Bridge Statistics for Brockton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 37Number of bridges
  • 184ft / 55.7mTotal length
  • $48,960,000Total costs
  • 676,464Total average daily traffic
  • 40,703Total average daily truck traffic
  • 1,245,236Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brockton
  • No street view available for this location

New bridges in Brockton, MA - historical statistics
  • New bridges - historical statistics
  • 6Before 1900
  • 11900-1909
  • 41910-1919
  • 11930-1939
  • 11940-1949
  • 61950-1959
  • 41970-1979
  • 41980-1989
  • 61990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Brockton, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11910-1919
  • 01920-1929
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Brockton, MA
Average Bridge Truck Traffic in Brockton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 35.3%Good
  • 20.6%Satisfactory
  • 26.5%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.1%Very good
  • 34.3%Good
  • 22.9%Satisfactory
  • 25.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.4%Very good
  • 40.0%Good
  • 48.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.0%Very good
  • 56.5%Good
  • 17.4%Satisfactory
  • 13.0%Fair
Find on map >>   Show street view

Structure Number: B25065456MUNNBI,  Location: .1 MILE SOUTH OF OAK ST. (Lat: 42.098467,  Lng: -71.043422),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,100 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,579 (year 2032),  Features Intersected: WATER PORTER POND,  Facility Carried by Structure: HWY DW FIELD PK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 2 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $257,000 ( Estimate for 2022)