Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Vermilion, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 669ft / 204mTotal length
  • $1,500,000Total costs
  • 700,368Total average daily traffic
  • 131,691Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Vermilion
  • No street view available for this location

New bridges in Vermilion, OH - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11920-1929
  • 141950-1959
  • 261970-1979
  • 11980-1989
  • 61990-1999
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Vermilion, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 21990-1999
Average Bridge Daily Traffic in Vermilion, OH
Average Bridge Truck Traffic in Vermilion, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Excellent
  • 6.1%Very good
  • 57.6%Good
  • 9.1%Satisfactory
  • 6.1%Fair
  • 3.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 32.4%Very good
  • 38.2%Good
  • 8.8%Satisfactory
  • 8.8%Fair
  • 2.9%Poor
  • 2.9%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 17.6%Very good
  • 55.9%Good
  • 11.8%Satisfactory
  • 8.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 5.6%Very good
  • 44.4%Good
  • 38.9%Satisfactory
  • 5.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 220494,  Location: OVER SR 60 (Lat: 41.397750,  Lng: -82.365061),  Route carried "under" structure: State highway 60,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 9,365 (year 2015),  Truck Traffic: 4%,  Features Intersected: UNDER ERI-002 -2962R,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 13.132,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 2229927,  Location: 11.2MI WEST OF EXIT 8A (Lat: 41.338111,  Lng: -82.359981),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 40,322 (year 2017),  Truck Traffic: 35%,  Features Intersected: SR60 SAVANNAH-VER RD,  Facility Carried by Structure: I80 OHIO TPK
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 41.038,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 2229986,  Location: 10.4MI WEST OF EXIT 8A (Lat: 41.343089,  Lng: -82.344669),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 40,322 (year 2017),  Truck Traffic: 35%,  Features Intersected: DEAN RD,  Facility Carried by Structure: I80 OHIO TPK
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 42.310,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 4707761,  Location: .3 MI E OF ERIE CO LINE (Lat: 41.402139,  Lng: -82.341169),  Route carried "under" structure: State highway 17,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 30,401 (year 2015),  Truck Traffic: 12%,  Features Intersected: UNDER WEST RIVER RD TH-6,  Facility Carried by Structure: T-69 WEST RIVER
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 4707834,  Location: 1.07 MI E OF ERIE CO LINE (Lat: 41.403331,  Lng: -82.326561),  Route carried "under" structure: State highway 18,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 30,401 (year 2015),  Truck Traffic: 11%,  Features Intersected: UNDER VERMILION RD TH-70,  Facility Carried by Structure: T-70 VERMILION RD
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 470785,  Location: 1.51 MI E OF ERIE CO LINE (Lat: 41.403800,  Lng: -82.318031),  Route carried "under" structure: State highway 19,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 24,472 (year 2015),  Truck Traffic: 10%,  Features Intersected: U/ VERMILION INT CR-7000,  Facility Carried by Structure: T-70 Vermilion Rd
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 4707877,  Location: 2.23 MI E OF ERIE CO LINE (Lat: 41.403700,  Lng: -82.304250),  Route carried "under" structure: State highway 20,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 26,577 (year 2015),  Truck Traffic: 10%,  Features Intersected: UNDER SUNNYSIDE RD T624,  Facility Carried by Structure: T-624 SUNNYSIDE RD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.589,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 4707893,  Location: 2.62 MI E OF ERIE CO LINE (Lat: 41.403600,  Lng: -82.296661),  Route carried "under" structure: State highway 21,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 26,577 (year 2015),  Truck Traffic: 10%,  Features Intersected: UNDER CLAUS RD TH-97,  Facility Carried by Structure: T-97 CLAUS RD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 4.216,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 4707915,  Location: 3.33 MI E OF ERIE CO LINE (Lat: 41.403619,  Lng: -82.283111),  Route carried "under" structure: County highway 51,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,435 (year 2015),  Truck Traffic: 8%,  Features Intersected: UNDER LOR-002 -0333R,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 4707923,  Location: 3.33 MI E OF ERIE CO LINE (Lat: 41.403800,  Lng: -82.283119),  Route carried "under" structure: County highway 51,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,435 (year 2015),  Truck Traffic: 8%,  Features Intersected: UNDER LOR-002 -0333L,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 4728793,  Location: 9.7MI WEST OF EXIT 8A (Lat: 41.344850,  Lng: -82.332019),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 40,573 (year 2015),  Truck Traffic: 27%,  Features Intersected: GORE-ORPHANAGE RD,  Facility Carried by Structure: I80 OHIO TPK
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 4728831,  Location: 7.8MI WEST OF EXIT 8A (Lat: 41.354511,  Lng: -82.298919),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 40,573 (year 2015),  Truck Traffic: 27%,  Features Intersected: VERMILION RD,  Facility Carried by Structure: I80 OHIO TPK
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 4.056,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 4728882,  Location: 7.4MI WEST OF EXIT 8A (Lat: 41.357061,  Lng: -82.292481),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 40,573 (year 2015),  Truck Traffic: 27%,  Features Intersected: GIFFORD RD,  Facility Carried by Structure: I80 OHIO TPK
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 4.667,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Discuss Vermilion, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.