Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Nacogdoches, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 96Number of bridges
  • 1,194ft / 364mTotal length
  • $221,000Total costs
  • 619,271Total average daily traffic
  • 97,349Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Nacogdoches
  • No street view available for this location

New bridges in Nacogdoches, TX - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 51940-1949
  • 111950-1959
  • 181960-1969
  • 141970-1979
  • 221980-1989
  • 171990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Nacogdoches, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 41960-1969
  • 21970-1979
  • 51980-1989
  • 21990-1999
  • 32000-2009
Average Bridge Daily Traffic in Nacogdoches, TX
Average Bridge Truck Traffic in Nacogdoches, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.7%Very good
  • 45.3%Good
  • 46.9%Satisfactory
  • 3.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.9%Very good
  • 31.3%Good
  • 51.6%Satisfactory
  • 6.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.1%Very good
  • 35.9%Good
  • 40.6%Satisfactory
  • 14.1%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.3%Good
  • 55.0%Satisfactory
  • 20.0%Fair
  • 1.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 111740256001073,  Location: JCT US 59 & SH 21 (Lat: 31.611842,  Lng: -94.684628),  Route carried "under" structure: State highway 21,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 7,300 (year 2014),  Truck Traffic: 15%,  Features Intersected: US 59 & LP 224 SB,  Facility Carried by Structure: US 59 & LP 224 SB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 27.679,  Lanes on structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 111740256001082,  Location: JCT LOOP 224 & US 59 (Lat: 31.576706,  Lng: -94.672086),  Route carried "under" structure: State highway 59,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 15,570 (year 2014),  Truck Traffic: 7%,  Features Intersected: US 59 & LP 224 WB
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 38.206,  Lanes on structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 111740256001089,  Location: JCT US 59 & SH 7 (Lat: 31.584706,  Lng: -94.679214),  Route carried "under" structure: State highway 7,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 2014),  Truck Traffic: 15%,  Features Intersected: SH 7,  Facility Carried by Structure: US 59 & LP 224 SB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 17.883,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Discuss Nacogdoches, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.