Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pasadena, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 201Number of bridges
  • 3,878ft / 1,182mTotal length
  • $3,962,000Total costs
  • 3,776,878Total average daily traffic
  • 269,263Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pasadena
  • No street view available for this location

New bridges in Pasadena, TX - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 361960-1969
  • 551970-1979
  • 311980-1989
  • 441990-1999
  • 122000-2009
  • 102010-2019
  • 122020-2022
Reconstructed bridges in Pasadena, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 31980-1989
  • 51990-1999
  • 92000-2009
  • 12010-2019
  • 162020-2022
Average Bridge Daily Traffic in Pasadena, TX
Average Bridge Truck Traffic in Pasadena, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.7%Very good
  • 48.9%Good
  • 41.1%Satisfactory
  • 4.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.0%Very good
  • 37.6%Good
  • 36.2%Satisfactory
  • 4.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.7%Very good
  • 46.8%Good
  • 44.0%Satisfactory
  • 3.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.9%Very good
  • 49.6%Good
  • 38.2%Satisfactory
  • 3.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 81.0%Good
  • 19.0%Satisfactory
Find on map >>   Show street view

Structure Number: 121020038905058,  Location: 3.25 MI N OF NASA RD 1 (Lat: 29.610414,  Lng: -95.032956),  Route carried "on" structure: State highway 146,  Year Built: 1969,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 20,500 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,850 (year 2033),  Design Load: HS 20,  Features Intersected: TAYLOR BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.542,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: July 2017,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020038905059,  Location: 2.80 MI N OF NASA RD 1 (Lat: 29.603875,  Lng: -95.031875),  Route carried "on" structure: State highway 146,  Year Built: 1969,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 20,500 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,850 (year 2033),  Design Load: HS 20,  Features Intersected: UP RR & PORT ROAD
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 7.231,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020038905101,  Location: 2.80 MI N OF NASA RD 1 (Lat: 29.603853,  Lng: -95.032081),  Route carried "on" structure: State highway 146,  Year Built: 1969,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 17,357 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,850 (year 2033),  Design Load: HS 20,  Features Intersected: UP RR & PORT ROAD
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 7.231,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 17.9m (58.7ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020038905102,  Location: 3.25 MI N OF NASA RD 1 (Lat: 29.610386,  Lng: -95.033144),  Route carried "on" structure: State highway 146,  Year Built: 1969,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 17,357 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,850 (year 2033),  Design Load: HS 20,  Features Intersected: TAYLOR BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.542,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $36,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020038905355,  Location: 3.0 MI N OF NASA RD 1 (Lat: 29.607397,  Lng: -95.032961),  Route carried "on" structure: Ramp State highway 146,  Year Built: 2012,  Status: Open,  Structure Length: 69.13m (226.80ft),  Average Daily Traffic: 10,000 (year 2016),  Average Future Daily Traffic: 11,000 (year 2036),  Design Load: HL 93,  Features Intersected: PORT RD & SH 146
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.872,  Lanes on structure: 1,  Lanes under structure: 13,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 10,  Length of Maximum Span: 94.5m (310.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020038905356,  Location: 5.8 MI S OF SH 225 (Lat: 29.603839,  Lng: -95.028217),  Route carried "on" structure: Ramp State highway 146,  Year Built: 2016,  Status: Open,  Structure Length: 48.16m (158.01ft),  Average Daily Traffic: 40,000 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 59,800 (year 2032),  Design Load: HL 93,  Features Intersected: UP RAILROAD; FRTG RDS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.954,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 6,  Length of Maximum Span: 86.9m (285.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201015,  Location: 0.5 MI E OF BELTWAY 8 (Lat: 29.711922,  Lng: -95.144814),  Route carried "on" structure: State highway 225,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 72,482 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 105,130 (year 2033),  Design Load: HS 20,  Features Intersected: BOGGY BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.898,  Lanes on structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 62.2m (204.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 121020050201016,  Location: 0.8 MI E OF BW 8 (Lat: 29.711675,  Lng: -95.140169),  Route carried "on" structure: State highway 225,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 12.68m (41.60ft),  Average Daily Traffic: 42,947 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 52,560 (year 2033),  Design Load: HS 20,  Features Intersected: UP RR; RAILROAD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.340,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201017,  Location: 3.2 MI E OF IH 610 (Lat: 29.710150,  Lng: -95.216700),  Route carried "on" structure: ServiceState highway 225,  Year Built: 1966,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 1,360 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,910 (year 2033),  Design Load: H 20,  Features Intersected: VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.340,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $13,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201018,  Location: 4.0 MI E OF IH 610 (Lat: 29.711525,  Lng: -95.203069),  Route carried "on" structure: ServiceState highway 225,  Year Built: 1965,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,360 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,910 (year 2033),  Design Load: H 20,  Features Intersected: LITTLE VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.650,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $9,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201023,  Location: 2.8 MI E OF IH 610 (Lat: 29.710381,  Lng: -95.220108),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 6,000 (year 2008),  Average Future Daily Traffic: 8,500 (year 2028),  Design Load: HS 20,  Features Intersected: SH 225,  Facility Carried by Structure: RICHEY ST SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201024,  Location: 3.1 MI E OF IH 610 (Lat: 29.709972,  Lng: -95.218814),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 6,458 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,820 (year 2033),  Design Load: HS 20,  Features Intersected: SH 225 EB OFF RP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.134,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201025,  Location: 3.1 MI E OF IH 610 (Lat: 29.710850,  Lng: -95.217528),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 9,870 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,820 (year 2033),  Design Load: HS 20,  Features Intersected: SH 225 WB ON RP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.209,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201026,  Location: 3.2 MI E OF IH 610 (Lat: 29.711358,  Lng: -95.216883),  Route carried "on" structure: ServiceState highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,500 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,510 (year 2033),  Design Load: HS 20,  Features Intersected: VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.335,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201027,  Location: 3.2 MI E OF IH 610 (Lat: 29.710844,  Lng: -95.216975),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 6,360 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,820 (year 2033),  Design Load: HS 20,  Features Intersected: VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.335,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201028,  Location: 3.2 MI E OF IH 610 (Lat: 29.710619,  Lng: -95.216792),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 53,547 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.322,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201029,  Location: 3.6 MI E OF IH 610 (Lat: 29.710828,  Lng: -95.213447),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 67.09m (220.11ft),  Average Daily Traffic: 53,547 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: MAIN,SHAVER;MUNGER; ETC.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.663,  Lanes on structure: 3,  Lanes under structure: 19,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 29,  Number Of Approach Spans: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12102005020103,  Location: 4 MI E OF IH 610 (Lat: 29.712192,  Lng: -95.203475),  Route carried "on" structure: ServiceState highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 2,500 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,510 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.614,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201031,  Location: 4.0 MI E OF IH 610 (Lat: 29.711742,  Lng: -95.203300),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 53,547 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.637,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201032,  Location: 4.2 MI E OF IH 610 (Lat: 29.711878,  Lng: -95.201581),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 53,547 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: PASADENA BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.816,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201033,  Location: 5.0 MI E OF IH 610 (Lat: 29.712197,  Lng: -95.197764),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 53,547 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: RED BLUFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.184,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201044,  Location: 0.2 MI W OF BEARLE ST (Lat: 29.713122,  Lng: -95.187575),  Route carried "on" structure: State highway 225,  Year Built: 1974,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 70,242 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 116,450 (year 2033),  Features Intersected: COTTON PATCH BATCH DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.187,  Lanes on structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 55.5m (182.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 121020050201054,  Location: 5.1 MI E OF IH 610 (Lat: 29.712703,  Lng: -95.184586),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 40,704 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: BEARLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.472,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201055,  Location: 5.85 MI E OF IH 610 (Lat: 29.712558,  Lng: -95.171483),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 40,704 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: PRESTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.680,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201056,  Location: 5.1 MI E OF IH 610 (Lat: 29.712961,  Lng: -95.183731),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 41,934 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: BEARLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.472,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201057,  Location: 5.85 MI E OF IH 610 (Lat: 29.712731,  Lng: -95.171519),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 41,934 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: PRESTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.680,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201058,  Location: 0.8 MI E OF BW 8 (Lat: 29.711850,  Lng: -95.140211),  Route carried "on" structure: State highway 225,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 10.79m (35.40ft),  Average Daily Traffic: 42,326 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 52,560 (year 2033),  Design Load: HS 20,  Features Intersected: UP RR; RAILROAD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.340,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201067,  Location: 2.8 MI E OF IH 610 (Lat: 29.710394,  Lng: -95.219944),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 6,000 (year 2009),  Average Future Daily Traffic: 8,500 (year 2029),  Design Load: HS 20,  Features Intersected: SH 225,  Facility Carried by Structure: RICHEY ST NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201068,  Location: 3.2 MI E OF IH 610 (Lat: 29.710792,  Lng: -95.216800),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 54,752 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.322,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201069,  Location: 3.6 MI E OF IH 610 (Lat: 29.711675,  Lng: -95.206831),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 67.09m (220.11ft),  Average Daily Traffic: 54,752 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: MAIN,SHAVER;MUNGER; ETC.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.663,  Lanes on structure: 3,  Lanes under structure: 19,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 29,  Number Of Approach Spans: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12102005020107,  Location: 4.0 MI E OF IH 610 (Lat: 29.712072,  Lng: -95.203347),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 54,752 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE VINCE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.637,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 19.9m (65.3ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201071,  Location: 4.2 MI E OF IH 610 (Lat: 29.712208,  Lng: -95.200922),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 54,752 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: PASADENA BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.816,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201073,  Location: 5.0 MI E OF IH 610 (Lat: 29.712550,  Lng: -95.196978),  Route carried "on" structure: State highway 225,  Year Built: 1971,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 54,752 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 69,110 (year 2033),  Design Load: HS 20,  Features Intersected: RED BLUFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.184,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201268,  Location: 0.45 MI W OF BW 8 (Lat: 29.712444,  Lng: -95.161261),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 41,934 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: HCFCD DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.718,  Lanes on structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 39.9m (130.9ft),  Out-to-Out Width: 40.6m (133.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $33,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201269,  Location: 6.70 MI E OF IH 610 (Lat: 29.712047,  Lng: -95.153625),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 14.69m (48.20ft),  Average Daily Traffic: 40,704 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: BW 8 FRTG RDS
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 11.410,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12102005020127,  Location: 0.45 MI W OF BW 8 (Lat: 29.712272,  Lng: -95.161247),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 40,704 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: HCFCD DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.718,  Lanes on structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 42.8m (140.4ft),  Out-to-Out Width: 43.7m (143.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $35,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201271,  Location: 6.7 MI E OF IH 610 (Lat: 29.712094,  Lng: -95.152936),  Route carried "on" structure: State highway 225,  Year Built: 1983,  Status: Open,  Structure Length: 14.69m (48.20ft),  Average Daily Traffic: 41,590 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 58,220 (year 2033),  Design Load: HS 20,  Features Intersected: BW 8 FRTG RDS
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 11.410,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201438,  Location: 1.5 MI S OF SHIP CHANNEL (Lat: 29.709244,  Lng: -95.153297),  Route carried "on" structure: Other road 8,  Year Built: 2020,  Status: Open,  Structure Length: 68.85m (225.89ft),  Average Daily Traffic: 53,031 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 74,243 (year 2039),  Design Load: HL 93,  Features Intersected: SH 225
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 3,  Lanes under structure: 12,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: Local Toll Authority,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 19,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201439,  Location: 1.5 MI S OF SHIP CHANNEL (Lat: 29.715142,  Lng: -95.152972),  Route carried "on" structure: Other road 8,  Year Built: 2020,  Status: Open,  Structure Length: 69.83m (229.10ft),  Average Daily Traffic: 53,031 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 74,243 (year 2039),  Design Load: HL 93,  Features Intersected: SH 225
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 3,  Lanes under structure: 12,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: Local Toll Authority,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 19,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020098101019,  Location: 3.56 MI NE OF SH 3 (Lat: 29.563131,  Lng: -95.071736),  Route carried "on" structure: State highway 1,  Year Built: 1984,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 25.15m (82.51ft),  Average Daily Traffic: 31,681 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,620 (year 2033),  Design Load: HS 20,  Features Intersected: MUD LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.107,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 20,  Number Of Approach Spans: 16,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.15m (82.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $116,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $145,000,  Deck Structure Type: Concrete Cast-file-Place
Discuss Pasadena, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.