Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fremont, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 138Number of bridges
  • 2,103ft / 641mTotal length
  • $17,179,000Total costs
  • 8,418,736Total average daily traffic
  • 644,736Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fremont
  • No street view available for this location

New bridges in Fremont, CA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31920-1929
  • 51930-1939
  • 21940-1949
  • 91950-1959
  • 111960-1969
  • 361970-1979
  • 121980-1989
  • 231990-1999
  • 172000-2009
  • 192010-2019
Reconstructed bridges in Fremont, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 31980-1989
  • 141990-1999
  • 32000-2009
  • 52010-2019
Average Bridge Daily Traffic in Fremont, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 34.3%Good
  • 20.0%Satisfactory
  • 31.4%Fair
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 75.7%Good
  • 1.4%Satisfactory
  • 22.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 88.6%Good
  • 4.3%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.9%Excellent
  • 29.0%Very good
  • 54.8%Good
  • 3.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 44.4%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 33 0002,  Location: 04-ALA-238-2.19-FMT (Lat: 37.559672,  Lng: -121.955625),  Route carried "under" structure: State highway 238,  Year Built: 1921,  Structure Length: 0. m,  Average Daily Traffic: 112,000 (year 2010),  Truck Traffic: 4%,  Features Intersected: STATE ROUTE 238,  Facility Carried by Structure: UP RR & BARTD
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 2.190,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 33 003,  Location: 04-ALA-084-10.71-FMT (Lat: 37.571556,  Lng: -121.969497),  Route carried "under" structure: State highway 84,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 22,400 (year 2009),  Truck Traffic: 2%,  Features Intersected: STATE ROUTE 84,  Facility Carried by Structure: UP RR,BNSF,AMTRAK
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 10.710,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 33 0034,  Location: 04-ALA-084-12.10-FMT (Lat: 37.589633,  Lng: -121.957686),  Route carried "under" structure: State highway 84,  Year Built: 1906,  Structure Length: 0. m,  Average Daily Traffic: 14,850 (year 2009),  Truck Traffic: 2%,  Features Intersected: STATE ROUTE 84,  Facility Carried by Structure: UP RR SPUR
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 12.100,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 33 0035,  Location: 04-ALA-084-13.03 (Lat: 37.597753,  Lng: -121.946525),  Route carried "under" structure: State highway 84,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 14,850 (year 2009),  Truck Traffic: 2%,  Features Intersected: STATE ROUTE 84,  Facility Carried by Structure: UP RR SPUR
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 13.030,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 33 0053,  Location: 04-ALA-084-10.63-FMT (Lat: 37.570342,  Lng: -121.970014),  Route carried "under" structure: State highway 84,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 22,400 (year 2010),  Truck Traffic: 4%,  Features Intersected: STATE ROUTE 84,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 10.630,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 33 0237,  Location: 04-ALA-880-3.25-FMT (Lat: 37.492111,  Lng: -121.947506),  Route carried "under" structure: Interstate 880,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 161,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: FREMONT BOULEVARD
Minimum Vertical Clearance: 5.60m (18.37ft),  Kilometerpoint: 3.250,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.2m (161.4ft)

Find on map >>   Show street view

Structure Number: 33 0243,  Location: 04-ALA-084-R5.98-FMT (Lat: 37.563064,  Lng: -122.038628),  Route carried "under" structure: Interstate 880,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 189,000 (year 2010),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: STATE ROUTE 84
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 10.300,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 33 0261L,  Location: 04-ALA-880-8.25-FMT (Lat: 37.538989,  Lng: -122.017572),  Route carried "under" structure: Interstate 880,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 197,000 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: CENTRAL AVE SB
Minimum Vertical Clearance: 5.90m (19.36ft),  Kilometerpoint: 8.250,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 33 0261R,  Location: 04-ALA-880-8.24-FMT (Lat: 37.538856,  Lng: -122.017469),  Route carried "under" structure: Interstate 880,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 197,000 (year 2019),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: CENTRAL AVE NB
Minimum Vertical Clearance: 5.42m (17.78ft),  Kilometerpoint: 8.240,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 33 0262,  Location: 04-ALA-880-8.54-FMT (Lat: 37.542433,  Lng: -122.020189),  Route carried "under" structure: Interstate 880,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 187,000 (year 2009),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: UP RR, AMTRAK, ACE
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 8.540,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.8m (140.4ft)

Find on map >>   Show street view

Structure Number: 33 0264,  Location: 04-ALA-084-6.93-FMT (Lat: 37.546175,  Lng: -122.023056),  Route carried "under" structure: Interstate 880,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 200,000 (year 2010),  Truck Traffic: 13%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: SR 84 (THORNTON)
Minimum Vertical Clearance: 5.60m (18.37ft),  Kilometerpoint: 8.840,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.1m (157.8ft)

Find on map >>   Show street view

Structure Number: 33 0267L,  Location: 04-ALA-880-7.19-FMT (Lat: 37.529497,  Lng: -122.002531),  Route carried "under" structure: Interstate 880,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 187,000 (year 2017),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: MOWRY AVENUE WB
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 7.190,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 33 0267R,  Location: 04-ALA-880-7.18-FMT (Lat: 37.529389,  Lng: -122.002336),  Route carried "under" structure: Interstate 880,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 187,000 (year 2017),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: MOWRY AVENUE EB
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 7.180,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.0m (131.2ft)

Find on map >>   Show street view

Structure Number: 33 0268,  Location: 04-ALA-880-4.71-FMT (Lat: 37.507081,  Lng: -121.967672),  Route carried "under" structure: Interstate 880,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 161,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: AUTO MALL PARKWAY
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 4.710,  Lanes on structure: 8,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 33 0286,  Location: 04-ALA-880-8.52-FMT (Lat: 37.542828,  Lng: -122.019689),  Route carried "under" structure: Interstate 880,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 187,000 (year 2009),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: PG&E PIPELINE
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 8.520,  Lanes under structure: 10,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 33 0294,  Location: 04-ALA-680-R6.38-FMT (Lat: 37.540306,  Lng: -121.924547),  Route carried "under" structure: State highway 238,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2018),  Truck Traffic: 3%,  Features Intersected: SR 238 (MISSION BLVD),  Facility Carried by Structure: INTERSTATE 680
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.010,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 33 036,  Location: 04-ALA-680-M5.91-FMT (Lat: 37.535569,  Lng: -121.933572),  Route carried "under" structure: Interstate 680,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: PALM AVE
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 5.910,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 33 0361,  Location: 04-ALA-680-M5.37-FMT (Lat: 37.531064,  Lng: -121.942278),  Route carried "under" structure: Interstate 680,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: WASHINGTON BLVD
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 5.370,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.3m (171.6ft)

Find on map >>   Show street view

Structure Number: 33 0368,  Location: 04-ALA-680-M4.02-FMT (Lat: 37.514406,  Lng: -121.940133),  Route carried "under" structure: Interstate 680,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: AUTO MALL PARKWAY
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 4.020,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 33 0405,  Location: 04-ALA-680-M5.67-FMT (Lat: 37.533592,  Lng: -121.937431),  Route carried "under" structure: Interstate 680,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: PASEO PADRE PKWY
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 5.670,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 33 0424L,  Location: 04-ALA-680-M0.13-FMT (Lat: 37.466311,  Lng: -121.905147),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 1%,  Features Intersected: SCOTT CREEK RD,  Facility Carried by Structure: INTERSTATE 680 SB
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.6m (87.3ft)

Find on map >>   Show street view

Structure Number: 33 0424R,  Location: 04-ALA-680-M0.13-FMT (Lat: 37.466247,  Lng: -121.905572),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 1%,  Features Intersected: SCOTT CREEK RD,  Facility Carried by Structure: INTERSTATE 680 NB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 33 0428L,  Location: 04-ALA-680-M2.38-FMT (Lat: 37.495575,  Lng: -121.922700),  Route carried "under" structure: State highway 262,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2018),  Truck Traffic: 8%,  Features Intersected: SR 262 (MISSION BLVD),  Facility Carried by Structure: INTERSTATE 680 SB
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 1.070,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 33 0428R,  Location: 04-ALA-680-M2.38-FMT (Lat: 37.495353,  Lng: -121.923028),  Route carried "under" structure: State highway 262,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2018),  Truck Traffic: 8%,  Features Intersected: SR 262 (MISSION BLVD),  Facility Carried by Structure: INTERSTATE 680 NB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 1.070,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 33 0429L,  Location: 04-ALA-680-M3.35-FMT (Lat: 37.506000,  Lng: -121.934325),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2018),  Truck Traffic: 1%,  Features Intersected: GRIMMER BLVD,  Facility Carried by Structure: INTERSTATE 680 SB
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 33 0429R,  Location: 04-ALA-680-M3.35-FMT (Lat: 37.506206,  Lng: -121.934553),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2018),  Truck Traffic: 1%,  Features Intersected: GRIMMER BLVD,  Facility Carried by Structure: INTERSTATE 680 NB
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 33 0475,  Location: 04-ALA-084-9.66-FMT (Lat: 37.563653,  Lng: -121.984511),  Route carried "under" structure: State highway 84,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 22,400 (year 2009),  Truck Traffic: 2%,  Features Intersected: STATE ROUTE 84,  Facility Carried by Structure: BARTD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 9.660,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 33 0515,  Location: 04-ALA-880-10.93-FMT (Lat: 37.570619,  Lng: -122.045625),  Route carried "under" structure: Interstate 880,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 220,000 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: PASEO PADRE PKWY
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 10.930,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 33 0518,  Location: 04-ALA-084-R3.21-FMT (Lat: 37.535747,  Lng: -122.075283),  Route carried "under" structure: State highway 84,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 63,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: STATE ROUTE 84,  Facility Carried by Structure: DUMBARTON TL POC
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 3.210,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 33 0591,  Location: 04-ALA-880-6.24-FMT (Lat: 37.522050,  Lng: -121.987686),  Route carried "under" structure: Interstate 880,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 187,000 (year 2017),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: STEVENSON BLVD
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 6.240,  Lanes on structure: 8,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 33 0618,  Location: 04-ALA-880-11.50-FMT (Lat: 37.578647,  Lng: -122.048658),  Route carried "under" structure: Interstate 880,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 198,000 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: FREMONT BOULEVARD
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 11.500,  Lanes on structure: 8,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.7m (172.9ft)

Find on map >>   Show street view

Structure Number: 33 0665F,  Location: 04-ALA-880-2.48-FMT (Lat: 37.480950,  Lng: -121.935625),  Route carried "under" structure: Ramp Interstate 880,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 81,000 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 880, WARREN AVE, RAMPS
Minimum Vertical Clearance: 6.60m (21.65ft),  Kilometerpoint: 2.480,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 64.5m (211.6ft)

Find on map >>   Show street view

Structure Number: 33 0665F,  Location: 04-ALA-880-2.48-FMT (Lat: 37.480950,  Lng: -121.935625),  Route carried "under" structure: Interstate 880,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 153,000 (year 2000),  Truck Traffic: 10%,  Features Intersected: I 880, WARREN AVE, RAMPS
Minimum Vertical Clearance: 15.03m (49.31ft),  Kilometerpoint: 2.480,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 64.5m (211.6ft)

Find on map >>   Show street view

Structure Number: 33 0665F,  Location: 04-ALA-880-2.48-FMT (Lat: 37.480950,  Lng: -121.935625),  Route carried "under" structure: Interstate 880,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 153,000 (year 2000),  Truck Traffic: 10%,  Features Intersected: I 880, WARREN AVE, RAMPS
Minimum Vertical Clearance: 15.50m (50.85ft),  Kilometerpoint: 2.480,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 64.5m (211.6ft)

Find on map >>   Show street view

Structure Number: 33 0665F,  Location: 04-ALA-880-2.48-FMT (Lat: 37.480950,  Lng: -121.935625),  Route carried "under" structure: Ramp Interstate 880,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 153,000 (year 2000),  Truck Traffic: 10%,  Features Intersected: I 880, WARREN AVE, RAMPS
Minimum Vertical Clearance: 15.30m (50.20ft),  Kilometerpoint: 2.480,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 64.5m (211.6ft)

Find on map >>   Show street view

Structure Number: 33 0666F,  Location: 04-ALA-880-2.55-FMT (Lat: 37.484094,  Lng: -121.938067),  Route carried "under" structure: Interstate 880,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 2.550,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 33 0667,  Location: 04-ALA-880-2.51-FMT (Lat: 37.483422,  Lng: -121.937528),  Route carried "under" structure: Interstate 880,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 880,  Facility Carried by Structure: WARREN AVENUE
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 2.510,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 33 0668,  Location: 04-ALA-880-2.29-FMT (Lat: 37.484111,  Lng: -121.934958),  Route carried "under" structure: Ramp Interstate 880,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2017),  Truck Traffic: 11%,  Features Intersected: N880-E262 CONNECTOR RAMP,  Facility Carried by Structure: WARREN AVENUE
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 2.290,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 33 0669,  Location: 04-ALA-262-R0.28 (Lat: 37.486267,  Lng: -121.933806),  Route carried "under" structure: State highway 262,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: ST RTE 262 (MISSION BL),  Facility Carried by Structure: KATO ROAD
Minimum Vertical Clearance: 6.33m (20.77ft),  Kilometerpoint: 0.280,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.2m (148.3ft)

Find on map >>   Show street view

Structure Number: 33 0705,  Location: 04-ALA-262-R0.43-FMT (Lat: 37.487711,  Lng: -121.932294),  Route carried "under" structure: State highway 262,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: STATE RTE 262 MISSION BL,  Facility Carried by Structure: UP RR, BNSF RY
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.430,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 40.4m (132.5ft)

Find on map >>   Show street view

Structure Number: 33 0706,  Location: 04-ALA-262-R0.45-FMT (Lat: 37.487983,  Lng: -121.932025),  Route carried "under" structure: State highway 262,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: STATE RTE 262 MISSION BL,  Facility Carried by Structure: RR TRACKS (BARTD)
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.450,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 33 0727,  Location: 04-ALA-238-3.77-FMT (Lat: 37.577589,  Lng: -121.973667),  Route carried "under" structure: State highway 238,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 238,  Facility Carried by Structure: UP RR SPUR
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 3.770,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.5m (80.4ft)

Find on map >>   Show street view

Structure Number: 33 0728,  Location: 04-ALA-238-3.40-FMT (Lat: 37.573547,  Lng: -121.969114),  Route carried "under" structure: State highway 238,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: STATE ROUTE 238,  Facility Carried by Structure: UP RR & BNSF RY
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 3.400,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 33C0014,  Location: 0.15 MI SW OF ST RTE 238 (Lat: 37.574978,  Lng: -121.973461),  Route carried "under" structure: City street ,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2010),  Truck Traffic: 1%,  Features Intersected: NILES BLVD,  Facility Carried by Structure: UP RR,BNSF,AMTRAK
Minimum Vertical Clearance: 4.16m (13.65ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 33C004,  Location: 0.5 MI SW/O ALVARADO BLVD (Lat: 37.574797,  Lng: -122.060408),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2010),  Truck Traffic: 2%,  Features Intersected: LOWRY RD,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 33C0139,  Location: 0.1 MI E/O WARM SPRGS BL (Lat: 37.504353,  Lng: -121.940939),  Route carried "under" structure: City street ,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 12,300 (year 2010),  Truck Traffic: 5%,  Features Intersected: GRIMMER BLVD,  Facility Carried by Structure: UP RR & BNSF RY
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 33C014,  Location: 0.1 MI E/O WARM SPRGS BL (Lat: 37.504422,  Lng: -121.940431),  Route carried "under" structure: City street ,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 12,300 (year 2010),  Truck Traffic: 5%,  Features Intersected: GRIMMER BLVD,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 33C0168L,  Location: 0.1 MI NW/O PARKSIDE DR. (Lat: 37.559339,  Lng: -121.979389),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 54,228 (year 2002),  Truck Traffic: 10%,  Features Intersected: MOWRY AVE,  Facility Carried by Structure: BARTD
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 33C0168R,  Location: 0.1 MI NW/O PARKSIDE DR. (Lat: 37.559417,  Lng: -121.979347),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 54,228 (year 2002),  Truck Traffic: 5%,  Features Intersected: MOWRY AVE,  Facility Carried by Structure: BARTD
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 33C0225,  Location: 0.2 MI N/O PERALTA BLVD (Lat: 37.562911,  Lng: -121.996333),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 28,500 (year 2010),  Truck Traffic: 1%,  Features Intersected: PASEO PADRE PARKWAY,  Facility Carried by Structure: UP RR & BNSF RY
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 33C0418,  Location: 0.5 MI W OF DRISCOLL RD (Lat: 37.541397,  Lng: -121.955108),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2013),  Truck Traffic: 2%,  Features Intersected: PASEO PADRE PARKWAY,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.6m (54.5ft)

Find on map >>   Show street view

Structure Number: 33C0468,  Location: 0.5 MI W OF DRISCOLL RD (Lat: 37.541192,  Lng: -121.955797),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2013),  Truck Traffic: 3%,  Features Intersected: PASEO PADRE PARKWAY,  Facility Carried by Structure: PEDESTRIAN ACCESS
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 33C047,  Location: 0.5 MI W OF HWY680 (Lat: 37.541472,  Lng: -121.954833),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2013),  Truck Traffic: 2%,  Features Intersected: PASEO PADRE PARKWAY,  Facility Carried by Structure: BARTD (FUTURE)
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 33C0478,  Location: 0.3 MI W OF WARMSPRING BV (Lat: 37.462158,  Lng: -121.919011),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 13,156 (year 2011),  Truck Traffic: 5%,  Features Intersected: KATO ROAD,  Facility Carried by Structure: BARTD TRACKS
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 13.8m (45.3ft)

Find on map >>   Show street view

Structure Number: 33C0479,  Location: 0.3 MI W OF WARMSPRING BV (Lat: 37.462133,  Lng: -121.919100),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 13,156 (year 2011),  Truck Traffic: 5%,  Features Intersected: KATO ROAD,  Facility Carried by Structure: UPRR ACCESS ROAD
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.8m (45.3ft)

Find on map >>   Show street view

Structure Number: 33C048,  Location: 0.2 MI W OF WARMSPRING BV (Lat: 37.485878,  Lng: -121.930856),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 16,288 (year 2013),  Truck Traffic: 5%,  Features Intersected: WARREN AVE,  Facility Carried by Structure: BARTD TRACKS
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 33C0481,  Location: 0.2 MI W OF WARMSPRING BV (Lat: 37.485847,  Lng: -121.930994),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 16,288 (year 2013),  Truck Traffic: 5%,  Features Intersected: WARREN AVE,  Facility Carried by Structure: UPRR ACCESS ROAD
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 33C0486,  Location: 0.3 MI W OF WARMSPRING BV (Lat: 37.462114,  Lng: -121.919178),  Route carried "under" structure: City street ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 13,156 (year 2011),  Truck Traffic: 5%,  Features Intersected: KATO ROAD,  Facility Carried by Structure: UPRR TRACKS
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.8m (45.3ft)

Find on map >>   Show street view

Structure Number: 33C0487,  Location: 0.2 MI W OF WARMSPRING BV (Lat: 37.485781,  Lng: -121.931261),  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 16,288 (year 2013),  Truck Traffic: 5%,  Features Intersected: WARREN AVE,  Facility Carried by Structure: UPRR TRACKS
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.8m (45.3ft)

Discuss Fremont, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.