Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rancho Cucamonga, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 155Number of bridges
  • 1,831ft / 558mTotal length
  • 7,745,903Total average daily traffic
  • 493,264Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rancho Cucamonga
  • No street view available for this location

New bridges in Rancho Cucamonga, CA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 31960-1969
  • 531970-1979
  • 221980-1989
  • 151990-1999
  • 522000-2009
  • 82010-2019
Reconstructed bridges in Rancho Cucamonga, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 11980-1989
  • 51990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Rancho Cucamonga, CA
Average Bridge Truck Traffic in Rancho Cucamonga, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.3%Good
  • 32.5%Fair
  • 1.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 68.8%Good
  • 31.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 98.8%Good
  • 1.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 69.0%Excellent
  • 24.1%Very good
  • 6.9%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 45.8%Good
  • 54.2%Satisfactory
Find on map >>   Show street view

Structure Number: 54 1157R,  Location: 08-SBD-210-8.66-RCUC (Lat: 34.136333,  Lng: -117.545586),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,400 (year 2014),  Truck Traffic: 5%,  Features Intersected: ROCHESTER AVENUE,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.2m (118.8ft)

Find on map >>   Show street view

Structure Number: 54 1158L,  Location: 08-SBD-210-9.14-RCUC (Lat: 34.136547,  Lng: -117.537125),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2014),  Truck Traffic: 5%,  Features Intersected: DAY CREEK BLVD,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 54 1158R,  Location: 08-SBD-210-9.14-RCUC (Lat: 34.136281,  Lng: -117.537136),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2014),  Truck Traffic: 5%,  Features Intersected: DAY CREEK BLVD,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 54 1289K,  Location: 08-SBD-015-6.74-RCUC (Lat: 34.121228,  Lng: -117.515203),  Route carried "under" structure: City street R060,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 2012),  Truck Traffic: 3%,  Features Intersected: BASELINE ROAD,  Facility Carried by Structure: S15 ON RAMP
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 54 1290K,  Location: 08-SBD-015-6.85-RCUC (Lat: 34.122697,  Lng: -117.514806),  Route carried "under" structure: City street ,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2012),  Truck Traffic: 2%,  Features Intersected: EAST AVENUE,  Facility Carried by Structure: S15 OFF RAMP
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 54C0608,  Location: 0.3 MI N OF RTE 66 (Lat: 34.110269,  Lng: -117.612219),  Route carried "under" structure: City street ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 28,800 (year 2007),  Truck Traffic: 1%,  Features Intersected: CARNELIAN STREET,  Facility Carried by Structure: PEDESTRIAN ACCESS
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.080,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 54C0732,  Location: 0.21 MI S/O JERSEY BLVD (Lat: 34.091922,  Lng: -117.557811),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2012),  Truck Traffic: 7%,  Features Intersected: MILIKEN AVENUE,  Facility Carried by Structure: BNSF & METROLINK
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.050,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 54C0733,  Location: 0.2 MI S/O JERSEY BLVD (Lat: 34.092369,  Lng: -117.557578),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2012),  Truck Traffic: 7%,  Features Intersected: MILIKEN AVENUE,  Facility Carried by Structure: BNSF & METROLINK
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.060,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 54C0735,  Location: 0.2 MI S/O JERSEY BLVD (Lat: 34.091844,  Lng: -117.576111),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2012),  Truck Traffic: 3%,  Features Intersected: HAVEN AVENUE,  Facility Carried by Structure: BNSF & METROLINK
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.040,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: 54C0771,  Location: PACIFIC TRAIL AT FOOTHILL (Lat: 34.104764,  Lng: -117.620569),  Route carried "under" structure: City street ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 23,633 (year 2013),  Truck Traffic: 3%,  Features Intersected: FOOTHILL BLVD,  Facility Carried by Structure: FOOTHILL BLVD POC
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.100,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.8m (150.3ft)

Discuss Rancho Cucamonga, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.