Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Athens, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 134Number of bridges
  • 1,283ft / 391mTotal length
  • $140,259,000Total costs
  • 828,327Total average daily traffic
  • 149,555Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Athens
  • No street view available for this location

New bridges in Athens, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 81920-1929
  • 51930-1939
  • 111940-1949
  • 291950-1959
  • 341960-1969
  • 111970-1979
  • 21980-1989
  • 141990-1999
  • 102000-2009
  • 72010-2019
  • 22020-2022
Reconstructed bridges in Athens, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 91960-1969
  • 11970-1979
  • 31980-1989
Average Bridge Daily Traffic in Athens, AL
Average Bridge Truck Traffic in Athens, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.8%Excellent
  • 7.1%Very good
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 1.8%Poor
  • 1.8%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.8%Excellent
  • 12.5%Very good
  • 44.6%Good
  • 26.8%Satisfactory
  • 12.5%Fair
  • 1.8%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.8%Excellent
  • 8.9%Very good
  • 35.7%Good
  • 42.9%Satisfactory
  • 7.1%Fair
  • 1.8%Poor
  • 1.8%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.4%Very good
  • 40.7%Good
  • 38.9%Satisfactory
  • 8.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.8%Very good
  • 41.2%Good
  • 39.7%Satisfactory
  • 7.4%Fair
Find on map >>   Show street view

Structure Number: 21072,  Location: _.1 mile s. us 72 (Lat: 34.785533,  Lng: -86.960700),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,800 (year 2035),  Design Load: HS 20,  Features Intersected: _branch,  Facility Carried by Structure: _french farms road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,575,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,733,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21241,  Location: _5th Ave. And Town Creek (Lat: 34.812367,  Lng: -86.979217),  Route carried "on" structure: City street 5,  Year Built: 1996,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 350 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,250 (year 2032),  Design Load: HS 20,  Features Intersected: town creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.93m (6.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $589,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21253,  Location: _SEC 1 T35 R5W (Lat: 34.805772,  Lng: -87.014483),  Route carried "on" structure: County highway 52C,  Year Built: 2017,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 969 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,440 (year 2036),  Design Load: HS 20,  Features Intersected: _ROUND ISLAND CREEK,  Facility Carried by Structure: _QUINN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $597,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $657,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21277,  Location: T4S R6W SEC 16 (Lat: 34.721258,  Lng: -87.121172),  Route carried "on" structure: County highway 20,  Year Built: 2016,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,125 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,670 (year 2027),  Design Load: HS 20,  Features Intersected: Douglas Branch,  Facility Carried by Structure: Shaw Road
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 77.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.29m (4.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $540,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21375,  Location: .5 Mi. E. US 31 (Lat: 34.795056,  Lng: -86.949028),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,160 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,912 (year 2040),  Design Load: HS 20,  Features Intersected: Swan Creek (MC),  Facility Carried by Structure: Nick Davis RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,698,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $1,868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21376,  Location: .3 Mi. E. US 31 (Lat: 34.796417,  Lng: -86.951250),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,160 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,912 (year 2040),  Design Load: HS 20,  Features Intersected: Swan Creek (Relief),  Facility Carried by Structure: Nick Davis Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,698,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $1,868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8188,  Location: 2.5 MI N JCT I 65 & SR 3 (Lat: 34.860000,  Lng: -86.926667),  Route carried "under" structure: ServiceCounty highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 1,576 (year 2020),  Truck Traffic: 1%,  Features Intersected: I 65,  Facility Carried by Structure: BLACK RD
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 8188,  Location: 2.5 MI N JCT I 65 & SR 3 (Lat: 34.860000,  Lng: -86.926667),  Route carried "under" structure: Interstate 65,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 23,780 (year 2020),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: BLACK RD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 573.833,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 8237,  Location: 3 MI N JCT SR 3 & SR 2 (Lat: 34.827667,  Lng: -86.939472),  Route carried "under" structure: Interstate 65,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 22,730 (year 2021),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 569.923,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 9916,  Location: 1 M N JCT SR 2 & I 65 (Lat: 34.797047,  Lng: -86.939522),  Route carried "under" structure: Interstate 65,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 22,730 (year 2020),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: FORREST ST
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 566.288,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 9961,  Location: JCT SR 2 & I 65 (Lat: 34.783333,  Lng: -86.938333),  Route carried "under" structure: Interstate 65,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 22,730 (year 2020),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 564.943,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 9962,  Location: JCT SR 2 & I 65 (Lat: 34.783333,  Lng: -86.938333),  Route carried "under" structure: Interstate 65,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 22,730 (year 2020),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 564.943,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 10106,  Location: JCT I 65 & SR 251 (Lat: 34.811667,  Lng: -86.938333),  Route carried "under" structure: Interstate 65,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 22,730 (year 2020),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: SR 251
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 567.987,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 10688,  Location: 4 MI S JCT SR 2 & I 65 (Lat: 34.730000,  Lng: -86.935000),  Route carried "under" structure: Interstate 65,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 25,660 (year 2020),  Truck Traffic: 39%,  Features Intersected: I 65,  Facility Carried by Structure: HSV Brown Ferry RD
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 559.104,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 11393,  Location: JCT SR 2 & SR 3 (Lat: 34.786667,  Lng: -86.956667),  Route carried "under" structure: US 31,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 9,400 (year 2020),  Truck Traffic: 7%,  Features Intersected: SR 3,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 373.149,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 158,  Location: 3 MI N JCT SR 3 & SR 2 (Lat: 34.827875,  Lng: -86.939292),  Route carried "under" structure: Interstate 65,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 22,730 (year 2021),  Truck Traffic: 44%,  Features Intersected: I 65,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 569.923,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Discuss Athens, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.