Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brockton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 37Number of bridges
  • 184ft / 55.7mTotal length
  • $48,960,000Total costs
  • 676,464Total average daily traffic
  • 40,703Total average daily truck traffic
  • 1,245,236Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brockton
  • No street view available for this location

New bridges in Brockton, MA - historical statistics
  • New bridges - historical statistics
  • 6Before 1900
  • 11900-1909
  • 41910-1919
  • 11930-1939
  • 11940-1949
  • 61950-1959
  • 41970-1979
  • 41980-1989
  • 61990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Brockton, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11910-1919
  • 01920-1929
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Brockton, MA
Average Bridge Truck Traffic in Brockton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 35.3%Good
  • 20.6%Satisfactory
  • 26.5%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.1%Very good
  • 34.3%Good
  • 22.9%Satisfactory
  • 25.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.4%Very good
  • 40.0%Good
  • 48.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.0%Very good
  • 56.5%Good
  • 17.4%Satisfactory
  • 13.0%Fair
Find on map >>   Show street view

Structure Number: B2500142QMUNNBI,  Location: .1 M E OF 28/WAS MEDOW LN (Lat: 42.053708,  Lng: -71.009817),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 19,400 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,321 (year 2032),  Design Load: H 20,  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY SARGENTS WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B2500242YMUNNBI,  Location: AT CAMPELLO T STATION (Lat: 42.059197,  Lng: -71.010831),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 14,334 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,425 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY PLAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $154,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: B25003ALDMUNNBI,  Location: .1 MI SOUTH OF PERKINS ST (Lat: 42.062683,  Lng: -71.010278),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.42m (4.66ft),  Average Daily Traffic: 3,100 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,159 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 78.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $708,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $1,063,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B25004AFFMUNNBI,  Location: .25 MI E OF CLINTON ST (Lat: 42.068992,  Lng: -71.010394),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,000 (year 2020),  Average Future Daily Traffic: 3,159 (year 2031),  Design Load: HS 20,  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY PINE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $544,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B2500542VMUNNBI,  Location: 2.1 MI W ABINGTON (Lat: 42.078883,  Lng: -71.009978),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 20,450 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 38,535 (year 2031),  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $803,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B25007450MUNNBI,  Location: .1 MI S OF CRESCENT S (Lat: 42.079325,  Lng: -71.014008),  Route carried "on" structure: City street ,  Year Built: 1913,  Year Reconstructed: 1973,  Status: Temporarily open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 1,214 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,159 (year 2032),  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY OTIS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B2500842PMUNNBI,  Location: .25 MI E OF RTE 28 (Lat: 42.063792,  Lng: -71.009767),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,581 (year 2031),  Design Load: HS 20,  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY PERKINS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B2500946FDOTNBI,  Location: 0.75 M N OF GROVE ST (Lat: 42.080636,  Lng: -71.017183),  Route carried "on" structure: State highway 28,  Year Built: 1889,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 11,500 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 28,427 (year 2033),  Features Intersected: WATER SALISBURY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.059,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2022,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $574,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: B2501090XMUNNBI,  Location: AT MAIN ST (Lat: 42.078308,  Lng: -71.019311),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 900 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,369 (year 2033),  Design Load: HS 20,  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY ALLEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $640,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B25011AELMUNNBI,  Location: ADJACENT TO ALLEN ST (Lat: 42.078133,  Lng: -71.019817),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 13,700 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 33,481 (year 2033),  Design Load: HS 20,  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.911,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $409,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: B2501242WMUNNBI,  Location: .3 MI S OF ST123 (Lat: 42.077642,  Lng: -71.022131),  Route carried "on" structure: City street ,  Year Built: 1913,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 8,785 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 26,848 (year 2033),  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY WARREN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 62.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B25013431MUNNBI,  Location: W OF WARR AVE JCT (Lat: 42.080000,  Lng: -71.023139),  Route carried "on" structure: City street 123,  Year Built: 1850,  Year Reconstructed: 1924,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 44,536 (year 2031),  Features Intersected: WATER SALISBURY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.796,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $808,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B250144CEDOT634,  Location: 0.8 MI E OF ST 28 (Lat: 42.097550,  Lng: -71.016856),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,833 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,633 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY E BATTLES ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $862,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,294,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250154CDDOT634,  Location: .1 M E OF RTE 28 (Lat: 42.071208,  Lng: -71.015589),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 9,152 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,425 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,426,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250164CCDOT634,  Location: .1 MI E OF RTE 28 (Lat: 42.068386,  Lng: -71.014783),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,737 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,949 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY E NILSSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $915,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,373,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250174CBDOT634,  Location: 0.1 MI E OF RTE 28 (Lat: 42.063692,  Lng: -71.013228),  Route carried "on" structure: City street ,  Year Built: 1895,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 8,793 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 15,635 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY PERKINS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.7m (61.4ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $850,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B250184CGDOT634,  Location: .25 MI E OF RTE 28 (Lat: 42.058383,  Lng: -71.008611),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,372 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY PLAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $355,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B250194CADOT634,  Location: WAS MEADOW LN .4 M E ST28 (Lat: 42.055811,  Lng: -71.006281),  Route carried "on" structure: City street ,  Year Built: 1895,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 15,800 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,161 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY SARGENTS WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $409,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B250214CHDOT634,  Location: ADJACENT TO JCT ST 28 (Lat: 42.108342,  Lng: -71.023158),  Route carried "on" structure: State highway 37,  Year Built: 1997,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 16,400 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 47,537 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.0m (42.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,194,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,792,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B250224CFDOT634,  Location: .1 MI E OF RTE 28 (Lat: 42.105117,  Lng: -71.020967),  Route carried "on" structure: City street ,  Year Built: 1894,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.40m (7.87ft),  Average Daily Traffic: 2,800 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,423 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY FIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 91.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,385,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,078,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B25032B6UMUNNBI,  Location: .1 MI EAST OF MAIN STREET (Lat: 42.079692,  Lng: -71.018314),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,737 (year 2032),  Design Load: HL 93,  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY WHITE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $662,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $994,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B2503549LDOTNBI,  Location: 0.6 M E OF RTE 28 (Lat: 42.080031,  Lng: -71.009306),  Route carried "on" structure: State highway 27,  Year Built: 1976,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 17,600 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,534 (year 2031),  Design Load: HS 20,  Features Intersected: WATER TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.428,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $782,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B2503742RMUNNBI,  Location: AT JCT PLYMOUTH ST (Lat: 42.083975,  Lng: -71.012403),  Route carried "on" structure: City street 123,  Year Built: 1901,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 12,900 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,062 (year 2032),  Design Load: HS 20,  Features Intersected: WATER TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.260,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $329,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B2504142TMUNNBI,  Location: EAST OF JCT ST 28 (Lat: 42.095119,  Lng: -71.011728),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 14,741 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,585 (year 2033),  Features Intersected: WATER TROUT BROOK,  Facility Carried by Structure: HWY E ASHLAND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2022,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $755,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B250473MYDOTNBI,  Location: .3 MI.S OF ST 123 (Lat: 42.054356,  Lng: -71.059281),  Route carried "on" structure: State highway 24,  Year Built: 1954,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 105,251 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 143,874 (year 2032),  Design Load: H 20,  Features Intersected: HWY W CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.990,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.8m (101.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 30.8m (101.0ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $2,327,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $3,491,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250483V4DOTNBI,  Location: .1 MI W OF VA HOSPITAL (Lat: 42.061917,  Lng: -71.061642),  Route carried "on" structure: State highway 123,  Year Built: 1954,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 28,450 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 73,595 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: ST 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.517,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,933,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,900,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B250493N0DOTNBI,  Location: .3 MI.N OF ST 123 (Lat: 42.071114,  Lng: -71.062389),  Route carried "on" structure: State highway 24,  Year Built: 1954,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 112,606 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 236,895 (year 2032),  Design Load: H 20,  Features Intersected: HWY TORREY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.956,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 30.0m (98.4ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $2,642,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $3,964,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250503WXDOTNBI,  Location: .2 MI.S OF ST 27 (Lat: 42.088369,  Lng: -71.060819),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 8,700 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,055 (year 2032),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,804,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $4,207,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250523VRDOTNBI,  Location: ST 27 AT ST 24 (Lat: 42.093972,  Lng: -71.059269),  Route carried "on" structure: State highway 27,  Year Built: 1954,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 33,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 67,436 (year 2031),  Design Load: H 20,  Features Intersected: ST 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.272,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.2m (69.6ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 21.2m (69.6ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,014,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $6,022,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B250543N1DOTNBI,  Location: .3 MI.N OF ST 27 (Lat: 42.101169,  Lng: -71.057578),  Route carried "on" structure: State highway 24,  Year Built: 1955,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 118,000 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 139,410 (year 2032),  Design Load: H 20,  Features Intersected: HWY OAK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,337,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $3,506,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: B25057432MUNNBI,  Location: .3 MI W EASTON (Lat: 42.053503,  Lng: -71.064275),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 13,184 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,692 (year 2031),  Design Load: H 20,  Features Intersected: WATER COWEESET BROOK,  Facility Carried by Structure: HWY W CHESTNT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.1m (46.3ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,303,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,955,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B2505842UMUNNBI,  Location: .1 MI SOUTH OF RTE 27 (Lat: 42.086711,  Lng: -71.033686),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1938,  Status: Posted for load,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 4,784 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,896 (year 2032),  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY BELMONT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $628,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B25059AUXMUNNBI,  Location: .1 MI E OF BELMONT AVE (Lat: 42.084972,  Lng: -71.032994),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,250 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,844 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY SPRING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $364,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: B25060AVAMUNNBI,  Location: 100FT N OF WAREHAM AVE (Lat: 42.078183,  Lng: -71.023236),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,528 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY BARTLETT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B25063430MUNNBI,  Location: AT JCT GROVE ST (Lat: 42.079389,  Lng: -71.009744),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 21,700 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,692 (year 2031),  Design Load: HS 20,  Features Intersected: WATER TROUT BROOK,  Facility Carried by Structure: HWY SUMMER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $511,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B25064453MUNNBI,  Location: 0.3 MI E OF RT 28 (Lat: 42.080156,  Lng: -71.015583),  Route carried "on" structure: City street ,  Year Built: 1914,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,687 (year 2031),  Features Intersected: WATER SALISBURY BROOK,  Facility Carried by Structure: HWY PERKINS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 69.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $623,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous