Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Baileyton, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 55Number of bridges
  • 479ft / 146mTotal length
  • $6,255,000Total costs
  • 520,764Total average daily traffic
  • 216,159Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Baileyton
  • No street view available for this location

New bridges in Baileyton, TN - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 11930-1939
  • 71950-1959
  • 61960-1969
  • 201970-1979
  • 101980-1989
  • 41990-1999
  • 42000-2009
Reconstructed bridges in Baileyton, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Baileyton, TN
Average Bridge Truck Traffic in Baileyton, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.1%Good
  • 41.2%Satisfactory
  • 8.8%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.1%Good
  • 41.2%Satisfactory
  • 14.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 64.7%Good
  • 20.6%Satisfactory
  • 11.8%Fair
  • 2.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.9%Very good
  • 48.6%Good
  • 28.6%Satisfactory
  • 17.1%Fair
  • 2.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 54.5%Good
  • 45.5%Satisfactory
Find on map >>   Show street view

Structure Number: 37S24630001,  Location: NEAR NEW HOPE (Lat: 36.389733,  Lng: -82.848483),  Route carried "on" structure: State highway 347,  Year Built: 1958,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 555 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 888 (year 2041),  Design Load: HS 15,  Features Intersected: NORTH FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.319,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $239,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 37S24630003,  Location: BTWN NEW HOPE & VAN HILL (Lat: 36.394767,  Lng: -82.827750),  Route carried "on" structure: State highway 347,  Year Built: 1958,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 555 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 944 (year 2040),  Design Load: HS 15,  Features Intersected: BEECH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.556,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $257,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 37S24630005,  Location: NEAR VAN HILL (Lat: 36.394333,  Lng: -82.819117),  Route carried "on" structure: State highway 347,  Year Built: 1958,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 555 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 944 (year 2040),  Design Load: HS 15,  Features Intersected: BEECH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.715,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $230,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 37S24630007,  Location: 1.0 M SE OF WASHINGTON CO (Lat: 36.394167,  Lng: -82.794117),  Route carried "on" structure: State highway 347,  Year Built: 1958,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 325 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 520 (year 2041),  Design Load: HS 15,  Features Intersected: BEECH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.595,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $752,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30I00810035,  Location: NEAR GREENVILLE TENN. (Lat: 36.308067,  Lng: -82.874000),  Route carried "under" structure: Interstate 81,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 37,438 (year 2020),  Truck Traffic: 44%,  Features Intersected: OTTWAY RD (2592),  Facility Carried by Structure: NFA 2592
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 24.205,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 30I00810039,  Location: 3 M SW OF SR 172 EXIT (Lat: 36.299900,  Lng: -82.877200),  Route carried "under" structure: County highway 178,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 230 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 RT LN,  Facility Carried by Structure: I81
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.391,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 30I0081004,  Location: 3 M SW OF SR 172 EXIT (Lat: 36.300417,  Lng: -82.877717),  Route carried "under" structure: County highway 178,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 230 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 LF LN,  Facility Carried by Structure: I81
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.320,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 30I00810041,  Location: NEAR GREENVILLE TENN. (Lat: 36.308483,  Lng: -82.858967),  Route carried "under" structure: Interstate 81,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 37,438 (year 2020),  Truck Traffic: 44%,  Features Intersected: BERNARD RD (A181)
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 27.649,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 30I00810045,  Location: NEAR BAILEYTOWN (Lat: 36.323033,  Lng: -82.832833),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 37,438 (year 2020),  Truck Traffic: 44%,  Features Intersected: SR 172 / I81 RL,  Facility Carried by Structure: FAS 172
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 30.465,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 30I00810046,  Location: NEAR BAILEYTOWN (Lat: 36.323600,  Lng: -82.833133),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 37,438 (year 2020),  Truck Traffic: 44%,  Features Intersected: SR 172 / I81 LL,  Facility Carried by Structure: FAS 172
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 30.465,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 30I00810049,  Location: NEAR BAILEYTOWN (Lat: 36.326967,  Lng: -82.828250),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 39,838 (year 2020),  Truck Traffic: 42%,  Features Intersected: JUD DOTY RD (1236),  Facility Carried by Structure: NFA 1236
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 31.141,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 30I00810051,  Location: 1.5 M E OF SR 172 EXIT (Lat: 36.335233,  Lng: -82.811017),  Route carried "under" structure: County highway 321,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 RT LN,  Facility Carried by Structure: I81
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 2.929,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 30I00810052,  Location: 1.5 M E OF SR 172 EXIT (Lat: 36.335717,  Lng: -82.811200),  Route carried "under" structure: County highway 321,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 LF LN,  Facility Carried by Structure: I81
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 2.984,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 30I00810053,  Location: NEAR GREENVILLE TENN. (Lat: 36.343767,  Lng: -82.787933),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 39,838 (year 2020),  Truck Traffic: 42%,  Features Intersected: LOST MTN. PK (2583),  Facility Carried by Structure: NFA 2583
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 35.180,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.9m (107.9ft)

Discuss Baileyton, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.