8322C,  Location: 1.2 E JCT US 195 (Lat: 47.652806,  Lng: -117.428917),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 11,415 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,702 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CITY STREET (JEFFERSON),  Facility Carried by Structure: W-CEDAR RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.11m (26.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,915,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $3,830,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8322D,  Location: 1.2 E JCT US 195 (Lat: 47.652306,  Lng: -117.428597),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1967,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 6,242 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,039 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CITY STREET (4TH AVE),  Facility Carried by Structure: FOURTH-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $853,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8611A,  Location: 0.4 E JCT US 2 (Lat: 47.651944,  Lng: -117.403139),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 7,800 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,725 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-90,  Facility Carried by Structure: SHERMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,530,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $3,060,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8611B,  Location: 0.7 E JCT US 2 (Lat: 47.651889,  Lng: -117.395250),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 6,150 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,287 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-90,  Facility Carried by Structure: ARTHUR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,098,000,  Roadway Improvement Cost: $420,000,  Total Project Cost: $4,195,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8774A,  Location: 0.8 E JCT US 2 (Lat: 47.652278,  Lng: -117.394333),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 20.45m (67.09ft),  Average Daily Traffic: 104,436 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 134,513 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 3RD AV & W-E RAMP
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 454.012,  Lanes on structure: 6,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 32 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 36.0m (118.1ft),  Out-to-Out Width: 37.6m (123.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 17.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.45m (67.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $8,723,000,  Roadway Improvement Cost: $1,745,000,  Total Project Cost: $17,446,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete