Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Heflin, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 71Number of bridges
  • 807ft / 246mTotal length
  • $76,932,000Total costs
  • 410,326Total average daily traffic
  • 153,185Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Heflin
  • No street view available for this location

New bridges in Heflin, AL - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 21930-1939
  • 91940-1949
  • 21950-1959
  • 71960-1969
  • 201970-1979
  • 41980-1989
  • 41990-1999
  • 152000-2009
  • 32010-2019
Reconstructed bridges in Heflin, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Heflin, AL
Average Bridge Truck Traffic in Heflin, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.0%Excellent
  • 12.5%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 32.5%Fair
  • 7.5%Poor
  • 2.5%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.5%Excellent
  • 10.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
  • 2.5%Poor
  • 2.5%Serious
  • 2.5%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.5%Excellent
  • 7.5%Very good
  • 47.5%Good
  • 10.0%Satisfactory
  • 27.5%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.8%Excellent
  • 22.8%Very good
  • 17.5%Good
  • 29.8%Satisfactory
  • 24.6%Fair
  • 3.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Excellent
  • 16.7%Very good
  • 16.7%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 179,  Location: 1.7 M E OF CO 532 (Lat: 33.008761,  Lng: -85.631169),  Route carried "on" structure: County highway 569,  Year Built: 1921,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 85 (year 2008),  Average Future Daily Traffic: 105 (year 2030),  Features Intersected: GALLAWAY CREEK,  Facility Carried by Structure: WILLOUGHBY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $157,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 588,  Location: 1.8 MI E CALHOUN CO LINE (Lat: 33.643717,  Lng: -85.618697),  Route carried "on" structure: US 78,  Year Built: 1929,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 4,258 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,961 (year 2039),  Design Load: H 15,  Features Intersected: ROCKY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.766,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $270,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 589,  Location: 2.1 MI E CALHOUN CO LINE (Lat: 33.639600,  Lng: -85.615681),  Route carried "on" structure: US 78,  Year Built: 1929,  Status: Open,  Structure Length: 1.35m (4.43ft),  Average Daily Traffic: 4,258 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,961 (year 2039),  Design Load: H 15,  Features Intersected: ROCKY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 279.297,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $706,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 59,  Location: 2.5 MI E CALHOUN CO LINE (Lat: 33.638881,  Lng: -85.609617),  Route carried "on" structure: US 78,  Year Built: 1929,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,258 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,961 (year 2039),  Design Load: H 15,  Features Intersected: ROCKY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 279.936,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $350,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1846,  Location: 1 MI EAST OF HWY 46 (Lat: 33.644231,  Lng: -85.483069),  Route carried "on" structure: County highway 114,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 210 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 425 (year 2035),  Design Load: H 10,  Features Intersected: JOHNYWADY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.8m (12.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $156,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1858,  Location: 0.4 MI E JCT CO RD 106 (Lat: 34.977069,  Lng: -86.670161),  Route carried "on" structure: County highway 274,  Year Built: 1938,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 350 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 730 (year 2040),  Design Load: H 15,  Features Intersected: BRIER FORK FLINT RIVER,  Facility Carried by Structure: ELKWOOD SECTION R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $339,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2107,  Location: 1.2 MI E JCT US 78 (Lat: 33.654361,  Lng: -85.560528),  Route carried "on" structure: State highway 46,  Year Built: 1927,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,653 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,314 (year 2039),  Design Load: H 15,  Features Intersected: MCDANIEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.782,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $369,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2375,  Location: 1.7 MI E JCT I-20 (Lat: 33.635833,  Lng: -85.488278),  Route carried "on" structure: State highway 46,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,281 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,193 (year 2039),  Design Load: H 15,  Features Intersected: JOHNYWADY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.682,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $439,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $483,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2409,  Location: CO 71 TALLAPOOSA RIVER (Lat: 33.606425,  Lng: -85.462894),  Route carried "on" structure: County highway 71,  Year Built: 1940,  Status: Closed,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 192 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 250 (year 2035),  Design Load: H 10,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Fair,  Channel: Satisfactory,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 1 months,  Inspection Date: Febuary 2016,  Critical Feature Inspection Date: Febuary 2016,  Other Special Inspection Date: March 2020,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $593,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2667,  Location: JCT SR 9 * US 78 (Lat: 33.641056,  Lng: -85.590397),  Route carried "on" structure: State highway 9,  Year Built: 1942,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,495 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,493 (year 2039),  Design Load: H 15,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 346.011,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $886,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $975,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3425,  Location: CO 19 CEDAR CREEK (Lat: 33.576697,  Lng: -85.578133),  Route carried "on" structure: County highway 19,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 960 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,510 (year 2035),  Design Load: H 10,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $240,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3426,  Location: CO 19 DYNNE CREEK (Lat: 33.567792,  Lng: -85.560689),  Route carried "on" structure: County highway 19,  Year Built: 1949,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 960 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,510 (year 2035),  Design Load: H 15,  Features Intersected: DYNNE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $378,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3427,  Location: CO 19 DYNNE CREEK (Lat: 33.564911,  Lng: -85.560942),  Route carried "on" structure: County highway 19,  Year Built: 1949,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 960 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,100 (year 2035),  Design Load: H 15,  Features Intersected: DYNNE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $303,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4048,  Location: CR 863 TALLAPOOSA RIVER (Lat: 33.607986,  Lng: -85.577431),  Route carried "on" structure: County highway 863,  Year Built: 1951,  Status: Posted for load,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 45 (year 2008),  Average Future Daily Traffic: 75 (year 2035),  Design Load: H 10,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 3.03m (9.94ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 1 months,  Inspection Date: Febuary 2022,  Critical Feature Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $613,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4077,  Location: CR 84 TALLAPOOSA RIVER (Lat: 33.616817,  Lng: -85.555158),  Route carried "on" structure: County highway 84,  Year Built: 1951,  Status: Posted for load,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 60 (year 2010),  Average Future Daily Traffic: 100 (year 2034),  Design Load: H 10,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 3.10m (10.17ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 1 months,  Inspection Date: Febuary 2022,  Critical Feature Inspection Date: Febuary 2022,  Underwater Inspection Date: July 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $687,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $756,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7949,  Location: CANE CREEK CO 18 (Lat: 33.629661,  Lng: -85.535322),  Route carried "on" structure: County highway 18,  Year Built: 1963,  Status: Posted for load,  Structure Length: 9.28m (30.45ft),  Average Daily Traffic: 300 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2035),  Design Load: H 15,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.24m (33.60ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,475,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,623,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 9867,  Location: 6.6 MI E JCT US 431 (Lat: 33.620858,  Lng: -85.611114),  Route carried "on" structure: Interstate 20,  Year Built: 1969,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 21,630 (year 2019),  Truck Traffic: 43%,  Average Future Daily Traffic: 30,282 (year 2039),  Design Load: HS 20,  Features Intersected: CAHULGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 319.369,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.93m (29.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,510,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9868,  Location: 6.6 MI E JCT US 431 (Lat: 33.620678,  Lng: -85.610872),  Route carried "on" structure: Interstate 20,  Year Built: 1969,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 21,630 (year 2019),  Truck Traffic: 43%,  Average Future Daily Traffic: 30,282 (year 2039),  Design Load: HS 20,  Features Intersected: CAHULGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 319.369,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.93m (29.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,510,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9984,  Location: JCT SR 9 AND I-20 (Lat: 33.621314,  Lng: -85.595953),  Route carried "on" structure: State highway 9,  Year Built: 1969,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 7,939 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,114 (year 2039),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 343.806,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,521,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $2,773,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10174,  Location: 1.1 MI E JCT SR 9 (Lat: 33.621967,  Lng: -85.577156),  Route carried "on" structure: County highway 21,  Year Built: 1970,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 1,189 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,665 (year 2040),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 200.619,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.61m (31.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,912,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10175,  Location: 2.4 MI E JCT SR 9 (Lat: 33.628572,  Lng: -85.555950),  Route carried "on" structure: County highway 84,  Year Built: 1970,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 855 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,750 (year 2040),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 201.920,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.61m (31.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,912,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10176,  Location: 3.5 MI E JCT SR 9 (Lat: 33.633900,  Lng: -85.538750),  Route carried "on" structure: County highway 18,  Year Built: 1970,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 242 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 339 (year 2039),  Design Load: HS 20,  Features Intersected: I20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.999,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,452,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,697,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10177,  Location: 4 MI E JCT SR 9 (Lat: 33.637014,  Lng: -85.530586),  Route carried "on" structure: Interstate 20,  Year Built: 1970,  Status: Open,  Structure Length: 13.26m (43.50ft),  Average Daily Traffic: 20,810 (year 2019),  Truck Traffic: 44%,  Average Future Daily Traffic: 29,134 (year 2039),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 327.242,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.07m (46.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,150,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $4,565,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10178,  Location: 4 MI E JCT SR 9 (Lat: 33.636806,  Lng: -85.530469),  Route carried "on" structure: Interstate 20,  Year Built: 1970,  Status: Open,  Structure Length: 13.26m (43.50ft),  Average Daily Traffic: 20,810 (year 2019),  Truck Traffic: 44%,  Average Future Daily Traffic: 29,134 (year 2039),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 327.242,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.07m (46.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,150,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $4,565,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10349,  Location: JCT I-20 AND SR46 (Lat: 33.645686,  Lng: -85.503592),  Route carried "on" structure: State highway 46,  Year Built: 1970,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 1,748 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,447 (year 2040),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.927,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.59m (41.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,885,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $4,274,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10462,  Location: 2.4 MI E JCT AL 46 (Lat: 33.644903,  Lng: -85.461417),  Route carried "on" structure: County highway 62,  Year Built: 1971,  Status: Open,  Structure Length: 8.62m (28.28ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 333.627,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.61m (31.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,910,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,101,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10463,  Location: 3.4 MI E JCT AL 46 (Lat: 33.644019,  Lng: -85.444422),  Route carried "on" structure: Interstate 20,  Year Built: 1971,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 34,228 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 47,919 (year 2040),  Design Load: HS 20,  Features Intersected: SMALL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 335.344,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,279,000,  Roadway Improvement Cost: $428,000,  Total Project Cost: $4,707,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1063,  Location: 0.5 MI NW US 78 (Lat: 33.656792,  Lng: -85.591019),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 80 (year 2021),  Average Future Daily Traffic: 225 (year 2041),  Design Load: H 15,  Features Intersected: CAHULGA CREEK,  Facility Carried by Structure: CAMPBELL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 7.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $272,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10631,  Location: OFF BONNER LAKE RD (Lat: 33.623714,  Lng: -85.621294),  Route carried "on" structure: County highway 460,  Year Built: 1971,  Status: Posted for load,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 20 (year 2010),  Average Future Daily Traffic: 30 (year 2035),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 20.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $288,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11208,  Location: CO 19 SNAKE CREEK (Lat: 33.593106,  Lng: -85.603897),  Route carried "on" structure: County highway 19,  Year Built: 1974,  Status: Temporarily open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 971 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,300 (year 2035),  Features Intersected: SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $398,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11248,  Location: 0.8 MI SE I-20 (Lat: 33.612789,  Lng: -85.573817),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2041),  Design Load: H 10,  Features Intersected: BRANCH,  Facility Carried by Structure: RIVER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $286,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12236,  Location: 1.0 MI E CALHOUN CO LINE (Lat: 33.645539,  Lng: -85.630731),  Route carried "on" structure: State highway 281,  Year Built: 1979,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 112 (year 2040),  Design Load: HS 20,  Features Intersected: AL4/US 78
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 800.005,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,017,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,219,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1227,  Location: CR 18 TALLAPOOSA RIVER (Lat: 33.622836,  Lng: -85.513517),  Route carried "on" structure: County highway 18,  Year Built: 1948,  Year Reconstructed: 1980,  Status: Closed,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 320 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 700 (year 2035),  Design Load: H 10,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2018,  Critical Feature Inspection Date: Febuary 2018,  Other Special Inspection Date: March 2020,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $618,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12558,  Location: CO 19 DYNNE CREEK (Lat: 33.565606,  Lng: -85.560856),  Route carried "on" structure: County highway 19,  Year Built: 1981,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 650 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2035),  Design Load: H 15,  Features Intersected: DYNNE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $747,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13065,  Location: DAVIDSON RD * CANE CREEK (Lat: 33.659697,  Lng: -85.516256),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 410 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 895 (year 2041),  Design Load: H 15,  Features Intersected: CANE CREEK,  Facility Carried by Structure: DAVIDSON RD/CR 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,072,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,179,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1405,  Location: 5.5 MI N JCT US 431 (Lat: 33.592383,  Lng: -85.609367),  Route carried "on" structure: State highway 9,  Year Built: 1987,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 3,627 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,078 (year 2039),  Design Load: HS 20,  Features Intersected: SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 340.199,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,769,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,946,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14188,  Location: 2.6 MI E CALHOUN CO. LINE (Lat: 33.639478,  Lng: -85.607483),  Route carried "on" structure: State highway 4,  Year Built: 1987,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 4,258 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,961 (year 2039),  Design Load: HS 20,  Features Intersected: CAHULGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 280.081,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.45m (8.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,331,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,464,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15815,  Location: 7.5 MI E HEFLIN (Lat: 33.616925,  Lng: -85.474150),  Route carried "on" structure: State highway 46,  Year Built: 1993,  Status: Open,  Structure Length: 15.39m (50.49ft),  Average Daily Traffic: 2,537 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,552 (year 2038),  Design Load: HS 20,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.953,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.15m (52.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,763,000,  Roadway Improvement Cost: $476,000,  Total Project Cost: $5,239,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17899,  Location: APROX. 1MI N OF HYW 78 (Lat: 33.765578,  Lng: -85.426928),  Route carried "on" structure: County highway 35,  Year Built: 2001,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 360 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 820 (year 2035),  Design Load: HS 20,  Features Intersected: ALEWINE CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $701,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $771,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 179,  Location: APROX. 1.5MI N OF HWY 78 (Lat: 33.769519,  Lng: -85.423461),  Route carried "on" structure: County highway 35,  Year Built: 2001,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 360 (year 2001),  Average Future Daily Traffic: 825 (year 2035),  Design Load: HS 20,  Features Intersected: MUSCADINE CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $545,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $600,000 ( Estimate for 2022)
Discuss Heflin, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.