Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jenks, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 63Number of bridges
  • 1,624ft / 495mTotal length
  • $104,254,000Total costs
  • 1,225,809Total average daily traffic
  • 94,460Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jenks
  • No street view available for this location

New bridges in Jenks, OK - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 41950-1959
  • 71960-1969
  • 21970-1979
  • 71980-1989
  • 231990-1999
  • 132000-2009
  • 52010-2019
Reconstructed bridges in Jenks, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Jenks, OK
Average Bridge Truck Traffic in Jenks, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.7%Very good
  • 75.7%Good
  • 18.9%Satisfactory
  • 2.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.9%Very good
  • 32.4%Good
  • 10.8%Satisfactory
  • 10.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.4%Very good
  • 70.3%Good
  • 5.4%Satisfactory
  • 16.2%Fair
  • 2.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.5%Excellent
  • 29.0%Very good
  • 38.7%Good
  • 6.5%Satisfactory
  • 19.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 55.6%Good
  • 11.1%Satisfactory
Find on map >>   Show street view

Structure Number: 7426,  Location: 300' W OF ELM ON 96 ST (Lat: 36.022736,  Lng: -95.976683),  Route carried "on" structure: City street E0685,  Year Built: 1940,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 14,697 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,515 (year 2040),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: 96TH(MAIN ST.)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.309,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 12685,  Location: 121ST S .7E UNION AVE (Lat: 35.988311,  Lng: -96.002194),  Route carried "on" structure: County highway E0710,  Year Built: 1952,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,158 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,853 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $241,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13618,  Location: 4.7 MI N JCT SH-67 (Lat: 36.013619,  Lng: -96.011314),  Route carried "on" structure: US 75,  Year Built: 1956,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 46,200 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 73,920 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.643,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $645,000,  Total Project Cost: $1,095,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13657,  Location: 5.2 MI N JCT SH-67 (Lat: 36.021106,  Lng: -96.011739),  Route carried "on" structure: US 75,  Year Built: 1956,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 24,950 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 39,920 (year 2040),  Design Load: H 20,  Features Intersected: NICKLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.480,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $994,000,  Roadway Improvement Cost: $1,640,000,  Total Project Cost: $2,783,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13684,  Location: 4.8 MI N JCT SH 67 (Lat: 36.015519,  Lng: -96.011756),  Route carried "on" structure: US 75,  Year Built: 1956,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 14.11m (46.29ft),  Average Daily Traffic: 23,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 36,960 (year 2040),  Design Load: H 20,  Features Intersected: POLECAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.662,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.14m (46.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,814,000,  Roadway Improvement Cost: $2,993,000,  Total Project Cost: $5,079,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 16184,  Location: 4.8 MI N JCT SH 67 (Lat: 36.015667,  Lng: -96.011447),  Route carried "on" structure: US 75,  Year Built: 1964,  Status: Open,  Structure Length: 14.11m (46.29ft),  Average Daily Traffic: 23,350 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 37,360 (year 2040),  Design Load: HS 20,  Features Intersected: POLECAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.662,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.14m (46.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,814,000,  Roadway Improvement Cost: $2,993,000,  Total Project Cost: $5,079,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 16531,  Location: 5.2 MI N JCT SH-67 (Lat: 36.021108,  Lng: -96.011814),  Route carried "on" structure: Ramp US 75,  Year Built: 1965,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,000 (year 2040),  Design Load: HS 20,  Features Intersected: NICKLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.480,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.06m (16.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $649,000,  Roadway Improvement Cost: $1,071,000,  Total Project Cost: $1,817,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16532,  Location: 5.2 MI N JCT SH-67 (Lat: 36.021106,  Lng: -96.011417),  Route carried "on" structure: US 75,  Year Built: 1965,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 23,350 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 37,360 (year 2040),  Design Load: HS 20,  Features Intersected: NICKLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.480,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $994,000,  Roadway Improvement Cost: $1,640,000,  Total Project Cost: $2,783,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16545,  Location: 0.8 MI S OF 96 ST SOUTH (Lat: 36.012569,  Lng: -95.975939),  Route carried "on" structure: City street 8301,  Year Built: 1965,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 6,747 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,795 (year 2040),  Design Load: HS 20,  Features Intersected: POLECAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.35m (37.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $907,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16561,  Location: 5.5 MI N JCT SH 67 (Lat: 36.024722,  Lng: -96.011111),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 75 UNDER,  Facility Carried by Structure: JENKS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.866,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,755,000,  Roadway Improvement Cost: $2,896,000,  Total Project Cost: $4,914,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17877,  Location: 0.1 MI W OF ELWOOD ON 111 (Lat: 36.002831,  Lng: -95.995419),  Route carried "on" structure: City street 8140,  Year Built: 1970,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 1,639 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,622 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $539,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19019,  Location: 0.8 MI S OF 101 ST (Lat: 36.006797,  Lng: -95.993889),  Route carried "on" structure: City street N3940,  Year Built: 1975,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,588 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,541 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $514,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19986,  Location: 3.0 MI N SH 67 (Lat: 35.988086,  Lng: -96.011875),  Route carried "on" structure: US 75,  Year Built: 1981,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 21,050 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 33,680 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 117 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.768,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $1,376,000,  Total Project Cost: $2,335,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 19987,  Location: 3.0 MI N SH 67 (Lat: 35.988083,  Lng: -96.011500),  Route carried "on" structure: US 75,  Year Built: 1981,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 21,350 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 34,160 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 117 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.768,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $1,377,000,  Total Project Cost: $2,336,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 20465,  Location: 111ST .1E 33RD W AVE (Lat: 36.002850,  Lng: -96.027550),  Route carried "on" structure: County highway N3920,  Year Built: 1983,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: E0700(W.111TH.ST.)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $357,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20741,  Location: 141ST S. .8E LEWIS AVE (Lat: 35.959286,  Lng: -95.943653),  Route carried "on" structure: County highway E0730,  Year Built: 1984,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 375 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 20,  Features Intersected: POSEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.1m (46.3ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $354,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22412,  Location: 0.8 MI S OF 131 ST (Lat: 35.963314,  Lng: -95.930244),  Route carried "on" structure: City street N3976,  Year Built: 1989,  Status: Open,  Structure Length: 17.56m (57.61ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,760 (year 2040),  Design Load: HS 20,  Features Intersected: POSEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.56m (57.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $897,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $1,400,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22774,  Location: 07.75 (Lat: 36.016550,  Lng: -95.963039),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 43,800 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 70,080 (year 2040),  Design Load: HS 20,  Features Intersected: LEWIS AVE ACCESS UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.810,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 36.0m (118.1ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $671,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 22916,  Location: 07.02S (Lat: 36.016372,  Lng: -95.976281),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 21,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,040 (year 2040),  Design Load: HS 20,  Features Intersected: ELM ST. UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.557,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $849,000,  Total Project Cost: $1,622,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22927,  Location: 07.48S (Lat: 36.016561,  Lng: -95.968181),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 21,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,040 (year 2040),  Design Load: HS 20,  Features Intersected: M.P. R.R. & STREET UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.279,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,141,000,  Roadway Improvement Cost: $2,500,000,  Total Project Cost: $6,417,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22949,  Location: 05.88S (Lat: 36.009172,  Lng: -95.994139),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 22.28m (73.10ft),  Average Daily Traffic: 16,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,960 (year 2040),  Design Load: HS 20,  Features Intersected: ELMWOOD ST & COAL CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.28m (73.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,715,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $3,380,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22957,  Location: 08.13S (Lat: 36.017064,  Lng: -95.956150),  Route carried "on" structure: Other road ,  Year Built: 1991,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 71.38m (234.19ft),  Average Daily Traffic: 21,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,040 (year 2040),  Design Load: HS 20,  Features Intersected: ARK RIVER & DELAWARE AVE,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.167,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 71.38m (234.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,494,000,  Roadway Improvement Cost: $1,875,000,  Total Project Cost: $8,377,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23053,  Location: 04.81 (Lat: 36.011317,  Lng: -96.012058),  Route carried "on" structure: Ramp Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 9,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,400 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 75 SB UNDER,  Facility Carried by Structure: CREEK TP RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,595,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $3,245,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2312,  Location: 06.67S (Lat: 36.014594,  Lng: -95.982508),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 16,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,960 (year 2040),  Design Load: HS 20,  Features Intersected: POLECAT CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.30m (50.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,178,000,  Roadway Improvement Cost: $1,767,000,  Total Project Cost: $3,358,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23125,  Location: 05.47 (Lat: 36.009208,  Lng: -96.000486),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 53,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 85,440 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.264,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 26 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 71.0m (232.9ft),  Out-to-Out Width: 71.6m (234.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.22m (10.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23928,  Location: 05.88N (Lat: 36.009486,  Lng: -95.994125),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 22.28m (73.10ft),  Average Daily Traffic: 16,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,960 (year 2040),  Design Load: HS 20,  Features Intersected: ELMWOOD ST & COAL CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.28m (73.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,715,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $3,380,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23929,  Location: 06.67N (Lat: 36.014817,  Lng: -95.982833),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 16,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,960 (year 2040),  Design Load: HS 20,  Features Intersected: POLECAT CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 24 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.30m (50.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,178,000,  Roadway Improvement Cost: $1,767,000,  Total Project Cost: $3,358,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2393,  Location: 07.02N (Lat: 36.016689,  Lng: -95.976281),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 21,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,040 (year 2040),  Design Load: HS 20,  Features Intersected: ELM ST. UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.557,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $849,000,  Total Project Cost: $1,622,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23931,  Location: 07.32 (Lat: 36.016283,  Lng: -95.970519),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 43,800 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 70,080 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.734,  Lanes on structure: 10,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 99.1m (325.1ft),  Out-to-Out Width: 99.7m (327.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23932,  Location: 07.48N (Lat: 36.016883,  Lng: -95.968331),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 21,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,040 (year 2040),  Design Load: HS 20,  Features Intersected: M.P. R.R. UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.279,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $683,000,  Roadway Improvement Cost: $1,025,000,  Total Project Cost: $1,955,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23933,  Location: 08.13N (Lat: 36.017378,  Lng: -95.956219),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 71.38m (234.19ft),  Average Daily Traffic: 21,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,040 (year 2040),  Design Load: HS 20,  Features Intersected: ARK RIVER & DELAWARE AVE,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.695,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 71.38m (234.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,494,000,  Roadway Improvement Cost: $1,875,000,  Total Project Cost: $8,377,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24436,  Location: 0.2 MI S OF 96 ST (Lat: 36.021311,  Lng: -95.975917),  Route carried "on" structure: City street 8301,  Year Built: 1965,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 6,747 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,795 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24437,  Location: 100' E. OF ELM ON BEAVER (Lat: 36.020564,  Lng: -95.975317),  Route carried "on" structure: City street E0690,  Year Built: 1940,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.309,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24438,  Location: 96TH ST. OVER ARK. RIVER (Lat: 36.023919,  Lng: -95.958222),  Route carried "on" structure: City street 6850,  Year Built: 1996,  Status: Open,  Structure Length: 59.15m (194.06ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,600 (year 2040),  Design Load: HS 20,  Features Intersected: ARKANSAS RIVER,  Facility Carried by Structure: E0685 (96TH ST.)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.987,  Lanes on structure: 5,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 59.16m (194.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $6,043,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $6,700,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26036,  Location: 04.02 (Lat: 36.008636,  Lng: -96.027031),  Route carried "on" structure: City street 44,  Year Built: 2000,  Status: Open,  Structure Length: 7.36m (24.15ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: 33RD AVE. W.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 13.8m (45.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.36m (24.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,133,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,721,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26038,  Location: 04.77N (Lat: 36.010083,  Lng: -96.013994),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.67m (21.88ft),  Average Daily Traffic: 11,200 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 17,920 (year 2040),  Design Load: HS 20,  Features Intersected: TP RAMP WB UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.67m (21.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $513,000,  Roadway Improvement Cost: $770,000,  Total Project Cost: $1,472,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26039,  Location: 04.77S (Lat: 36.009739,  Lng: -96.014111),  Route carried "on" structure: Other road E0670,  Year Built: 2000,  Status: Open,  Structure Length: 6.70m (21.98ft),  Average Daily Traffic: 10,850 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 17,360 (year 2040),  Design Load: HS 20,  Features Intersected: TP RAMP WB UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $515,000,  Roadway Improvement Cost: $773,000,  Total Project Cost: $1,478,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Jenks, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.