Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rensselaer, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 49Number of bridges
  • 459ft / 140mTotal length
  • $2,225,000Total costs
  • 261,286Total average daily traffic
  • 53,890Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rensselaer
  • No street view available for this location

New bridges in Rensselaer, IN - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 11950-1959
  • 231960-1969
  • 21970-1979
  • 91980-1989
  • 41990-1999
  • 62000-2009
  • 22010-2019
Reconstructed bridges in Rensselaer, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 101990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Rensselaer, IN
Average Bridge Truck Traffic in Rensselaer, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.5%Very good
  • 27.5%Good
  • 55.0%Satisfactory
  • 15.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Excellent
  • 2.5%Very good
  • 22.5%Good
  • 47.5%Satisfactory
  • 22.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.5%Excellent
  • 10.0%Very good
  • 37.5%Good
  • 42.5%Satisfactory
  • 7.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.5%Very good
  • 45.9%Good
  • 29.7%Satisfactory
  • 5.4%Fair
  • 5.4%Poor
Find on map >>   Show street view

Structure Number: 370015,  Location: 00.04 E OF PARKE AVE (Lat: 40.932361,  Lng: -87.152000),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 868 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,237 (year 2032),  Features Intersected: IROQUOIS RIVER,  Facility Carried by Structure: GRACE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.0m (13.1ft), Horizontal Clearance: 10.7m (35.1ft)),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.6m (77.4ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3700151,  Location: 00.10 N OF MILROY AVE (Lat: 40.936611,  Lng: -87.156139),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 4,242 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,046 (year 2039),  Design Load: HS 20,  Features Intersected: IROQUOIS RIVER,  Facility Carried by Structure: COLLEGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 3.7m (12.1ft), Horizontal Clearance: 9.8m (32.2ft)),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.5m (34.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2565,  Location: 03.83 W US-231 (Lat: 40.940731,  Lng: -87.220917),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 17,860 (year 2020),  Truck Traffic: 56%,  Features Intersected: I-65 NBL,  Facility Carried by Structure: SR 114
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 344.786,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2565,  Location: 03.83 W US-231 (Lat: 40.940731,  Lng: -87.220917),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 18,581 (year 2020),  Truck Traffic: 56%,  Features Intersected: I-65 SBL,  Facility Carried by Structure: SR 114
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 344.786,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 381,  Location: 02.04 S SR 114 (Lat: 40.911669,  Lng: -87.213333),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 24,961 (year 2004),  Truck Traffic: 5%,  Features Intersected: I 65 NBL,  Facility Carried by Structure: CR 700S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 341.503,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 381,  Location: 02.04 S SR 114 (Lat: 40.911669,  Lng: -87.213333),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 24,961 (year 2004),  Truck Traffic: 5%,  Features Intersected: I 65 SBL,  Facility Carried by Structure: CR 700S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 341.503,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 3811,  Location: 01.00 S SR-114 (Lat: 40.926269,  Lng: -87.218269),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 24,961 (year 2004),  Truck Traffic: 5%,  Features Intersected: I 65 NBL,  Facility Carried by Structure: CR 600S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 343.177,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 3811,  Location: 01.00 S SR-114 (Lat: 40.926269,  Lng: -87.218269),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 24,961 (year 2004),  Truck Traffic: 5%,  Features Intersected: I 65 SBL,  Facility Carried by Structure: CR 600S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 343.177,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 3814,  Location: 01.89 N SR 114 (Lat: 40.963969,  Lng: -87.238053),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 13,890 (year 2004),  Truck Traffic: 20%,  Features Intersected: I-65 SBL,  Facility Carried by Structure: CR 1000W
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 347.828,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 3814,  Location: 01.89 N SR 114 (Lat: 40.963969,  Lng: -87.238053),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 13,890 (year 2004),  Truck Traffic: 20%,  Features Intersected: I-65 NBL,  Facility Carried by Structure: CR 1000W
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 347.828,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Discuss Rensselaer, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.