Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Prichard, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 85Number of bridges
  • 1,900ft / 579mTotal length
  • $225,420,000Total costs
  • 989,030Total average daily traffic
  • 91,960Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Prichard
  • No street view available for this location

New bridges in Prichard, AL - historical statistics
  • New bridges - historical statistics
  • 91930-1939
  • 41940-1949
  • 201960-1969
  • 151970-1979
  • 251990-1999
  • 112000-2009
  • 12010-2019
Reconstructed bridges in Prichard, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 31950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
Average Bridge Daily Traffic in Prichard, AL
Average Bridge Truck Traffic in Prichard, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 43.1%Good
  • 33.3%Satisfactory
  • 21.6%Fair
  • 2.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.8%Very good
  • 51.0%Good
  • 25.5%Satisfactory
  • 13.7%Fair
  • 2.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.9%Very good
  • 43.1%Good
  • 15.7%Satisfactory
  • 19.6%Fair
  • 13.7%Poor
  • 2.0%Serious
  • 2.0%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 26.7%Good
  • 31.1%Satisfactory
  • 31.1%Fair
  • 2.2%Poor
  • 2.2%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Good
  • 62.5%Satisfactory
  • 18.8%Fair
  • 6.3%Poor
Find on map >>   Show street view

Structure Number: 867,  Location: 0.5 MI NW COUNTY RT296 (Lat: 34.403025,  Lng: -86.624069),  Route carried "on" structure: County highway 407,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 10 (year 1985),  Average Future Daily Traffic: 25 (year 2041),  Design Load: H 10,  Features Intersected: COTACO CREEK,  Facility Carried by Structure: FORMAN BOTTOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $233,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1124,  Location: 0.9 MI N JCT SR 35 (Lat: 34.636942,  Lng: -86.271083),  Route carried "on" structure: County highway 63,  Year Built: 1934,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 182 (year 1989),  Truck Traffic: 7%,  Average Future Daily Traffic: 235 (year 2039),  Design Load: H 10,  Features Intersected: COTTON COVE CREEK,  Facility Carried by Structure: CO RT 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1143,  Location: 2.3 MI NW HAZEL GREEN (Lat: 34.947144,  Lng: -86.608114),  Route carried "on" structure: County highway 262,  Year Built: 1934,  Status: Posted for load,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,855 (year 2040),  Design Load: H 15,  Features Intersected: COPELAND CREEK,  Facility Carried by Structure: CHARITY LA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1558,  Location: 5.5 MI. W. JCT. CO.RD. 10 (Lat: 34.904619,  Lng: -87.985922),  Route carried "on" structure: County highway 14,  Year Built: 1937,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 505 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,010 (year 2030),  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 25.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1572,  Location: 1.3 MI E JCT CO RT 57 (Lat: 34.513333,  Lng: -87.136667),  Route carried "on" structure: County highway 28,  Year Built: 1963,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 90 (year 1989),  Average Future Daily Traffic: 150 (year 2034),  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $449,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1856,  Location: 0.1 MI JCT CO RD 324 (Lat: 34.919275,  Lng: -86.503414),  Route carried "on" structure: County highway 261,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 595 (year 2034),  Design Load: H 15,  Features Intersected: UPPER CREEK,  Facility Carried by Structure: UPCREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2116,  Location: 2 MI S CO RD 55 (Lat: 30.823097,  Lng: -88.165658),  Route carried "on" structure: US 45,  Year Built: 1931,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 10,232 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 15,348 (year 2039),  Design Load: H 15,  Features Intersected: MAGEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.235,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $446,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2751,  Location: 0.4 MI N US 45 (Lat: 30.721667,  Lng: -88.080000),  Route carried "on" structure: City street ,  Year Built: 1943,  Status: Closed,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 11,232 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,736 (year 2040),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: CRAFT HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2941,  Location: 0.8 MI W WASSON AVE (Lat: 30.763333,  Lng: -88.113333),  Route carried "on" structure: City street ,  Year Built: 1946,  Status: Posted for load,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 11,607 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,294 (year 2041),  Design Load: H 15,  Features Intersected: EIGHT MILE CREEK,  Facility Carried by Structure: WHISTLER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 11.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,455,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,601,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3206,  Location: 0.3 MI W US 45 (Lat: 30.750000,  Lng: -88.120000),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,340 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,446 (year 2041),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: WOLF RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 21.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $321,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3217,  Location: 0.6 MI N TURNER RD (Lat: 30.761667,  Lng: -88.100000),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,473 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,462 (year 2042),  Design Load: H 15,  Features Intersected: GUM TREE BRANCH,  Facility Carried by Structure: WASSON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 12.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: January 2022,  Underwater Inspection Date: July 2018,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $331,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7204,  Location: 0.7 MI N I-65 (Lat: 30.749050,  Lng: -88.113867),  Route carried "on" structure: US 45,  Year Built: 1931,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 25,569 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 38,354 (year 2039),  Design Load: H 15,  Features Intersected: PETERSON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.105,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,916,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $4,308,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7205,  Location: 0.7 MI N SR 213 (Lat: 30.770339,  Lng: -88.134561),  Route carried "on" structure: US 45,  Year Built: 1931,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 5,963 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,945 (year 2038),  Design Load: H 15,  Features Intersected: MYERS STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.179,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $513,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $564,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7206,  Location: 1 MI N SR 213 (Lat: 30.773528,  Lng: -88.138058),  Route carried "on" structure: US 45,  Year Built: 1931,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,086 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,129 (year 2038),  Design Load: H 15,  Features Intersected: CRYSTAL SPRINGS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.666,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7674,  Location: JCT I-65 * US 45 (Lat: 30.740261,  Lng: -88.107394),  Route carried "on" structure: US 45,  Year Built: 1962,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 9,242 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,863 (year 2038),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.08m (33.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,110,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7675,  Location: JCT I-65 * US 45 (Lat: 30.740344,  Lng: -88.107297),  Route carried "on" structure: US 45,  Year Built: 1962,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 9,242 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,863 (year 2038),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.08m (33.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,110,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7711,  Location: 0.3 MI W TELEGRAPH RD (Lat: 30.750000,  Lng: -88.081667),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 250 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 375 (year 2042),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: E PETAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $272,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8579,  Location: 1.3 MI N SR 17 (Lat: 30.755364,  Lng: -88.093489),  Route carried "on" structure: Interstate 65,  Year Built: 1965,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 70,680 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 106,020 (year 2038),  Design Load: HS 20,  Features Intersected: GUM TREE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.632,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,674,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $2,941,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 867,  Location: 0.8 MI E US45 (Lat: 30.735000,  Lng: -88.088333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.58m (1.90ft),  Average Daily Traffic: 4,138 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,793 (year 2042),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: PRICHARD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $347,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8781,  Location: 0.3 MI W WASSON AVE (Lat: 30.761667,  Lng: -88.105000),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 493 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 750 (year 2041),  Design Load: H 15,  Features Intersected: PETERSON BRANCH,  Facility Carried by Structure: WARREN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Serious,  Culverts: Poor,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $432,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9445,  Location: 1.7 MI E US 45 (Lat: 30.802983,  Lng: -88.125222),  Route carried "on" structure: State highway 158,  Year Built: 1967,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 13,992 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 20,988 (year 2039),  Design Load: HS 20,  Features Intersected: COLLEGE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.511,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,361,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9707,  Location: 400' E CRAFT HWY (Lat: 30.750000,  Lng: -88.081667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 350 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 500 (year 2042),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: HAIG ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,475,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $2,723,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10963,  Location: 0.17 MI N E WHISTLER ST (Lat: 30.749700,  Lng: -88.093200),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,404 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,582 (year 2041),  Design Load: H 15,  Features Intersected: GUM TREE BRANCH,  Facility Carried by Structure: TURNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $571,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11196,  Location: 0.1 MI E GARRISON AVE (Lat: 30.729700,  Lng: -88.094453),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 838 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,249 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: COLLEGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $289,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11204,  Location: 0.2 MI E US 45 (Lat: 30.731039,  Lng: -88.094150),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,071 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,900 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: W CLARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 23.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $293,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11207,  Location: 0.3 MI E US 45 (Lat: 30.734017,  Lng: -88.096250),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 904 (year 2022),  Average Future Daily Traffic: 1,347 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: GARRISON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $293,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11214,  Location: 0.2 MI E US 45 (Lat: 30.743333,  Lng: -88.101667),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 446 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 664 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: THOMAS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $239,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11227,  Location: 0.2 MI S MAGEE ST (Lat: 30.743333,  Lng: -88.101667),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 861 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,258 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: ROSEDALE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $245,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11229,  Location: 0.3 MI E US 45 (Lat: 30.741667,  Lng: -88.100000),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 400 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: FIRST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $239,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11231,  Location: 0.3 MI E US 45 (Lat: 30.741667,  Lng: -88.098333),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 400 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 575 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: GRANT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $239,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11234,  Location: 0.1 MI S MAGEE ST (Lat: 30.740000,  Lng: -88.098333),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 188 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 275 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: NEELEY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $238,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1124,  Location: 0.1 MI S MAGEE ST (Lat: 30.740000,  Lng: -88.098333),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 271 (year 2022),  Average Future Daily Traffic: 404 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: STRAUSS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 69.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $320,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11245,  Location: 0.2 MI E US 45 (Lat: 30.728819,  Lng: -88.094403),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 617 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 919 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: CHASTANG AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $293,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1143,  Location: 0.3 MI N US 45 (Lat: 30.741667,  Lng: -88.098333),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Posted for load,  Structure Length: 0.56m (1.84ft),  Average Daily Traffic: 1,454 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,036 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: RICH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.6m (18.4ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $182,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $200,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11445,  Location: 0.17 MI N US 45 (Lat: 30.731667,  Lng: -88.090000),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Closed,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 3,072 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,577 (year 2042),  Design Load: HS 20,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: W SWEENEY'S LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Critical,  Channel: Very good,  Operating Rating: 26.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12142,  Location: 0.1 MI E US 45 (Lat: 30.735000,  Lng: -88.095000),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 4,951 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,932 (year 2042),  Design Load: HS 20,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: PRICHARD AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $481,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12194,  Location: 3000' S PRICHARD AVE (Lat: 30.723333,  Lng: -88.085000),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,556 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,579 (year 2042),  Design Load: HS 20,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: WILSON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.079,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,060,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,166,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15502,  Location: 0.6 MI N US 45 (Lat: 30.746447,  Lng: -88.101061),  Route carried "on" structure: Interstate 65,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 80,762 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 121,143 (year 2038),  Design Load: HS 20,  Features Intersected: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.445,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.6m (143.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 43.6m (143.0ft),  Out-to-Out Width: 45.3m (148.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.17m (20.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,265,000,  Roadway Improvement Cost: $627,000,  Total Project Cost: $6,892,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15504,  Location: 0.9 MI N US 45 (Lat: 30.750433,  Lng: -88.097094),  Route carried "on" structure: Interstate 65,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 10.94m (35.89ft),  Average Daily Traffic: 40,381 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 60,572 (year 2038),  Design Load: HS 20,  Features Intersected: TURNER RD * WHISTLER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.041,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 18.2m (59.7ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.83m (38.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,031,000,  Roadway Improvement Cost: $503,000,  Total Project Cost: $5,534,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Prichard, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.