Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Leominster, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 427ft / 130mTotal length
  • $96,375,000Total costs
  • 702,208Total average daily traffic
  • 42,222Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Leominster
  • No street view available for this location

New bridges in Leominster, MA - historical statistics
  • New bridges - historical statistics
  • 4Before 1900
  • 31900-1909
  • 31930-1939
  • 101940-1949
  • 51950-1959
  • 11960-1969
  • 151970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Leominster, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31920-1929
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Leominster, MA
Average Bridge Truck Traffic in Leominster, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.1%Very good
  • 40.6%Good
  • 28.1%Satisfactory
  • 28.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Very good
  • 13.5%Good
  • 43.2%Satisfactory
  • 32.4%Fair
  • 2.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.7%Very good
  • 32.4%Good
  • 32.4%Satisfactory
  • 32.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 20.0%Good
  • 35.0%Satisfactory
  • 25.0%Fair
  • 5.0%Serious
  • 5.0%Failed
Find on map >>   Show street view

Structure Number: L080471NWDOTNBI,  Location: .5 MILES S.E. OF ST 13 (Lat: 42.529383,  Lng: -71.734122),  Route carried "on" structure: State highway 2,  Year Built: 1975,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 34,120 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY NASHUA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.861,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,773,000,  Roadway Improvement Cost: $478,000,  Total Project Cost: $7,160,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L17010571DOT634,  Location: JUST WEST OF FORT POND RD (Lat: 42.536556,  Lng: -71.702231),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 5.31m (17.42ft),  Average Daily Traffic: 9,356 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,265 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY SHIRLEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.0m (65.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 67.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,732,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,599,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L080241KEDOTNBI,  Location: NORTH MAIN ST/ ST 2 (Lat: 42.550000,  Lng: -71.766667),  Route carried "under" structure: State highway 2,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: ST 2 EB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: L080241KEDOTNBI,  Location: NORTH MAIN ST/ ST 2 (Lat: 42.550000,  Lng: -71.766667),  Route carried "under" structure: State highway 2,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: ST 2 WB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: L0802620VDOTNBI,  Location: MERRIAM AVE/ ST 2 (Lat: 42.550000,  Lng: -71.783333),  Route carried "under" structure: State highway 2,  Year Built: 1947,  Structure Length: 0. m,  Average Daily Traffic: 3,510 (year 0000),  Features Intersected: ST 2 EB,  Facility Carried by Structure: HWY MERRIAM AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: L0802620VDOTNBI,  Location: MERRIAM AVE/ ST 2 (Lat: 42.550000,  Lng: -71.783333),  Route carried "under" structure: State highway 2,  Year Built: 1947,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: ST 2 WB,  Facility Carried by Structure: HWY MERRIAM AVE
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: L0802820WDOTNBI,  Location: HAMILTON ST/ ST 2 (Lat: 42.550000,  Lng: -71.750000),  Route carried "under" structure: State highway 2,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: ST 2 WB,  Facility Carried by Structure: HWY HAMILTON ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: L0802820WDOTNBI,  Location: HAMILTON ST/ ST 2 (Lat: 42.550000,  Lng: -71.750000),  Route carried "under" structure: State highway 2,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: ST 2 EB,  Facility Carried by Structure: HWY HAMILTON ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: L080301LLDOTNBI,  Location: ST 13 MAIN ST/ ST 2 (Lat: 42.533333,  Lng: -71.750000),  Route carried "under" structure: State highway 2,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 13,810 (year 0000),  Features Intersected: ST 2 WB,  Facility Carried by Structure: ST 13 MAIN ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: L080301LLDOTNBI,  Location: ST 13 MAIN ST/ ST 2 (Lat: 42.533333,  Lng: -71.750000),  Route carried "under" structure: State highway 2,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: ST 2 EB,  Facility Carried by Structure: ST 13 MAIN ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: L080451W1DOTNBI,  Location: I-190 NB/ST 2 EB (Lat: 42.516667,  Lng: -71.733333),  Route carried "under" structure: State highway 2,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 0000),  Features Intersected: ST 2 EB,  Facility Carried by Structure: I 190 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Discuss Leominster, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.