Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Auburn, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 69Number of bridges
  • 682ft / 208mTotal length
  • $101,171,000Total costs
  • 726,459Total average daily traffic
  • 135,403Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Auburn
  • No street view available for this location

New bridges in Auburn, AL - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 41940-1949
  • 61950-1959
  • 171960-1969
  • 61970-1979
  • 41980-1989
  • 41990-1999
  • 112000-2009
  • 132010-2019
  • 22020-2022
Average Bridge Daily Traffic in Auburn, AL
Average Bridge Truck Traffic in Auburn, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.4%Excellent
  • 8.1%Very good
  • 29.7%Good
  • 29.7%Satisfactory
  • 27.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.4%Excellent
  • 16.2%Very good
  • 40.5%Good
  • 32.4%Satisfactory
  • 5.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.4%Excellent
  • 13.5%Very good
  • 43.2%Good
  • 32.4%Satisfactory
  • 5.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.9%Excellent
  • 11.5%Very good
  • 34.6%Good
  • 40.4%Satisfactory
  • 9.6%Fair
  • 1.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 17.4%Excellent
  • 8.7%Very good
  • 17.4%Good
  • 43.5%Satisfactory
  • 4.3%Fair
  • 8.7%Poor
Find on map >>   Show street view

Structure Number: 895,  Location: 0.4 MI S JCT CO 26 (Lat: 32.535528,  Lng: -85.519222),  Route carried "on" structure: US 29,  Year Built: 1931,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,970 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,411 (year 2033),  Design Load: H 15,  Features Intersected: HUGLEY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.380,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 246,  Location: 0.2 MI N AUBURN (Lat: 32.636100,  Lng: -85.481717),  Route carried "on" structure: City street 147,  Year Built: 1940,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 8,470 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,983 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.674,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,573,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,730,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2928,  Location: 0.5 MI W JCT LEE RD 54 (Lat: 32.575000,  Lng: -85.418333),  Route carried "on" structure: County highway 1146,  Year Built: 1946,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,544 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,316 (year 2040),  Features Intersected: 11NH CREEK,  Facility Carried by Structure: Lee Road 146
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $385,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3093,  Location: 1.5 MI N E BEEHIVE (Lat: 32.567683,  Lng: -85.555992),  Route carried "on" structure: County highway 1137,  Year Built: 1947,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,704 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,556 (year 2040),  Features Intersected: CHOCLAFAULA CREEK,  Facility Carried by Structure: Lee Road 137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $370,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3347,  Location: 5 MI N JCT US 280 (Lat: 32.744108,  Lng: -85.499672),  Route carried "on" structure: State highway 147,  Year Built: 1948,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 2,280 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,590 (year 2038),  Design Load: H 15,  Features Intersected: SOUTH SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.338,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4395,  Location: 4.6 MI. W. I-85 (Lat: 32.538242,  Lng: -85.596956),  Route carried "on" structure: County highway 53,  Year Built: 1952,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 500 (year 2036),  Design Load: H 15,  Features Intersected: MILES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $404,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4731,  Location: 4.1 MI N JCT US 29 (Lat: 32.595222,  Lng: -85.450500),  Route carried "on" structure: Interstate 85,  Year Built: 1958,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 40,660 (year 2013),  Truck Traffic: 25%,  Average Future Daily Traffic: 53,588 (year 2033),  Design Load: H 20,  Features Intersected: MOORES MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.449,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Serious,  Culverts: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.33m (4.36ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $2,079,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $2,287,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5201,  Location: 1 MI E JCT S 015 (Lat: 32.537497,  Lng: -85.506275),  Route carried "on" structure: County highway 1010,  Year Built: 1955,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 2,766 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,149 (year 2040),  Features Intersected: PARKERSON MILL CREEK,  Facility Carried by Structure: Lee Road 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 61.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 61,  Location: 1.8 MI N JCT US 29 (Lat: 32.573500,  Lng: -85.480722),  Route carried "on" structure: Interstate 85,  Year Built: 1958,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 35,990 (year 2013),  Truck Traffic: 25%,  Average Future Daily Traffic: 58,974 (year 2033),  Design Load: H 20,  Features Intersected: STINK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.673,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,814,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,995,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6101,  Location: 2.6 MI N JCT US 29 (Lat: 32.580500,  Lng: -85.469944),  Route carried "on" structure: County highway 33,  Year Built: 1958,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 670 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 995 (year 2033),  Design Load: HS 20,  Features Intersected: I-85,  Facility Carried by Structure: WRIGHTS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,063,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,269,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8593,  Location: 3.5 MI S JCT US 29 (Lat: 32.532694,  Lng: -85.556308),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 15,690 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,679 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCLAFALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.215,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,807,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8594,  Location: 3.5 MI S JCT US 29 (Lat: 32.532500,  Lng: -85.556222),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 15,690 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,679 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCLAFALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.215,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,494,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,643,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8595,  Location: 2 MI S JCT US 29 (Lat: 32.542956,  Lng: -85.534781),  Route carried "on" structure: County highway 10,  Year Built: 1965,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 1,059 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,756 (year 2034),  Design Load: HS 20,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.499,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,661,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,827,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8596,  Location: 0.4 MI S JCT US 29 (Lat: 32.556389,  Lng: -85.512556),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 1.53m (5.02ft),  Average Daily Traffic: 31,570 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 41,608 (year 2033),  Design Load: H 20,  Features Intersected: PARKERSON MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.077,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.21m (7.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,622,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $2,884,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8601,  Location: 2.72 MI.N.186 (Lat: 32.509097,  Lng: -85.598653),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 15,690 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,679 (year 2033),  Design Load: HS 20,  Features Intersected: HODNETT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.406,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,328,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $2,561,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8602,  Location: 2.72 MI. N. AL.186 (Lat: 32.508894,  Lng: -85.598542),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 15,690 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,679 (year 2033),  Design Load: HS 20,  Features Intersected: HODNETT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.406,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,328,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $2,561,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8603,  Location: 3.59 MI.N OF AL.186 (Lat: 32.513958,  Lng: -85.585575),  Route carried "on" structure: County highway 54,  Year Built: 1965,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 208 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 407 (year 2028),  Design Load: HS 20,  Features Intersected: I85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.907,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.78m (28.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,988,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,187,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8604,  Location: 4.46 MI. N AL.186 (Lat: 32.523367,  Lng: -85.572217),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 15,690 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,679 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 75.277,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,329,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,462,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8605,  Location: 4.46MI. N. OF AL186 (Lat: 32.524050,  Lng: -85.572917),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 15,690 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,679 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.277,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,203,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,323,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10109,  Location: 0.6 MI E JCT US 29 (Lat: 32.585694,  Lng: -85.502583),  Route carried "on" structure: Bypass State highway 147,  Year Built: 1969,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 16,870 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 23,867 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 808.002,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $767,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $844,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1011,  Location: JCT AL 14 * AL 147 (Lat: 32.607389,  Lng: -85.510694),  Route carried "on" structure: Bypass State highway 147,  Year Built: 1969,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 15,790 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,339 (year 2033),  Design Load: HS 20,  Features Intersected: AL 14 * CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 810.509,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,212,000,  Roadway Improvement Cost: $421,000,  Total Project Cost: $4,633,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10111,  Location: 1.1 MI N JCT SR 14 (Lat: 32.621972,  Lng: -85.505056),  Route carried "on" structure: Bypass State highway 147,  Year Built: 1969,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 16,270 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,018 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 812.246,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.0m (52.5ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.4m (14.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.56m (5.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10112,  Location: 2.4 MI N JCT SR 14 (Lat: 33.636139,  Lng: -85.488778),  Route carried "on" structure: Bypass State highway 147,  Year Built: 1969,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 17,090 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,179 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 814.479,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,009,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,110,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10276,  Location: 0.7 MI E JCT CR 159 (Lat: 32.562200,  Lng: -85.465000),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Closed,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,170 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,496 (year 2030),  Design Load: H 15,  Features Intersected: MOORES MILL CREEK,  Facility Carried by Structure: OGLETREE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $425,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10946,  Location: AL.15*AL.#186 (Lat: 32.485000,  Lng: -85.577667),  Route carried "on" structure: US 29,  Year Built: 1973,  Status: Open,  Structure Length: 9.57m (31.40ft),  Average Daily Traffic: 3,839 (year 2010),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,996 (year 2030),  Design Load: HS 20,  Features Intersected: AL 186,  Facility Carried by Structure: AL 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.905,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.52m (34.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,895,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $4,285,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11175,  Location: DEER RUN ROAD (Lat: 32.611842,  Lng: -85.527956),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,024 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,274 (year 2030),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.1m (36.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $776,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $854,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 116,  Location: 0.2 MI SE I-85 (Lat: 32.602300,  Lng: -85.426600),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 14,538 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,044 (year 2035),  Design Load: H 20,  Features Intersected: MOORES MILL CREEK,  Facility Carried by Structure: BENT CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $674,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $741,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1173,  Location: 3.9 MI S WAVERLY (Lat: 32.701139,  Lng: -85.524250),  Route carried "on" structure: US 280,  Year Built: 1938,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 5,650 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,432 (year 2033),  Design Load: H 15,  Features Intersected: LITTLE LOBOCKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.21m (17.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,609,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,770,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11792,  Location: AUBURN (Lat: 32.603144,  Lng: -85.453147),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,406 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,820 (year 2034),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: OLD MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $556,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12751,  Location: AUBURN (Lat: 32.624983,  Lng: -85.474297),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,692 (year 2003),  Truck Traffic: 71%,  Average Future Daily Traffic: 8,200 (year 2030),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: SHELTON MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12769,  Location: AUBURN (Lat: 32.567911,  Lng: -85.453667),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,092 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,162 (year 2034),  Design Load: H 20,  Features Intersected: CREEK AND WINDWAY RD.,  Facility Carried by Structure: WINDWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $501,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13231,  Location: WIRE RD. * W.SANFORD AVE. (Lat: 32.599389,  Lng: -85.497000),  Route carried "on" structure: State lands road ,  Year Built: 1984,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 3,000 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,550 (year 2035),  Design Load: HS 20,  Features Intersected: PARKERSON MILL BRANCH,  Facility Carried by Structure: WIRE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 3,  Owner: State Agenciy,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $877,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $965,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14001,  Location: 1 MI NORTH OF AUBURN (Lat: 32.648139,  Lng: -85.482389),  Route carried "on" structure: State highway 147,  Year Built: 1986,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 8,470 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,983 (year 2033),  Design Load: HS 20,  Features Intersected: SOUGAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.810,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,956,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,152,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15888,  Location: 1.7 MI E OF I-85 (Lat: 32.586100,  Lng: -85.449700),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,870 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,323 (year 2034),  Design Load: H 20,  Features Intersected: MOORES MILL CREEK,  Facility Carried by Structure: MOORES MILL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.699,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $425,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16138,  Location: .4 MI W OF AL 147 (Lat: 32.753361,  Lng: -85.499728),  Route carried "on" structure: County highway 19,  Year Built: 1994,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 24 (year 1994),  Average Future Daily Traffic: 40 (year 2035),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 16628,  Location: 3.5 MI E WAVERLY (Lat: 32.737419,  Lng: -85.517811),  Route carried "on" structure: County highway 20,  Year Built: 1996,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 20 (year 1996),  Average Future Daily Traffic: 45 (year 2035),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $482,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 17133,  Location: 2.1 MI. E SR 147 (Lat: 32.657833,  Lng: -85.459872),  Route carried "on" structure: US 280,  Year Built: 2000,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 6,140 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,076 (year 2033),  Design Load: HS 20,  Features Intersected: SAUGAHATCHEE CREEK
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 167.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,590,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $2,849,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17365,  Location: 3.9 MI E OF WAVERLY (Lat: 32.701389,  Lng: -85.524028),  Route carried "on" structure: US 280,  Year Built: 2000,  Status: Open,  Structure Length: 7.00m (22.97ft),  Average Daily Traffic: 5,650 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,432 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE LOBLOCKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.03m (26.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,313,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,544,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17596,  Location: NEAR ST. MATTHEWS CHURCH? (Lat: 32.547642,  Lng: -85.555314),  Route carried "on" structure: County highway 1010,  Year Built: 2000,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 1,593 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,390 (year 2040),  Design Load: HS 20,  Features Intersected: CHOCLAFAULA CREEK,  Facility Carried by Structure: Lee Road 10
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $898,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $988,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17954,  Location: 1 MI.SOUTH U.S.280 (Lat: 32.636250,  Lng: -85.465694),  Route carried "on" structure: City street ?????,  Year Built: 1999,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 7,963 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,148 (year 2030),  Features Intersected: BRANCH,  Facility Carried by Structure: LEE RD.97
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $501,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18221,  Location: 1.0 MI.EAST OF I-85 (Lat: 32.586667,  Lng: -85.450000),  Route carried "on" structure: City street 2,  Year Built: 2000,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 21,407 (year 2014),  Average Future Daily Traffic: 24,817 (year 2034),  Design Load: HS 20,  Features Intersected: MOORE'S MILL CREEK,  Facility Carried by Structure: MOORE'S MILL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,121,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,233,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Auburn, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.