Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tifton, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 73Number of bridges
  • 646ft / 197mTotal length
  • $105,225,000Total costs
  • 701,750Total average daily traffic
  • 8,695Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tifton
  • No street view available for this location

New bridges in Tifton, GA - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 61930-1939
  • 11940-1949
  • 111950-1959
  • 31960-1969
  • 91970-1979
  • 201980-1989
  • 41990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Tifton, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 31970-1979
  • 21980-1989
  • 21990-1999
  • 42000-2009
Average Bridge Daily Traffic in Tifton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.6%Very good
  • 84.4%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.6%Very good
  • 81.3%Good
  • 3.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 81.3%Good
  • 12.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.5%Very good
  • 52.9%Good
  • 13.7%Satisfactory
  • 5.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 87.5%Good
  • 9.4%Satisfactory
  • 3.1%Fair
Find on map >>   Show street view

Structure Number: 2770001,  Location: APP 3 MI S OF TIFTON (Lat: 31.421947,  Lng: -83.499883),  Route carried "on" structure: US 41,  Year Built: 1953,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 4,100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,150 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $645,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $967,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770004,  Location: APP 8 MI S OF TIFTON (Lat: 31.391289,  Lng: -83.541389),  Route carried "on" structure: US 319,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 7,590 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,385 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,691,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $2,536,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770007,  Location: 3 MI NE OF TIFTON (Lat: 31.448569,  Lng: -83.482608),  Route carried "on" structure: US 319,  Year Built: 1938,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,790 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,685 (year 2031),  Design Load: H 15,  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2770008,  Location: 3.5 MI NE OF TIFTON (Lat: 31.450139,  Lng: -83.480689),  Route carried "on" structure: US 319,  Year Built: 1938,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,790 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,685 (year 2031),  Design Load: H 15,  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 2770009,  Location: APP 5 MI N OF TIFTON (Lat: 31.477828,  Lng: -83.452069),  Route carried "on" structure: US 319,  Year Built: 1938,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,230 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,845 (year 2031),  Design Load: H 15,  Features Intersected: MIDDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2770014,  Location: APP 4 MI W OF TIFTON (Lat: 31.438669,  Lng: -83.561369),  Route carried "on" structure: US 82,  Year Built: 1936,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 13,620 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,430 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,875,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,813,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2770015,  Location: APP 4 MI W OF TIFTON (Lat: 31.439228,  Lng: -83.560178),  Route carried "on" structure: US 82,  Year Built: 1936,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 13,620 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,430 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,364,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $2,046,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2770016,  Location: APP 3.8 MI W OF TIFTON (Lat: 31.439658,  Lng: -83.559269),  Route carried "on" structure: US 82,  Year Built: 1936,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 13,620 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,430 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,023,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,534,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2770017,  Location: APP 1.75 MI W OF TIFTON (Lat: 31.449458,  Lng: -83.533678),  Route carried "on" structure: US 82,  Year Built: 1956,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 28,400 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,600 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 2770018,  Location: APP 4 MI E OF TIFTON (Lat: 31.442719,  Lng: -83.475878),  Route carried "on" structure: US 82,  Year Built: 1971,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 12,060 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,090 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770019,  Location: APP 5 MI E OF TIFTON (Lat: 31.430539,  Lng: -83.431369),  Route carried "on" structure: US 82,  Year Built: 1971,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 6,810 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770021,  Location: APP 6 MI N OF TIFTON (Lat: 31.531239,  Lng: -83.524239),  Route carried "on" structure: County highway 107,  Year Built: 1957,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 20,  Features Intersected: I-75,  Facility Carried by Structure: WESLEY RIGDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $883,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,325,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2770022,  Location: APP 4 MI N OF TIFTON (Lat: 31.524989,  Lng: -83.499458),  Route carried "on" structure: State highway 125,  Year Built: 1948,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,725 (year 2031),  Design Load: H 15,  Features Intersected: PINE LOG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2770031,  Location: APP 2 MI W OF TIFTON (Lat: 31.450172,  Lng: -83.530672),  Route carried "on" structure: Interstate 75,  Year Built: 1957,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 48,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 72,225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 520 (US 82)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.779,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 45.3m (148.6ft),  Out-to-Out Width: 46.4m (152.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,648,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $2,472,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770032,  Location: APP 2 MI W OF TIFTON (Lat: 31.452056,  Lng: -83.530556),  Route carried "on" structure: Interstate 75,  Year Built: 1957,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 48,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 72,225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RR (TRACKS REMOVED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.779,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 41.2m (135.2ft),  Out-to-Out Width: 43.6m (143.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,545,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $2,318,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770034,  Location: APP 2 MI N OF TIFTON (Lat: 31.474947,  Lng: -83.523303),  Route carried "on" structure: Interstate 75,  Year Built: 1957,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 43,150 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 64,725 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-4707- CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.998,  Lanes on structure: 7,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 38.0m (124.7ft),  Out-to-Out Width: 39.6m (129.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,272,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $3,408,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770036,  Location: APP 3 MI N OF TIFTON (Lat: 31.478528,  Lng: -83.519639),  Route carried "on" structure: Interstate 75,  Year Built: 1957,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 41,250 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 61,875 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 41)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.998,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 35 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 34.7m (113.8ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,887,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,831,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770042,  Location: APP 4 MI SW OF TIFTON (Lat: 31.412600,  Lng: -83.590489),  Route carried "on" structure: County highway 546,  Year Built: 1954,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,250 (year 2031),  Design Load: H 15,  Features Intersected: ARNOLD CREEK,  Facility Carried by Structure: SCOOTERVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2770043,  Location: APP 4 MI W OF TIFTON (Lat: 31.493439,  Lng: -83.567650),  Route carried "on" structure: County highway 1179,  Year Built: 1956,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,260 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,890 (year 2031),  Design Load: H 15,  Features Intersected: MILL CREEK,  Facility Carried by Structure: WHIDDONS MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2770044,  Location: APP 6 MI NW OF TIFTON (Lat: 31.517878,  Lng: -83.586369),  Route carried "on" structure: County highway 1179,  Year Built: 1956,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 880 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,320 (year 2031),  Design Load: H 15,  Features Intersected: HEARD CREEK,  Facility Carried by Structure: WHIDDONS MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2770046,  Location: APP 2 MI SW OF TIFTON (Lat: 31.429228,  Lng: -83.547308),  Route carried "on" structure: County highway 1536,  Year Built: 1970,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,450 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,175 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: CARPENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 2770056,  Location: APP 4 MI W OF TIFTON (Lat: 31.481750,  Lng: -83.584119),  Route carried "on" structure: County highway 1983,  Year Built: 1965,  Status: Posted for load,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 3,240 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,860 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: UPPER TY TY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.83m (42.09ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770057,  Location: APP 4 MI W OF TIFTON (Lat: 31.481278,  Lng: -83.582108),  Route carried "on" structure: County highway 1983,  Year Built: 1965,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 3,240 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,860 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE RIVER OVERFLOW,  Facility Carried by Structure: UPPER TY TY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $475,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 277007,  Location: 4 MI S OF TIFTON (Lat: 31.416047,  Lng: -83.505178),  Route carried "on" structure: County highway 4729,  Year Built: 1987,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 11,280 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,920 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 59),  Facility Carried by Structure: SOUTHWELL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,289,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2770071,  Location: APP 2 MI W OF TIFTON (Lat: 31.458039,  Lng: -83.530189),  Route carried "on" structure: City street 4708,  Year Built: 1987,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 8,070 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,105 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 63A),  Facility Carried by Structure: 2ND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770074,  Location: NORTH TIFTON (Lat: 31.472808,  Lng: -83.507108),  Route carried "on" structure: City street 4719,  Year Built: 1975,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10,040 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,060 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER TRIB,  Facility Carried by Structure: 20TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $272,000
Find on map >>   Show street view

Structure Number: 2770075,  Location: NORTH TIFTON (Lat: 31.473219,  Lng: -83.519819),  Route carried "on" structure: City street 4719,  Year Built: 1975,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,780 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,670 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER TRIB.,  Facility Carried by Structure: 20TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $254,000
Find on map >>   Show street view

Structure Number: 2770078,  Location: APP 2 MI W OF TIFTON (Lat: 31.446019,  Lng: -83.529769),  Route carried "on" structure: US 319,  Year Built: 1987,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 7,500 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,250 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,812,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $2,717,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2770079,  Location: APP 7 MI S OF TIFTON (Lat: 31.382247,  Lng: -83.554958),  Route carried "on" structure: US 319,  Year Built: 1988,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 7,990 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,985 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ARNOLD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $272,000
Find on map >>   Show street view

Structure Number: 277008,  Location: APP 4 MI W OF TIFTON (Lat: 31.442947,  Lng: -83.475969),  Route carried "on" structure: US 82,  Year Built: 1987,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 12,060 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,090 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2770081,  Location: APP 5 MI E OF TIFTON (Lat: 31.430328,  Lng: -83.431347),  Route carried "on" structure: US 82,  Year Built: 1987,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 6,810 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2770082,  Location: APP 2 MI W OF TIFTON (Lat: 31.441589,  Lng: -83.527178),  Route carried "on" structure: Ramp State highway 35,  Year Built: 1988,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 3,340 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,010 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 61)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,457,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $2,186,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2770083,  Location: APP 2 MI NW OF TIFTON (Lat: 31.463628,  Lng: -83.529878),  Route carried "on" structure: City street 4710,  Year Built: 1988,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 5,570 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,355 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 63B),  Facility Carried by Structure: 8TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2775002,  Location: APP 4.2 MI E OF TIFTON (Lat: 31.452708,  Lng: -83.436078),  Route carried "on" structure: County highway 7,  Year Built: 1980,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 450 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 675 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: BOWEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 2775017,  Location: APP 4 MI NE OF OMEGA (Lat: 31.392089,  Lng: -83.565169),  Route carried "on" structure: County highway 76,  Year Built: 1987,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: H 15,  Features Intersected: ARNOLD CREEK,  Facility Carried by Structure: SHANNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000
Find on map >>   Show street view

Structure Number: 2775025,  Location: APP 5 MI SE OF TIFTON (Lat: 31.432489,  Lng: -83.431928),  Route carried "on" structure: County highway 92,  Year Built: 1928,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: H 15,  Features Intersected: MIDDLE CREEK O/F,  Facility Carried by Structure: OLD BROOKFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $166,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2775026,  Location: APP 4.9 MI SE OF TIFTON (Lat: 31.432658,  Lng: -83.433089),  Route carried "on" structure: County highway 92,  Year Built: 1928,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: H 15,  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: OLD BROOKFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $128,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2775033,  Location: APP 2.6 MI W OF TIFTON (Lat: 31.459728,  Lng: -83.555858),  Route carried "on" structure: County highway 117,  Year Built: 1984,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: KING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2775038,  Location: APP 5 MI W OF TIFTON (Lat: 31.481628,  Lng: -83.591219),  Route carried "on" structure: County highway 138,  Year Built: 1981,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BIG BRANCH OVERFLOW,  Facility Carried by Structure: RAY TAYLOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2775039,  Location: APP 5 MI W OF TIFTON (Lat: 31.480228,  Lng: -83.591169),  Route carried "on" structure: County highway 138,  Year Built: 1981,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: TAYLOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 277504,  Location: APP 5.5 MI NW OF CHULA (Lat: 31.558989,  Lng: -83.638400),  Route carried "on" structure: County highway 1179,  Year Built: 1980,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 400 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2032),  Design Load: HS 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: LITTLE RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,114,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Tifton, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.