Bridge Statistics for Cumberland, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 37Number of bridges
  • 551ft / 168mTotal length
  • $108,293,000Total costs
  • 476,418Total average daily traffic
  • 33,899Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cumberland
  • No street view available for this location

New bridges in Cumberland, RI - historical statistics
  • New bridges - historical statistics
  • 5Before 1900
  • 11900-1909
  • 21920-1929
  • 11940-1949
  • 11950-1959
  • 121960-1969
  • 11970-1979
  • 31980-1989
  • 41990-1999
  • 12000-2009
  • 42010-2019
  • 22020-2022
Reconstructed bridges in Cumberland, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 42000-2009
Average Bridge Daily Traffic in Cumberland, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 10.0%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.1%Very good
  • 16.1%Good
  • 38.7%Satisfactory
  • 19.4%Fair
  • 6.5%Poor
  • 3.2%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.9%Excellent
  • 3.2%Very good
  • 22.6%Good
  • 45.2%Satisfactory
  • 9.7%Fair
  • 6.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 33.3%Good
  • 42.9%Satisfactory
  • 9.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: 46,  Location: 1.3 Mi SW of Jct I-95 (Lat: 41.507792,  Lng: -71.715975),  Route carried "on" structure: Alternate State highway 3,  Year Built: 1922,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 9,567 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,481 (year 2036),  Design Load: HS 20,  Features Intersected: BRUSHY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.021,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $890,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 117,  Location: 0.5 Mi N of JCT RI 123 (Lat: 41.911200,  Lng: -71.402956),  Route carried "on" structure: State highway 122,  Year Built: 1979,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 13,800 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,180 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.103,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $871,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,307,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 164,  Location: 1.0 Mi W of JCT RI 122 (Lat: 41.953183,  Lng: -71.452211),  Route carried "on" structure: City street ,  Year Built: 1885,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 3,811 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,192 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER,  Facility Carried by Structure: SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.324,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.3m (99.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $3,000,000,  Roadway Improvement Cost: $700,000,  Total Project Cost: $4,500,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 181,  Location: 0.8 Mi E of JCT RI 114 (Lat: 41.989428,  Lng: -71.396747),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 2.69m (8.83ft),  Average Daily Traffic: 875 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 963 (year 2041),  Design Load: HS 20,  Features Intersected: DIAMOND HILL RESERVOIR,  Facility Carried by Structure: RESERVOIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.436,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.9m (88.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $514,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $771,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 204,  Location: 0.1 Mi N JCT RI 114 (Lat: 41.983578,  Lng: -71.409806),  Route carried "on" structure: Alternate State highway 114,  Year Built: 1926,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 11,938 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,132 (year 2041),  Design Load: HS 20,  Features Intersected: EAST BRANCH SNEECH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.694,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,412,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,118,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 275,  Location: 2.5 Mi E of JCT RI 146 (Lat: 41.938214,  Lng: -71.433903),  Route carried "on" structure: State highway 116,  Year Built: 1945,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 26.45m (86.78ft),  Average Daily Traffic: 10,755 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 11,831 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER, P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.231,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 8,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.61m (87.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $9,492,000,  Roadway Improvement Cost: $949,000,  Total Project Cost: $14,237,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 301,  Location: 0.2 Mi N of JCT RI 120 (Lat: 41.979611,  Lng: -71.393189),  Route carried "on" structure: City street ,  Year Built: 1886,  Year Reconstructed: 1985,  Status: Closed,  Structure Length: 1.89m (6.20ft),  Design Load: HS 20,  Features Intersected: ABBOTT RUN,  Facility Carried by Structure: SNEECH POND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.132,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Satisfactory,  Channel: Good,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,257,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,886,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 302,  Location: 0.3 Mi E of JCT RI 114 (Lat: 41.900750,  Lng: -71.385619),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 8,686 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,424 (year 2036),  Design Load: HS 20,  Features Intersected: SLEEPY HOLLOW RESERVOIR,  Facility Carried by Structure: MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.436,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $386,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 388,  Location: 0.1 Mi E JCT NEW RIVER RD (Lat: 41.971494,  Lng: -71.469639),  Route carried "on" structure: City street ,  Year Built: 1901,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 7,800 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,580 (year 2041),  Design Load: HS 20,  Features Intersected: MANVILLE MILL TRENCH,  Facility Carried by Structure: MANVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.137,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Fair,  Culverts: Poor,  Inventory Rating: 77.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $215,000
Find on map >>   Show street view

Structure Number: 395,  Location: 0.14 Mi E of JCT RI 122 (Lat: 41.906425,  Lng: -71.399936),  Route carried "on" structure: State highway 123,  Year Built: 1963,  Status: Open,  Structure Length: 13.33m (43.73ft),  Average Daily Traffic: 10,201 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,242 (year 2036),  Design Load: HS 20,  Features Intersected: BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.190,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.23m (43.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,901,000,  Roadway Improvement Cost: $490,000,  Total Project Cost: $7,351,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3965,  Location: 0.1 Mi N of New River Rd (Lat: 41.970953,  Lng: -71.470167),  Route carried "on" structure: City street ,  Year Built: 2021,  Status: Open,  Structure Length: 7.08m (23.23ft),  Average Daily Traffic: 7,800 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,580 (year 2039),  Design Load: HL 93,  Features Intersected: BLACKSTONE RVR, P&W, BP,  Facility Carried by Structure: MANVILLE HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.012,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $2,069,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $3,103,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 407,  Location: 0.5 Mi E of JCT RI 114 (Lat: 41.913981,  Lng: -71.383983),  Route carried "on" structure: Alternate State highway 123,  Year Built: 1957,  Status: Open,  Structure Length: 2.60m (8.53ft),  Average Daily Traffic: 13,900 (year 2021),  Average Future Daily Traffic: 15,290 (year 2041),  Design Load: HS 20,  Features Intersected: ABBOTT RUN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.332,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.9m (29.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $943,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,414,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 408,  Location: 0.2 Mi SW of JCT RI 114 (Lat: 41.910442,  Lng: -71.395081),  Route carried "on" structure: State highway 114,  Year Built: 1988,  Status: Posted for load,  Structure Length: 3.19m (10.47ft),  Average Daily Traffic: 11,100 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,210 (year 2041),  Design Load: HS 20,  Features Intersected: P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.876,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,057,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,586,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 457,  Location: 0.3 Mi W of Mass Line (Lat: 41.962514,  Lng: -71.388258),  Route carried "on" structure: City street ,  Year Built: 1886,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,943 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,137 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: ABBOTT RUN CANAL,  Facility Carried by Structure: RAWSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.275,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $674,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,011,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4595,  Location: 0.9 Mi S of JCT RI 114 (Lat: 41.955522,  Lng: -71.387483),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Posted for load,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 4,300 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,160 (year 2036),  Design Load: H 20,  Features Intersected: ABBOTT RUN,  Facility Carried by Structure: HOWARD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.517,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,584,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,376,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 46,  Location: 0.1 MI N OF JCT I-295 (Lat: 41.962553,  Lng: -71.387319),  Route carried "on" structure: City street ,  Year Built: 1886,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.88m (6.17ft),  Average Daily Traffic: 1,943 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,137 (year 2041),  Design Load: HS 20,  Features Intersected: ABBOTT RUN,  Facility Carried by Structure: RAWSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.1m (59.4ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,449,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $2,174,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 691,  Location: 1.0 Mi E of JCT RI 114 (Lat: 41.979197,  Lng: -71.393619),  Route carried "on" structure: State highway 120,  Year Built: 1962,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 6,921 (year 2021),  Average Future Daily Traffic: 7,613 (year 2041),  Design Load: HS 20,  Features Intersected: ABBOTT RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.597,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $840,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 692,  Location: 0.1 Mi W of JCT RI 114 (Lat: 41.982828,  Lng: -71.411100),  Route carried "on" structure: State highway 120,  Year Built: 1961,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,380 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,118 (year 2041),  Design Load: HS 20,  Features Intersected: ASH SWAMP BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.089,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $381,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 75,  Location: 1.8 Mi N of JCT RI 146 (Lat: 41.943733,  Lng: -71.438939),  Route carried "on" structure: Interstate 295,  Year Built: 1964,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 21.11m (69.26ft),  Average Daily Traffic: 14,400 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,840 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BLACKSTONE RIVER, P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.093,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.9m (45.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 65.8m (215.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 21.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.97m (68.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $9,093,000,  Roadway Improvement Cost: $909,000,  Total Project Cost: $13,640,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7502,  Location: 1.8 Mi N of JCT RI 146 (Lat: 41.943897,  Lng: -71.439369),  Route carried "on" structure: Interstate 295,  Year Built: 1964,  Status: Open,  Structure Length: 21.11m (69.26ft),  Average Daily Traffic: 14,400 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,840 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BLACKSTONE RIVER, P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.057,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.9m (45.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 65.8m (215.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 21.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.97m (68.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $9,093,000,  Roadway Improvement Cost: $909,000,  Total Project Cost: $13,640,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 751,  Location: 2.0 Mi S of Cumb High (Lat: 41.944922,  Lng: -71.436831),  Route carried "on" structure: State highway 122,  Year Built: 1965,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 22,300 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,530 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 NB & SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.940,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $4,150,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $6,225,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: 7525,  Location: 1.0 Mi W of JCT RI 114 (Lat: 41.949317,  Lng: -71.427267),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 28,300 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 31,130 (year 2041),  Design Load: Greater than HL93,  Features Intersected: SCOTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.245,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,359,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7527,  Location: 1.2 Mi W of JCT RI 114 (Lat: 41.949625,  Lng: -71.427283),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 25,300 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 27,830 (year 2041),  Design Load: Greater than HL93,  Features Intersected: SCOTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.872,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,305,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,957,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7535,  Location: 0.5 Mi W of JCT RI 114 (Lat: 41.950847,  Lng: -71.412950),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 30,200 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 33,220 (year 2041),  Design Load: Greater than HL93,  Features Intersected: LEIGH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.468,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,282,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,923,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7537,  Location: 0.5 Mi W of JCT RI 114 (Lat: 41.951117,  Lng: -71.413031),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 32,560 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 35,816 (year 2041),  Design Load: Greater than HL93,  Features Intersected: LEIGH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.657,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $209,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $314,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 754,  Location: 0.4 Mi N of JCT RI 116 (Lat: 41.950519,  Lng: -71.402636),  Route carried "on" structure: State highway 114,  Year Built: 1963,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 17,455 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 19,201 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 NB & SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.833,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $5,355,000,  Roadway Improvement Cost: $536,000,  Total Project Cost: $8,033,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 755,  Location: 0.7 Mi E of JCT RI 114 (Lat: 41.952589,  Lng: -71.387653),  Route carried "on" structure: Interstate 295,  Year Built: 1965,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 26,200 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 28,820 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: ABBOTT RUN VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.594,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.3m (63.3ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,355,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,032,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7552,  Location: 0.7 Mi E OF Jct RI 114 (Lat: 41.952831,  Lng: -71.387925),  Route carried "on" structure: Interstate 295,  Year Built: 1965,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 25,800 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,380 (year 2041),  Design Load: HS 20,  Features Intersected: ABBOTT RUN VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.544,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,388,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,082,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 756,  Location: 1.0 Mi N of Jct RI 114 (Lat: 41.953086,  Lng: -71.383603),  Route carried "on" structure: Interstate 295,  Year Built: 1965,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 46,200 (year 2021),  Average Future Daily Traffic: 50,820 (year 2041),  Design Load: HS 20,  Features Intersected: ABBOTT RUN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.932,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 32.3m (106.0ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,881,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $5,822,000
Find on map >>   Show street view

Structure Number: 943,  Location: 0.1 Mi E of JCT RI 114 (Lat: 41.907547,  Lng: -71.392078),  Route carried "on" structure: City street ,  Year Built: 1882,  Year Reconstructed: 1995,  Status: Posted for load,  Structure Length: 3.31m (10.86ft),  Average Daily Traffic: 1,111 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,334 (year 2036),  Design Load: HS 20,  Features Intersected: P&W RR,  Facility Carried by Structure: CHURCH ST
Minimum Vertical Clearance: 3.89m (12.76ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 8.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 6.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $3,187,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $4,270,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 984,  Location: 0.1 Mi S of RI 122 (Lat: 41.984339,  Lng: -71.481944),  Route carried "on" structure: State highway 99,  Year Built: 1994,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 9,280 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,136 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SECOND AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.321,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $213,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9842,  Location: 0.1 Mi S of RI 122 (Lat: 41.984675,  Lng: -71.482181),  Route carried "on" structure: State highway 99,  Year Built: 1994,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 9,280 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,136 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SECOND AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.249,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 91.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 70.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $237,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1292,  Location: 200 ft W of JCT Scott Rd (Lat: 41.941900,  Lng: -71.427600),  Route carried "on" structure: City street _,  Year Built: 2005,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 157 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 173 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Scott Brook,  Facility Carried by Structure: Mae's Meadow
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 751,  Location: 2.0 Mi S of Cumb High (Lat: 41.944922,  Lng: -71.436831),  Route carried "under" structure: Interstate 295,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 22,300 (year 2021),  Truck Traffic: 5%,  Features Intersected: I-295 NB & SB,  Facility Carried by Structure: RI 122 MENDON RD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 754,  Location: 0.4 Mi N of JCT RI 116 (Lat: 41.950519,  Lng: -71.402636),  Route carried "under" structure: Interstate 295,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 17,455 (year 2021),  Truck Traffic: 13%,  Features Intersected: I-295 NB & SB,  Facility Carried by Structure: RI 114 DMND HLL RD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 984,  Location: 0.1 Mi S of RI 122 (Lat: 41.984339,  Lng: -71.481944),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 3%,  Features Intersected: SECOND AV,  Facility Carried by Structure: RI 99 NB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 9842,  Location: 0.1 Mi S of RI 122 (Lat: 41.984675,  Lng: -71.482181),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 3%,  Features Intersected: SECOND AV,  Facility Carried by Structure: RI 99 SB
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)