Bridge Statistics for Buffalo, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 314Number of bridges
  • 5,945ft / 1,812mTotal length
  • $1,983,481,000Total costs
  • 6,044,286Total average daily traffic
  • 185,043Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Buffalo
  • No street view available for this location

New bridges in Buffalo, NY - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 281900-1909
  • 181910-1919
  • 81920-1929
  • 141930-1939
  • 41940-1949
  • 681950-1959
  • 951960-1969
  • 171970-1979
  • 201980-1989
  • 161990-1999
  • 142000-2009
  • 102010-2019
Reconstructed bridges in Buffalo, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 241980-1989
  • 201990-1999
  • 182000-2009
  • 102010-2019
Average Bridge Daily Traffic in Buffalo, NY
Average Bridge Truck Traffic in Buffalo, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.1%Excellent
  • 13.6%Very good
  • 49.2%Good
  • 22.0%Satisfactory
  • 7.6%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.8%Excellent
  • 17.3%Very good
  • 31.6%Good
  • 23.3%Satisfactory
  • 15.8%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Excellent
  • 10.5%Very good
  • 27.1%Good
  • 28.6%Satisfactory
  • 18.0%Fair
  • 11.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.5%Excellent
  • 37.8%Very good
  • 29.7%Good
  • 13.5%Satisfactory
  • 2.7%Fair
  • 2.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 2047241,  Location: 0.6 KM S JCT RTS 384 $198 (Lat: 42.929353,  Lng: -78.865933),  Route carried "on" structure: City street 384,  Year Built: 1998,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 9,713 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,758 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SCAJAQUADA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.294,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $1,215,000,  Roadway Improvement Cost: $711,000,  Total Project Cost: $1,926,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2047242,  Location: 0.4 MI S JCT RTS 384 &198 (Lat: 42.929097,  Lng: -78.865664),  Route carried "on" structure: City street 384,  Year Built: 1999,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 9,713 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,758 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SCAJAQUADA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.294,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $1,054,000,  Roadway Improvement Cost: $617,000,  Total Project Cost: $1,671,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225528,  Location: .9 MI W JCT I190 & SEN ST (Lat: 42.867975,  Lng: -78.843242),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 19.45m (63.81ft),  Average Daily Traffic: 1,536 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,900 (year 2040),  Design Load: HS 20,  Features Intersected: NS & CSX Railroad, CSX T,  Facility Carried by Structure: ELK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.44m (63.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $12,129,000,  Roadway Improvement Cost: $7,103,000,  Total Project Cost: $19,232,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 225677,  Location: 1.4 MI SE JCT I190 & SH 5 (Lat: 42.870056,  Lng: -78.854956),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 5,320 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,617 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANSPRTATION,  Facility Carried by Structure: SOUTH PARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.77m (28.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $6,514,000,  Roadway Improvement Cost: $3,815,000,  Total Project Cost: $10,329,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225754,  Location: 2 MI SE JCT I190 & SH 5 (Lat: 42.864703,  Lng: -78.845425),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 17.62m (57.81ft),  Average Daily Traffic: 7,598 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,023 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN, CSX TR,  Facility Carried by Structure: SOUTH PARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 30.1m (98.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.61m (57.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $11,911,000,  Roadway Improvement Cost: $6,975,000,  Total Project Cost: $18,886,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225763,  Location: 0.9 MI.NE JCT RTS 5 & 198 (Lat: 42.940314,  Lng: -78.844561),  Route carried "on" structure: City street ,  Year Built: 1909,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 6,894 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,280 (year 2040),  Design Load: HS 20,  Features Intersected: CSXT,  Facility Carried by Structure: AMHERST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.924,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,234,000,  Roadway Improvement Cost: $1,894,000,  Total Project Cost: $5,128,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 226041,  Location: 1.2 MI E JCT SH 5 & I190 (Lat: 42.876169,  Lng: -78.856614),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 23.44m (76.90ft),  Average Daily Traffic: 4,401 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,647 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: EXCHANGE ST (& CSX), CSX,  Facility Carried by Structure: HAMBURG STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.43m (76.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $10,413,000,  Roadway Improvement Cost: $6,098,000,  Total Project Cost: $16,510,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226041A,  Location: 1.2 MI E JCT SH 5 & I190 (Lat: 42.874544,  Lng: -78.857433),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1998,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 1,950 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,185 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RELIEF,  Facility Carried by Structure: 190IX NB RAMP HAMB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,720,000,  Roadway Improvement Cost: $2,764,000,  Total Project Cost: $7,483,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 226042,  Location: .4 MI NW JCT SH 16 & I190 (Lat: 42.873292,  Lng: -78.832353),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 1,609 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,253 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: BABCOCK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,781,000,  Roadway Improvement Cost: $1,629,000,  Total Project Cost: $4,410,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 226043,  Location: 2.6 MI SE SH5 & BUFF RVR (Lat: 42.861383,  Lng: -78.867383),  Route carried "on" structure: City street ,  Year Built: 1961,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 4,276 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,515 (year 2040),  Features Intersected: BUFFALO RIVER,  Facility Carried by Structure: OHIO STREET
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Navigation Control: Yes ( Vertical Clearance: 30.4m (99.7ft), Horizontal Clearance: 76.5m (251.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 82.2m (269.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $18,007,000,  Roadway Improvement Cost: $10,545,000,  Total Project Cost: $28,552,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226044,  Location: JCT WILLIAM'BUFF CITY LI (Lat: 42.885075,  Lng: -78.800844),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 712 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 997 (year 2036),  Features Intersected: WILLIAM STREET,  Facility Carried by Structure: QUEEN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,830,000,  Roadway Improvement Cost: $1,072,000,  Total Project Cost: $2,901,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226045,  Location: .3 MI SW JCT SH5 & BUF RV (Lat: 42.871408,  Lng: -78.873353),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 1,775 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,196 (year 2040),  Features Intersected: BUFFALO RIVER,  Facility Carried by Structure: MICHIGAN AVENUE
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 30.4m (99.7ft), Horizontal Clearance: 71.6m (234.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 71.9m (235.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.49m (24.57ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $10,874,000,  Roadway Improvement Cost: $6,368,000,  Total Project Cost: $17,242,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 226046,  Location: 0.5 MI W JCT RTS 198 '384 (Lat: 42.933650,  Lng: -78.874258),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 2,104 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,438 (year 2040),  Features Intersected: SCAJAQUADA CREEK,  Facility Carried by Structure: LINCOLN PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,118,000,  Roadway Improvement Cost: $2,411,000,  Total Project Cost: $6,529,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226052,  Location: 0.1 MI E JCT RTS 5 'I-190 (Lat: 42.878731,  Lng: -78.875539),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,662 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,867 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I190, CSX TRANS/AMTR,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.274,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,568,000,  Roadway Improvement Cost: $918,000,  Total Project Cost: $2,486,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226054,  Location: .5 MI N JCT SH 198 & SH33 (Lat: 42.931378,  Lng: -78.842767),  Route carried "on" structure: City street ,  Year Built: 1909,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,054 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,476 (year 2040),  Features Intersected: CSXT,  Facility Carried by Structure: DEWEY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,563,000,  Roadway Improvement Cost: $1,501,000,  Total Project Cost: $4,063,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226055,  Location: .5 MI NORTH OF SOUTH PARK (Lat: 42.836742,  Lng: -78.832444),  Route carried "on" structure: City street ,  Year Built: 1982,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 712 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 997 (year 2037),  Design Load: HS 20,  Features Intersected: BUFF & PITTSBURGH,  Facility Carried by Structure: HOPKINS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: Railroad,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,681,000,  Roadway Improvement Cost: $984,000,  Total Project Cost: $2,665,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226056,  Location: 0.6 MI NE JCT RTS 5 & 198 (Lat: 42.934147,  Lng: -78.842769),  Route carried "on" structure: City street ,  Year Built: 1909,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 865 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,211 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSXT/CN/D&H,  Facility Carried by Structure: JEWETT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Satisfactory,  Operating Rating: 90.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,584,000,  Roadway Improvement Cost: $1,513,000,  Total Project Cost: $4,097,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226057,  Location: 0.3 MI N JCT RTS 198 & 33 (Lat: 42.927519,  Lng: -78.842767),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 3,545 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,743 (year 2040),  Design Load: HS 20,  Features Intersected: CSXT,  Facility Carried by Structure: KENSINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,267,000,  Roadway Improvement Cost: $742,000,  Total Project Cost: $2,009,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226058,  Location: 0.5 MI NE JCT RTS 5 & 198 (Lat: 42.932944,  Lng: -78.842778),  Route carried "on" structure: City street ,  Year Built: 1909,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 738 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 913 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSXT/CN/D&H,  Facility Carried by Structure: LEROY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.6m (80.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,458,000,  Roadway Improvement Cost: $854,000,  Total Project Cost: $2,312,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226061,  Location: .2 MI SE JCT SH 5 & SH 16 (Lat: 42.878111,  Lng: -78.870119),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 18.50m (60.70ft),  Average Daily Traffic: 12,437 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,561 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: 190I SB, 190I, CSX Rail,  Facility Carried by Structure: MICHIGAN AVENUE
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 10,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 27.0m (88.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.50m (60.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $11,862,000,  Roadway Improvement Cost: $6,946,000,  Total Project Cost: $18,808,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226062,  Location: 1.5 MI S JCT SH5 & BUF RV (Lat: 42.855161,  Lng: -78.864619),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 13.62m (44.69ft),  Average Daily Traffic: 4,276 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,515 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANSPRTATION,  Facility Carried by Structure: OHIO STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 56.3m (184.7ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.62m (44.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $8,795,000,  Roadway Improvement Cost: $5,150,000,  Total Project Cost: $13,945,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226064,  Location: 2.3 MI SW JCT SH16 & US62 (Lat: 42.844222,  Lng: -78.843533),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 38.95m (127.79ft),  Average Daily Traffic: 9,646 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,186 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANS/AMTRAK, BUFF &,  Facility Carried by Structure: TIFFT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 68.8m (225.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.95m (127.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $24,480,000,  Roadway Improvement Cost: $14,335,000,  Total Project Cost: $38,815,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226065,  Location: 1.9 MI SE JCT SH5 & BUF R (Lat: 42.863272,  Lng: -78.843025),  Route carried "on" structure: City street ,  Year Built: 1952,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 7,598 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,023 (year 2040),  Features Intersected: BUFFALO RIVER,  Facility Carried by Structure: SOUTH PARK AVENUE
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 3.218,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Navigation Control: Yes ( Vertical Clearance: 30.4m (99.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 68.2m (223.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $14,051,000,  Roadway Improvement Cost: $8,228,000,  Total Project Cost: $22,279,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226066,  Location: 2.5 MI S JCT RTS I190<198 (Lat: 42.915178,  Lng: -78.902650),  Route carried "on" structure: City street ,  Year Built: 1913,  Year Reconstructed: 2016,  Status: Posted for load,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 761 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,065 (year 2037),  Features Intersected: BLACK ROCK CANAL,  Facility Carried by Structure: WEST FERRY STREET
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 47.2m (154.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 50.2m (164.7ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.85m (22.47ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $7,501,000,  Roadway Improvement Cost: $4,393,000,  Total Project Cost: $11,894,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 226067,  Location: 0.7 MI NW RTE 5'BUFFALO R (Lat: 42.880889,  Lng: -78.880453),  Route carried "on" structure: City street ,  Year Built: 1945,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 3,874 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,793 (year 2040),  Features Intersected: CSX TRANS/AMTRAK,  Facility Carried by Structure: ERIE ST & PERRY
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 171.9m (564.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $16,359,000,  Roadway Improvement Cost: $9,580,000,  Total Project Cost: $25,939,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226069,  Location: NW QUAD OF CAZENOVIA PARK (Lat: 42.850750,  Lng: -78.809269),  Route carried "on" structure: City street ,  Year Built: 1953,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 6,465 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,827 (year 2040),  Features Intersected: CAZENOVIA CREEK,  Facility Carried by Structure: CAZENOVIA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $2,599,000,  Roadway Improvement Cost: $1,522,000,  Total Project Cost: $4,121,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226071,  Location: CENTER OF CAZENOVIA PARK (Lat: 42.845667,  Lng: -78.806272),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 3,351 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,691 (year 2037),  Features Intersected: CAZENOVIA CREEK,  Facility Carried by Structure: WARREN SPAHN WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,896,000,  Roadway Improvement Cost: $1,110,000,  Total Project Cost: $3,007,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226072,  Location: 0.8 MI SW JCT RTS 16 & 62 (Lat: 42.859469,  Lng: -78.822386),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 2,651 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,799 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAZENOVIA CREEK,  Facility Carried by Structure: SOUTHSIDE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $2,607,000,  Roadway Improvement Cost: $1,527,000,  Total Project Cost: $4,134,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226073,  Location: 0.7 MI SW RTE 354' I-90 (Lat: 42.864669,  Lng: -78.802178),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 5,509 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,816 (year 2040),  Features Intersected: BUFFALO RIVER,  Facility Carried by Structure: SOUTH OGDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $3,226,000,  Roadway Improvement Cost: $1,889,000,  Total Project Cost: $5,115,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226074,  Location: 1.2 MI SW JCT RT 16 & 62 (Lat: 42.856531,  Lng: -78.816433),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 4,334 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,362 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAZENOVIA CREEK,  Facility Carried by Structure: STEVENSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,607,000,  Roadway Improvement Cost: $1,527,000,  Total Project Cost: $4,134,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226076,  Location: 1.3 MI N JCT I-190 ' 198 (Lat: 42.944911,  Lng: -78.908742),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,562 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,187 (year 2018),  Features Intersected: CORNELIUS CREEK,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $371,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226394,  Location: 0.1 MI S JCT RTS I190 ' 5 (Lat: 42.879400,  Lng: -78.877822),  Route carried "on" structure: City street ,  Year Built: 1944,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 908 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 958 (year 2040),  Features Intersected: CSX TRANS/AMTRAK,  Facility Carried by Structure: MAIN AND PEARL ST
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 0.177,  Lanes on structure: 6,  Owner: Railroad,  Approaching Roadway Width: 32.9m (107.9ft),  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 5.3m (17.4ft),  Right: 6.4m (21.0ft),  Curb-To-Curb Width: 138.2m (453.4ft),  Out-to-Out Width: 150.6m (494.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $13,314,000,  Roadway Improvement Cost: $7,797,000,  Total Project Cost: $21,111,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5011959,  Location: JCT RT 16 + I-90 (Lat: 42.868019,  Lng: -78.827756),  Route carried "on" structure: Interstate 190,  Year Built: 1956,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 42,042 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 47,116 (year 2040),  Features Intersected: NY 16 - Seneca Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.055,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 29.6m (97.1ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 31.3m (102.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.22m (26.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $10,131,000,  Roadway Improvement Cost: $5,933,000,  Total Project Cost: $16,064,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 504393,  Location: 1.1 MI S JCT RTS 266 +325 (Lat: 42.952728,  Lng: -78.909239),  Route carried "on" structure: State highway 266,  Year Built: 1956,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,426 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,673 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 190IX NB RAMP TO NY 266
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.321,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 4.9m (16.1ft),  Right: 2.8m (9.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,917,000,  Roadway Improvement Cost: $2,294,000,  Total Project Cost: $6,211,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 5046459,  Location: 0.2 MI E JCT RTS 354 & 62 (Lat: 42.872014,  Lng: -78.816258),  Route carried "on" structure: Interstate 190,  Year Built: 1959,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 49,747 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 55,751 (year 2040),  Features Intersected: NY 354 CLINTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 6,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 31.3m (102.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.94m (22.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $8,696,000,  Roadway Improvement Cost: $5,093,000,  Total Project Cost: $13,789,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing