Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jasper, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 51Number of bridges
  • 1,132ft / 345mTotal length
  • $125,882,000Total costs
  • 712,721Total average daily traffic
  • 241,914Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jasper
  • No street view available for this location

New bridges in Jasper, TN - historical statistics
  • New bridges - historical statistics
  • 41920-1929
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 141960-1969
  • 21970-1979
  • 201980-1989
  • 21990-1999
  • 42010-2019
Reconstructed bridges in Jasper, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Jasper, TN
Average Bridge Truck Traffic in Jasper, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 80.0%Good
  • 16.7%Satisfactory
  • 3.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.3%Very good
  • 63.3%Good
  • 13.3%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.3%Very good
  • 70.0%Good
  • 13.3%Satisfactory
  • 10.0%Fair
  • 3.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.1%Very good
  • 50.0%Good
  • 37.5%Satisfactory
  • 9.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 58.3%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 58SR0280023,  Location: 3.6 MI N OF SR 2 (Lat: 35.109700,  Lng: -85.573383),  Route carried "on" structure: State highway 28,  Year Built: 1989,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 17,061 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,888 (year 2040),  Design Load: HS 20,  Features Intersected: HALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.755,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 58SR1500003,  Location: 0.88 MI W OF JCT SR28 (Lat: 35.267683,  Lng: -85.463383),  Route carried "on" structure: State highway 150,  Year Built: 2018,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,909 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,432 (year 2040),  Design Load: HL 93,  Features Intersected: STANDIFER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 58SR1500005,  Location: 1.22 MI W OF JCT SR28 (Lat: 35.267683,  Lng: -85.463383),  Route carried "on" structure: State highway 150,  Year Built: 2018,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 2,909 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,432 (year 2040),  Design Load: HL 93,  Features Intersected: PRYOR COVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.5m (31.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 58I00240035,  Location: .5 MI FROM SR 28 (Lat: 35.050250,  Lng: -85.636150),  Route carried "under" structure: City street 386,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2022),  Truck Traffic: 2%,  Features Intersected: I-24 / INDUSTRIAL BLVD,  Facility Carried by Structure: I24
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 4.144,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 58I00240036,  Location: .5 MI FROM SR 28 (Lat: 35.050467,  Lng: -85.635933),  Route carried "under" structure: City street 386,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2022),  Truck Traffic: 2%,  Features Intersected: I-24 / INDUSTRIAL BLVD,  Facility Carried by Structure: I24
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 4.176,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 58I00240039,  Location: NEAR SOUTH PITTSBURG TENN (Lat: 35.040683,  Lng: -85.603533),  Route carried "under" structure: Interstate 24,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 48,699 (year 2020),  Truck Traffic: 43%,  Features Intersected: SHELLMOUND RD. / I-24 EB,  Facility Carried by Structure: NFA 2161
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 36.661,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 58I00240042,  Location: NEAR SOUTH PITTSBURG TENN (Lat: 35.033433,  Lng: -85.581767),  Route carried "under" structure: State highway 27,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 3,422 (year 2020),  Truck Traffic: 11%,  Features Intersected: I-24 WB / SR-27,  Facility Carried by Structure: I24
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 6.880,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 58I00240065,  Location: 3 MI. N. NICKAJACK DAM (Lat: 35.049000,  Lng: -85.630783),  Route carried "under" structure: Interstate 24,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 48,699 (year 2020),  Truck Traffic: 43%,  Features Intersected: SR-28 / I-24,  Facility Carried by Structure: FAP 28
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 33.941,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 58I00240066,  Location: 3 MI. N. NICKAJACK DAM (Lat: 35.048933,  Lng: -85.631100),  Route carried "under" structure: Interstate 24,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 48,399 (year 2020),  Truck Traffic: 43%,  Features Intersected: SR-28 / I-24,  Facility Carried by Structure: FAP 28
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 33.909,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 58I00240069,  Location: 2.5 MI SE JCT SR2&SR150 (Lat: 35.044283,  Lng: -85.602967),  Route carried "under" structure: County highway 2161,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 1,542 (year 2020),  Truck Traffic: 3%,  Features Intersected: I-24 / SHELLMOUND RD,  Facility Carried by Structure: I24 WBL
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 58SR0020027,  Location: IN JASPER (Lat: 35.071850,  Lng: -85.614583),  Route carried "under" structure: State highway 2,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 7,106 (year 2020),  Truck Traffic: 4%,  Features Intersected: SR-28 / SR-2
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 25.621,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 58SR0020028,  Location: IN JASPER (Lat: 35.072033,  Lng: -85.614767),  Route carried "under" structure: State highway 2,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 10,280 (year 2020),  Truck Traffic: 3%,  Features Intersected: SR-28 / SR-2
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 25.589,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.3m (92.8ft)

Discuss Jasper, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.