Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Poteau, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 63Number of bridges
  • 699ft / 213mTotal length
  • $61,026,000Total costs
  • 259,664Total average daily traffic
  • 36,080Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Poteau
  • No street view available for this location

New bridges in Poteau, OK - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81930-1939
  • 71940-1949
  • 31950-1959
  • 51960-1969
  • 91970-1979
  • 21980-1989
  • 51990-1999
  • 222000-2009
  • 12020-2022
Reconstructed bridges in Poteau, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Poteau, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 30.0%Good
  • 33.3%Satisfactory
  • 13.3%Fair
  • 3.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 43.3%Very good
  • 23.3%Good
  • 23.3%Satisfactory
  • 6.7%Fair
  • 3.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Very good
  • 33.3%Good
  • 20.0%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
  • 3.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.2%Excellent
  • 6.1%Very good
  • 34.7%Good
  • 42.9%Satisfactory
  • 4.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 37.0%Good
  • 7.4%Satisfactory
  • 18.5%Fair
  • 3.7%Poor
Find on map >>   Show street view

Structure Number: 25658,  Location: 0.20 E JCT US-271 (Lat: 35.096667,  Lng: -94.628889),  Route carried "on" structure: State highway 112,  Year Built: 2000,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,440 (year 2040),  Design Load: HS 20,  Features Intersected: KANSAS CITY SOUTHERN R.R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.91m (22.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $961,000,  Total Project Cost: $1,631,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25659,  Location: JCT US-59/SH-112 (Lat: 35.094744,  Lng: -94.632236),  Route carried "on" structure: State highway 112,  Year Built: 2000,  Status: Open,  Structure Length: 6.90m (22.64ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,440 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 59 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.51m (31.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $767,000,  Roadway Improvement Cost: $1,265,000,  Total Project Cost: $2,147,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2568,  Location: 3.50 N JCT US-271 (Lat: 35.080106,  Lng: -94.640767),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 18,080 (year 2040),  Design Load: HL 93,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.064,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 75.0m (246.1ft),  Out-to-Out Width: 75.6m (248.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.63m (2.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 25681,  Location: 3.30 N JCT US-271 (Lat: 35.079231,  Lng: -94.641142),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 18,080 (year 2040),  Design Load: HL 93,  Features Intersected: POLK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.546,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 130.8m (429.1ft),  Out-to-Out Width: 131.4m (431.1ft)

Condition: Channel: Excellent,  Culverts: Very good,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.84m (2.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $680,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 26391,  Location: 0.80 N JCT US-271 (Lat: 35.041403,  Lng: -94.645358),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 5,750 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,200 (year 2040),  Design Load: HS 20,  Features Intersected: MCMURTREY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.98m (29.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $1,204,000,  Total Project Cost: $2,044,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26392,  Location: 0.80 N JCT US-271 (Lat: 35.041553,  Lng: -94.645567),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 5,650 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,040 (year 2040),  Design Load: HS 20,  Features Intersected: MCMURTREY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.98m (29.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $1,204,000,  Total Project Cost: $2,044,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26393,  Location: 3.10 N JCT US-271 (Lat: 35.076900,  Lng: -94.642119),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 5,750 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,200 (year 2040),  Design Load: HS 20,  Features Intersected: WITTEVILLE ROAD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.987,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $893,000,  Total Project Cost: $1,515,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26394,  Location: 3.10 N JCT US-271 (Lat: 35.076786,  Lng: -94.642367),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 5,650 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,040 (year 2040),  Design Load: HS 20,  Features Intersected: WITTEVILLE ROAD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.027,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $893,000,  Total Project Cost: $1,515,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26539,  Location: JCT US-59/US-271 (Lat: 35.035164,  Lng: -94.646439),  Route carried "on" structure: US 59,  Year Built: 2001,  Status: Open,  Structure Length: 10.56m (34.65ft),  Average Daily Traffic: 5,750 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,200 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 59 /U.S. 271 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.63m (51.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,175,000,  Roadway Improvement Cost: $1,938,000,  Total Project Cost: $3,290,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2654,  Location: JCT US-59/US-271 (Lat: 35.034950,  Lng: -94.646728),  Route carried "on" structure: US 59,  Year Built: 2001,  Status: Open,  Structure Length: 10.56m (34.65ft),  Average Daily Traffic: 5,650 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,040 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 59 /U.S. 271 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.63m (51.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,175,000,  Roadway Improvement Cost: $1,938,000,  Total Project Cost: $3,290,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27122,  Location: 2.47 N JCT US-271 (Lat: 35.065247,  Lng: -94.640867),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 18,080 (year 2040),  Design Load: HL 93,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.973,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 51.8m (169.9ft),  Out-to-Out Width: 52.4m (171.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27123,  Location: 2.76 MI.N.JCT US271 (Lat: 35.074722,  Lng: -94.641389),  Route carried "on" structure: US 59,  Year Built: 2000,  Status: Open,  Structure Length: 1.47m (4.82ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.147,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.5m (14.8ft),  Out-to-Out Width: 67.0m (219.8ft)

Condition: Channel: Excellent,  Culverts: Good,  Inventory Rating: 84.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $225,000
Find on map >>   Show street view

Structure Number: 27349,  Location: 0.2 W.US 271 BYPASS (Lat: 35.076603,  Lng: -94.644239),  Route carried "on" structure: City street E1337,  Year Built: 2006,  Status: Open,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: POLK CREEK,  Facility Carried by Structure: WHITTEVILLE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.758,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,120,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27825,  Location: 13.81 N JCT US-271 (Lat: 35.213000,  Lng: -94.672700),  Route carried "on" structure: US 59,  Year Built: 1997,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HS 20,  Features Intersected: GRIMES HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.220,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 44.5m (146.0ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27952,  Location: 2.5 N; 4.1 W HEAVENER (Lat: 34.927467,  Lng: -94.676708),  Route carried "on" structure: County highway E1440,  Year Built: 2006,  Status: Open,  Structure Length: 1.66m (5.45ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 20,  Features Intersected: THOMPSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.4m (14.4ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 28524,  Location: 1.25 MI N OF DEWEY AV (Lat: 35.060600,  Lng: -94.603514),  Route carried "on" structure: City street 1455,  Year Built: 1998,  Status: Open,  Structure Length: 15.62m (51.25ft),  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,800 (year 2040),  Design Load: HS 20,  Features Intersected: POTEAU RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 43.9m (144.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.62m (51.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $798,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $1,256,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 32934,  Location: 2.4 W OF CAMERON (Lat: 35.085833,  Lng: -94.575556),  Route carried "on" structure: County highway N4750,  Year Built: 2021,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HL 93,  Features Intersected: NAIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.259,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 25659,  Location: JCT US-59/SH-112 (Lat: 35.094744,  Lng: -94.632236),  Route carried "under" structure: US 59,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 7,850 (year 2020),  Truck Traffic: 16%,  Features Intersected: U.S. 59 UNDER,  Facility Carried by Structure: S.H. 112 WB
Minimum Vertical Clearance: 6.13m (20.11ft),  Kilometerpoint: 7.900,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 2566,  Location: JCT US-59/SH-112 (Lat: 35.094461,  Lng: -94.632186),  Route carried "under" structure: US 59,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 7,850 (year 2020),  Truck Traffic: 16%,  Features Intersected: U.S. 59 UNDER,  Facility Carried by Structure: S.H. 112 EB
Minimum Vertical Clearance: 6.13m (20.11ft),  Kilometerpoint: 7.884,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 26393,  Location: 3.10 N JCT US-271 (Lat: 35.076900,  Lng: -94.642119),  Route carried "under" structure: County highway ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: WITTEVILLE ROAD UNDER,  Facility Carried by Structure: U.S. 59 BYPASS
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 4.987,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 26394,  Location: 3.10 N JCT US-271 (Lat: 35.076786,  Lng: -94.642367),  Route carried "under" structure: County highway ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: WITTEVILLE ROAD UNDER,  Facility Carried by Structure: U.S. 59 BYPASS
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 4.987,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 26539,  Location: JCT US-59/US-271 (Lat: 35.035164,  Lng: -94.646439),  Route carried "under" structure: US 59,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,600 (year 2020),  Truck Traffic: 7%,  Features Intersected: U.S. 59 /U.S. 271 UNDER
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 10.218,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 2654,  Location: JCT US-59/US-271 (Lat: 35.034950,  Lng: -94.646728),  Route carried "under" structure: US 59,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2020),  Truck Traffic: 7%,  Features Intersected: U.S. 59 /U.S. 271 UNDER
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 10.202,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Discuss Poteau, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.