Bridge Statistics for Lee, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 65Number of bridges
  • 489ft / 149mTotal length
  • $103,832,000Total costs
  • 561,829Total average daily traffic
  • 103,645Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lee
  • No street view available for this location

New bridges in Lee, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 11910-1919
  • 11920-1929
  • 91930-1939
  • 11940-1949
  • 431950-1959
  • 31970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Lee, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 11930-1939
  • 01940-1949
  • 11950-1959
  • 11960-1969
  • 01970-1979
  • 171980-1989
  • 51990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Lee, MA
Average Bridge Truck Traffic in Lee, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.4%Excellent
  • 4.9%Very good
  • 56.1%Good
  • 22.0%Satisfactory
  • 12.2%Fair
  • 2.4%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.4%Excellent
  • 7.3%Very good
  • 26.8%Good
  • 36.6%Satisfactory
  • 17.1%Fair
  • 9.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.4%Excellent
  • 2.4%Very good
  • 43.9%Good
  • 34.1%Satisfactory
  • 17.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Excellent
  • 7.7%Very good
  • 42.3%Good
  • 26.9%Satisfactory
  • 11.5%Fair
  • 3.8%Poor
  • 3.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: L050494GEDOTNBI,  Location: .7 MI W. MAPLE ST A16 (Lat: 42.298642,  Lng: -73.234981),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.91m (12.83ft),  Average Daily Traffic: 12,181 (year 2010),  Truck Traffic: 22%,  Average Future Daily Traffic: 31,902 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I 90 RAMPS INT 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.059,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 17.5m (57.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.2m (56.4ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,033,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $4,550,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L050504GCDOTNBI,  Location: .2 MI N. OF RTE 102 A17 (Lat: 42.299903,  Lng: -73.222872),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 1,025 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,474 (year 2031),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.024,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.3m (53.5ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,566,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $5,350,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L050514GADOTNBI,  Location: .1 MI N. RTE 20 A18 (Lat: 42.300825,  Lng: -73.203683),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.48m (11.42ft),  Average Daily Traffic: 12,308 (year 2017),  Truck Traffic: 22%,  Average Future Daily Traffic: 31,902 (year 2031),  Design Load: HS 20,  Features Intersected: HWY CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.633,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $566,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L050514GBDOTNBI,  Location: .1 MI N. RTE 20 A18 (Lat: 42.301142,  Lng: -73.203506),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.48m (11.42ft),  Average Daily Traffic: 12,181 (year 2017),  Truck Traffic: 22%,  Average Future Daily Traffic: 31,902 (year 2031),  Design Load: HS 20,  Features Intersected: HWY CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.633,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $566,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L050524G8DOTNBI,  Location: 1 MI W. OF BECKET RD A19 (Lat: 42.296556,  Lng: -73.184758),  Route carried "on" structure: US 20,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 9.97m (32.71ft),  Average Daily Traffic: 13,836 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,546 (year 2031),  Design Load: HS 20,  Features Intersected: I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.404,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,320,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,981,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L050534G9DOTNBI,  Location: .2MI.E.CHESTNUT ST (Lat: 42.300706,  Lng: -73.199075),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 29,416 (year 2016),  Truck Traffic: 22%,  Average Future Daily Traffic: 34,133 (year 2032),  Design Load: HS 20,  Features Intersected: WATER BASIN POND BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.955,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.8m (35.4ft)

Condition: Channel: Serious,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,037,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,556,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: L07004017MUNNBI,  Location: AT INT. W/ CRYSTAL STREET (Lat: 42.332778,  Lng: -73.246389),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 2,800 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,106 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,105,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $3,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L07005AWADOT634,  Location: 100' N INT W/ WILLW 77.57 (Lat: 42.331797,  Lng: -73.245703),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 3.07m (10.07ft),  Average Daily Traffic: 6,724 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,896 (year 2033),  Design Load: HS 20,  Features Intersected: RR HRR,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.7m (87.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,580,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L050414GPDOTNBI,  Location: .3MI.S.DEVON RD (Lat: 42.297272,  Lng: -73.269097),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 11,858 (year 2018),  Truck Traffic: 20%,  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY STKBRG RD
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 14.162,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: L050414GPDOTNBI,  Location: 0.3 MI S DEVON RD (Lat: 42.297272,  Lng: -73.269097),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 12,586 (year 2018),  Truck Traffic: 20%,  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY STKBRG RD
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 14.162,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: L050424GKDOTNBI,  Location: .2 MI E FAIRVIEW ST (Lat: 42.296594,  Lng: -73.251786),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Features Intersected: COMB QUARRY RD & HRR,  Facility Carried by Structure: I 90 EB
Minimum Vertical Clearance: 7.59m (24.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: L050424GLDOTNBI,  Location: .2 MI E FAIRVIEW ST (Lat: 42.296756,  Lng: -73.251803),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Features Intersected: COMB QUARRY RD & HRR,  Facility Carried by Structure: I 90 WB
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: L050434GJDOTNBI,  Location: 0.3 MI E FAIRVIEW ST (Lat: 42.297022,  Lng: -73.248567),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 12,220 (year 2016),  Truck Traffic: 22%,  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY MARBLE ST
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 15.932,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: L050434GJDOTNBI,  Location: .3MI.E.FAIRVIEW ST (Lat: 42.297022,  Lng: -73.248567),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 17,712 (year 2016),  Truck Traffic: 22%,  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY MARBLE ST
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 15.932,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: L050444GGDOTNBI,  Location: AT INT 2 (Lat: 42.297833,  Lng: -73.240656),  Route carried "under" structure: US 20,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 14,992 (year 2019),  Truck Traffic: 12%,  Features Intersected: COMB US20 & HOUSATNC R,  Facility Carried by Structure: I 90 EB
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 30.057,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: L050444GHDOTNBI,  Location: AT INT 2 (Lat: 42.297981,  Lng: -73.240692),  Route carried "under" structure: US 20,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 14,992 (year 2019),  Truck Traffic: 12%,  Features Intersected: COMB US20 & HOUSATNC R,  Facility Carried by Structure: I 90 WB
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 30.055,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: L050464GQDOTNBI,  Location: .2 MI S DEVON RD (Lat: 42.297464,  Lng: -73.280214),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 834 (year 2018),  Truck Traffic: 10%,  Features Intersected: HWY WEST RD,  Facility Carried by Structure: I 90 EB
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.8m (35.4ft)

Find on map >>   Show street view

Structure Number: L050464GRDOTNBI,  Location: .2 MI S DEVON RD (Lat: 42.297772,  Lng: -73.280197),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 834 (year 2018),  Truck Traffic: 10%,  Features Intersected: HWY WEST RD,  Facility Carried by Structure: I 90 WB
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.8m (35.4ft)

Find on map >>   Show street view

Structure Number: L050474GMDOTNBI,  Location: ATT MM 9.4 (Lat: 42.296053,  Lng: -73.257700),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,293 (year 2019),  Truck Traffic: 3%,  Features Intersected: HWY FAIRVIEW ST,  Facility Carried by Structure: I 90 EB
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.1m (33.1ft)

Find on map >>   Show street view

Structure Number: L050474GNDOTNBI,  Location: AT MM 9.4 (Lat: 42.296225,  Lng: -73.257708),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,293 (year 2019),  Truck Traffic: 3%,  Features Intersected: HWY FAIRVIEW ST,  Facility Carried by Structure: I 90 WB
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.1m (33.1ft)

Find on map >>   Show street view

Structure Number: L050484GFDOTNBI,  Location: INT OF RTES 20 & 102 (Lat: 42.296881,  Lng: -73.238961),  Route carried "under" structure: US 20,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 14,992 (year 2019),  Truck Traffic: 15%,  Features Intersected: US 20 HOUSATONIC ST
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 30.063,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.7m (61.4ft)

Find on map >>   Show street view

Structure Number: L050494GDDOTNBI,  Location: .7MI.W.MAPLE ST (Lat: 42.298483,  Lng: -73.234947),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 6,567 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 WB RAMP OFF INTR 2
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 17.059,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.2m (56.4ft)

Find on map >>   Show street view

Structure Number: L050494GEDOTNBI,  Location: .7MI.W.MAPLE ST (Lat: 42.298642,  Lng: -73.234981),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 6,567 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 WB RAMP OFF INTR 2
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 17.059,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.2m (56.4ft)

Find on map >>   Show street view

Structure Number: L050504GCDOTNBI,  Location: 0.1 MI N CHAPEL ST (Lat: 42.299903,  Lng: -73.222872),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 14,608 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 18.024,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.3m (53.5ft)

Find on map >>   Show street view

Structure Number: L050504GCDOTNBI,  Location: .1MI.N.CHAPEL ST (Lat: 42.299903,  Lng: -73.222872),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 15,456 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 18.024,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.3m (53.5ft)

Find on map >>   Show street view

Structure Number: L050514GADOTNBI,  Location: .1 MI N RTE 20 (Lat: 42.300825,  Lng: -73.203683),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Features Intersected: HWY CHESTNUT ST,  Facility Carried by Structure: I 90 EB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: L050514GBDOTNBI,  Location: .1 MI N RTE 20 (Lat: 42.301142,  Lng: -73.203506),  Route carried "under" structure: City street ,  Year Built: 1957,  Structure Length: 0. m,  Features Intersected: HWY CHESTNUT ST,  Facility Carried by Structure: I 90 WB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: L050524G8DOTNBI,  Location: .8MI.W.BECKET RD (Lat: 42.296556,  Lng: -73.184758),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 15,456 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 WB,  Facility Carried by Structure: US 20 CAPE ST
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 21.404,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: L050524G8DOTNBI,  Location: .8MI.W.BECKET RD (Lat: 42.296556,  Lng: -73.184758),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 14,608 (year 2018),  Truck Traffic: 22%,  Features Intersected: I 90 EB,  Facility Carried by Structure: US 20 CAPE ST
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 21.404,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)