Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Henryetta, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 81Number of bridges
  • 531ft / 162mTotal length
  • $67,528,000Total costs
  • 293,100Total average daily traffic
  • 63,523Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Henryetta
  • No street view available for this location

New bridges in Henryetta, OK - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 91930-1939
  • 71940-1949
  • 61950-1959
  • 401960-1969
  • 41970-1979
  • 11980-1989
  • 21990-1999
  • 72000-2009
  • 32010-2019
Reconstructed bridges in Henryetta, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 02000-2009
  • 42010-2019
Average Bridge Daily Traffic in Henryetta, OK
Average Bridge Truck Traffic in Henryetta, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 20.0%Good
  • 35.6%Satisfactory
  • 28.9%Fair
  • 6.7%Poor
  • 2.2%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Very good
  • 24.4%Good
  • 33.3%Satisfactory
  • 24.4%Fair
  • 6.7%Poor
  • 2.2%Serious
  • 2.2%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.4%Very good
  • 22.2%Good
  • 40.0%Satisfactory
  • 17.8%Fair
  • 13.3%Poor
  • 2.2%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.9%Excellent
  • 17.3%Very good
  • 21.2%Good
  • 30.8%Satisfactory
  • 21.2%Fair
  • 7.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 18.2%Very good
  • 31.8%Good
  • 36.4%Satisfactory
  • 9.1%Fair
  • 4.5%Serious
Find on map >>   Show street view

Structure Number: 15795,  Location: 5.49 E OKFUSKEE C/L (Lat: 35.432789,  Lng: -95.991075),  Route carried "on" structure: Interstate 40,  Year Built: 1963,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 7,650 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 12,240 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.215,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.87m (32.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $791,000,  Roadway Improvement Cost: $1,306,000,  Total Project Cost: $2,216,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15797,  Location: 8.5 S SH56 (Lat: 35.500428,  Lng: -96.034586),  Route carried "on" structure: County highway 5648C,  Year Built: 1963,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 380 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 608 (year 2040),  Design Load: HS 20,  Features Intersected: MONTEZUMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $680,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15828,  Location: 2.64 E OKFUSKEE C/L (Lat: 35.431325,  Lng: -96.041250),  Route carried "on" structure: County highway N3916,  Year Built: 1963,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 125 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 15,  Features Intersected: I-40 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.249,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $710,000,  Roadway Improvement Cost: $1,171,000,  Total Project Cost: $1,987,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15906,  Location: 7.46 E OKFUSKEE C/L (Lat: 35.429858,  Lng: -95.956281),  Route carried "on" structure: Interstate 40,  Year Built: 1964,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 12,400 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 19,840 (year 2040),  Design Load: HS 20,  Features Intersected: VAUGHAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.002,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 90.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $815,000,  Total Project Cost: $1,384,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16131,  Location: 6.58 E OKFUSKEE C/L (Lat: 35.432044,  Lng: -95.971894),  Route carried "on" structure: Interstate 40,  Year Built: 1964,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 7,650 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 12,240 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 62 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.038,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $1,470,000,  Total Project Cost: $2,495,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16132,  Location: 6.58 E OKFUSKEE C/L (Lat: 35.432425,  Lng: -95.971775),  Route carried "on" structure: Interstate 40,  Year Built: 1964,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 7,650 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 12,240 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 62 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.038,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $1,470,000,  Total Project Cost: $2,495,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16428,  Location: 6.6 NE US75 BUS (Lat: 35.492856,  Lng: -96.045306),  Route carried "on" structure: County highway 5628,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.618,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.46m (14.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $362,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16496,  Location: 3.96 MI'S S. JCT I-40 (Lat: 35.376650,  Lng: -95.960556),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,960 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. E1130 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $473,000,  Roadway Improvement Cost: $710,000,  Total Project Cost: $1,360,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16504,  Location: 0.1 W JCT US-75 (Lat: 35.439758,  Lng: -95.971828),  Route carried "on" structure: Business US 75B,  Year Built: 1965,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 13,200 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,120 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.406,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,600,000,  Roadway Improvement Cost: $2,640,000,  Total Project Cost: $4,480,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16521,  Location: 0.74 N JCT I-40 (Lat: 35.442636,  Lng: -95.970000),  Route carried "on" structure: US 62,  Year Built: 1965,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,880 (year 2040),  Design Load: HL 93,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.917,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $994,000,  Roadway Improvement Cost: $1,640,000,  Total Project Cost: $2,783,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16522,  Location: 0.74 N JCT I-40 (Lat: 35.442919,  Lng: -95.970250),  Route carried "on" structure: US 62,  Year Built: 1965,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 9,150 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,640 (year 2040),  Design Load: HL 93,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.917,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $994,000,  Roadway Improvement Cost: $1,640,000,  Total Project Cost: $2,783,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17768,  Location: 5.42 MI'S S. JCT I-40 (Lat: 35.355103,  Lng: -95.957053),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,960 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.618,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 36.3m (119.1ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17769,  Location: 4.48 MI'S S. JCT I-40 (Lat: 35.362472,  Lng: -95.956681),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,960 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.551,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 37.8m (124.0ft),  Out-to-Out Width: 38.4m (126.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18835,  Location: 1.7 MI W OF SH 75 (Lat: 35.441961,  Lng: -96.000047),  Route carried "on" structure: City street 1944,  Year Built: 1975,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22073,  Location: 2.4 E US75 (Lat: 35.503794,  Lng: -95.923325),  Route carried "on" structure: County highway 5628C,  Year Built: 1988,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: DEEP FORK CANADIAN RIV.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.95m (32.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $794,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22513,  Location: 1.5 S; 1.5 W SCHULTER (Lat: 35.501419,  Lng: -95.981403),  Route carried "on" structure: County highway N3950,  Year Built: 1990,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BURGESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24219,  Location: .33 MI'S S. JCT I-40 (Lat: 35.427500,  Lng: -95.972778),  Route carried "on" structure: County highway E1095,  Year Built: 1965,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,960 (year 2040),  Design Load: HS 20,  Features Intersected: IND. NATION TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.452,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $850,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,400,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24758,  Location: 0.1E OKF C/L; 2.0N OLD 62 (Lat: 35.463928,  Lng: -96.085147),  Route carried "on" structure: County highway E1070,  Year Built: 1997,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: MONTEZUMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $369,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2545,  Location: 4.0 MI NW OF I-40 (Lat: 35.471111,  Lng: -96.070000),  Route carried "on" structure: County highway 5628,  Year Built: 2013,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 20,  Features Intersected: MONTEZUMA CREEK,  Facility Carried by Structure: IRR N3900
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.953,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,263,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $3,899,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26509,  Location: 3 S 3.5 E OF PHAROAH (Lat: 35.376572,  Lng: -96.061283),  Route carried "on" structure: County highway E1130,  Year Built: 2001,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BAD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,062,000,  Roadway Improvement Cost: $1,205,000,  Total Project Cost: $2,295,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27279,  Location: 0.5 S I-40; 1.0 E TPK (Lat: 35.424014,  Lng: -95.955975),  Route carried "on" structure: County highway E1097,  Year Built: 2003,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 960 (year 2040),  Features Intersected: NICHOLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27344,  Location: 1.0W HENRYETTA; 1.0N US62 (Lat: 35.444378,  Lng: -96.026044),  Route carried "on" structure: County highway N3925,  Year Built: 2005,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 960 (year 2040),  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27451,  Location: 1400 BLOCK (Lat: 35.442914,  Lng: -95.999750),  Route carried "on" structure: City street E1084,  Year Built: 1975,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 640 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: GENTRY ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 27693,  Location: 12N; 2.9W OF HANNA (Lat: 35.376753,  Lng: -95.944639),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: IRR 4668C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $569,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27824,  Location: 3.0 S 4.5 E OF PHAROAH (Lat: 35.376494,  Lng: -96.044103),  Route carried "on" structure: County highway E1130,  Year Built: 2006,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SALT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.2m (102.4ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $608,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27996,  Location: 2.3 S; 0.8 W HENRYETTA (Lat: 35.405803,  Lng: -96.003844),  Route carried "on" structure: County highway E1110,  Year Built: 2006,  Status: Open,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOBLOLLY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 29551,  Location: 10N 4.1W OF HANNA (Lat: 35.347778,  Lng: -95.966667),  Route carried "on" structure: County highway E1150,  Year Built: 2009,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: HS 20,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.7m (5.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 29562,  Location: 0.5N 0.4E OF BRYANT (Lat: 35.396944,  Lng: -96.054722),  Route carried "on" structure: County highway N3909,  Year Built: 2010,  Status: Open,  Structure Length: 1.45m (4.76ft),  Average Daily Traffic: 380 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 450 (year 2040),  Design Load: HS 20,  Features Intersected: SALT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $299,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30001,  Location: .2S OF I-40 AT HENRYETTA (Lat: 35.431944,  Lng: -95.985833),  Route carried "on" structure: City street N3947,  Year Built: 2013,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,325 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,617 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Total Project Cost: $225,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1572,  Location: 4.01 E OKFUSKEE C/L (Lat: 35.432883,  Lng: -96.017025),  Route carried "under" structure: Business US 75B,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 16%,  Features Intersected: U.S. 75B UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 15721,  Location: 4.01 E OKFUSKEE C/L (Lat: 35.433253,  Lng: -96.017025),  Route carried "under" structure: Business US 75B,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 16%,  Features Intersected: U.S. 75B UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 15722,  Location: 5.31 E OKFUSKEE C/L (Lat: 35.433033,  Lng: -95.994156),  Route carried "under" structure: City street 1949,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Features Intersected: S 10TH ST UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 8.544,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 15723,  Location: 5.81 E OKFUSKEE C/L (Lat: 35.433386,  Lng: -95.994033),  Route carried "under" structure: City street 1949,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Features Intersected: S 10TH ST UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 8.544,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 15726,  Location: 6.03 E OKFUSKEE C/L (Lat: 35.432525,  Lng: -95.981608),  Route carried "under" structure: City street 1961,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Features Intersected: LAKE RD UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 9.703,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 15727,  Location: 6.03 E OKFUSKEE C/L (Lat: 35.432889,  Lng: -95.981608),  Route carried "under" structure: City street 1961,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Features Intersected: LAKE RD UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 9.703,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 15746,  Location: 5.77 E OKFUSKEE C/L (Lat: 35.432558,  Lng: -95.986028),  Route carried "under" structure: City street 1957,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Features Intersected: 4TH ST. UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 9.284,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 15747,  Location: 5.77 E OKFUSKEE C/L (Lat: 35.432922,  Lng: -95.986033),  Route carried "under" structure: City street 1957,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Features Intersected: 4TH ST. UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 9.284,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 15828,  Location: 2.64 E OKFUSKEE C/L (Lat: 35.431325,  Lng: -96.041250),  Route carried "under" structure: Interstate 40,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 36%,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: CO. RD. N3916
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 4.249,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 16131,  Location: 6.58 E OKFUSKEE C/L (Lat: 35.432044,  Lng: -95.971894),  Route carried "under" structure: US 62,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,650 (year 2020),  Truck Traffic: 7%,  Features Intersected: U.S. 62 UNDER,  Facility Carried by Structure: I-40 EB
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 16132,  Location: 6.58 E OKFUSKEE C/L (Lat: 35.432425,  Lng: -95.971775),  Route carried "under" structure: US 62,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,650 (year 2020),  Truck Traffic: 8%,  Features Intersected: U.S. 62 UNDER,  Facility Carried by Structure: I-40 WB
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 16496,  Location: 3.96 MI'S S. JCT I-40 (Lat: 35.376650,  Lng: -95.960556),  Route carried "under" structure: County highway E1130,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. E1130 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.637,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 16524,  Location: 5.98 MI'S S. JCT I-40 (Lat: 35.347817,  Lng: -95.957608),  Route carried "under" structure: Other road ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 25%,  Features Intersected: IND. NATION TP UNDER,  Facility Carried by Structure: CO. RD. 4624C
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 23.813,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 24219,  Location: .33 MI'S S. JCT I-40 (Lat: 35.427500,  Lng: -95.972778),  Route carried "under" structure: Other road ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: IND. NATION TP UNDER,  Facility Carried by Structure: CO. RD. E1095
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.053,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss Henryetta, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.