Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Temple, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 227Number of bridges
  • 3,865ft / 1,178mTotal length
  • $79,406,000Total costs
  • 3,143,596Total average daily traffic
  • 393,455Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Temple
  • No street view available for this location

New bridges in Temple, TX - historical statistics
  • New bridges - historical statistics
  • 121930-1939
  • 61940-1949
  • 121950-1959
  • 231960-1969
  • 271970-1979
  • 251980-1989
  • 341990-1999
  • 212000-2009
  • 672010-2019
Reconstructed bridges in Temple, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 21960-1969
  • 61970-1979
  • 61980-1989
  • 41990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Temple, TX
Average Bridge Truck Traffic in Temple, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.1%Very good
  • 78.8%Good
  • 16.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.0%Very good
  • 58.5%Good
  • 18.6%Satisfactory
  • 0.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.6%Very good
  • 56.8%Good
  • 22.9%Satisfactory
  • 6.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.9%Very good
  • 35.2%Good
  • 46.1%Satisfactory
  • 14.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.9%Very good
  • 49.3%Good
  • 43.5%Satisfactory
  • 4.3%Fair
Find on map >>   Show street view

Structure Number: 90140032001084,  Location: 2.40 MI NW OF FM 93 (Lat: 31.055217,  Lng: -97.330872),  Route carried "under" structure: State highway 95,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 6,390 (year 2015),  Truck Traffic: 6%,  Features Intersected: SH 95,  Facility Carried by Structure: US 190
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 21.787,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Structure Number: 90140032005086,  Location: 0.60 MI SE OF IH 35,  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 53 (year 2016),  Features Intersected: BNSF RR & OLD TROY RD,  Facility Carried by Structure: LP 363
Minimum Vertical Clearance: 10.77m (35.33ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 9014003200509,  Location: 0.50 MI S OF SH 53 (Lat: 31.081708,  Lng: -97.312900),  Route carried "under" structure: State highway 363,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 8,950 (year 2015),  Truck Traffic: 4%,  Features Intersected: LP 363,  Facility Carried by Structure: LITTLE FLOCK RD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 39.328,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Structure Number: 90140032006403,  Location: 2.20 MI NE OF SH 36,  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2016),  Truck Traffic: 25%,  Features Intersected: WENDLAND RD,  Facility Carried by Structure: LP 363 NB
Minimum Vertical Clearance: 5.21m (17.09ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Structure Number: 90140032006404,  Location: 2.20 MI NE OF SH 36,  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2016),  Truck Traffic: 25%,  Features Intersected: WENDLAND RD,  Facility Carried by Structure: LP 363 SB
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 90140039804043,  Location: 1.55 MI E OF FM 2271 (Lat: 31.121283,  Lng: -97.443575),  Route carried "under" structure: State highway 317,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 18,570 (year 2015),  Truck Traffic: 13%,  Features Intersected: SH 317,  Facility Carried by Structure: FM 2305
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 1.492,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Discuss Temple, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.