Bridge Statistics for Pocatello, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 65Number of bridges
  • 604ft / 184mTotal length
  • $41,388,000Total costs
  • 519,720Total average daily traffic
  • 45,516Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pocatello
  • No street view available for this location

New bridges in Pocatello, ID - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 41950-1959
  • 281960-1969
  • 71980-1989
  • 71990-1999
  • 72000-2009
  • 112010-2019
Average Bridge Daily Traffic in Pocatello, ID
Average Bridge Truck Traffic in Pocatello, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 19.5%Very good
  • 19.5%Good
  • 43.9%Satisfactory
  • 12.2%Fair
  • 2.4%Poor
  • 2.4%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 24.4%Very good
  • 22.0%Good
  • 31.7%Satisfactory
  • 19.5%Fair
  • 2.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.8%Very good
  • 31.7%Good
  • 24.4%Satisfactory
  • 17.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 68.8%Very good
  • 6.3%Good
  • 18.8%Satisfactory
Find on map >>   Show street view

Structure Number: P433,  Location: 5KM N OF I-86 AT SR30 EXI (Lat: 42.935022,  Lng: -112.544942),  Route carried "on" structure: Federal lands road 152,  Year Built: 1960,  Status: Posted for load,  Structure Length: 3.68m (12.07ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,200 (year 2041),  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.200,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 8.4m (27.6ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 9.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2019,  Total Project Cost: $1,020,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109,  Location: 0.4 E. CHUBBUCK (Lat: 42.912583,  Lng: -112.459028),  Route carried "on" structure: Interstate 86,  Year Built: 1963,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 14,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 21,375 (year 2039),  Design Load: HS 20,  Features Intersected: UPRR;CHUBBUCK OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.198,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 10905,  Location: 0.4 E. CHUBBUCK (Lat: 42.912894,  Lng: -112.458481),  Route carried "on" structure: Interstate 86,  Year Built: 1963,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 14,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 21,375 (year 2039),  Design Load: HS 20,  Features Intersected: UPRR;CHUBBUCK OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.200,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Other Special Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 10911,  Location: 0.8 E. CHUBBUCK (Lat: 42.912558,  Lng: -112.451342),  Route carried "on" structure: Interstate 86,  Year Built: 2009,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 14,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 21,375 (year 2039),  Design Load: HL 93,  Features Intersected: HILINE ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.831,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10916,  Location: 0.8 E. CHUBBUCK (Lat: 42.912847,  Lng: -112.450847),  Route carried "on" structure: Interstate 86,  Year Built: 2010,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 14,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 21,375 (year 2039),  Design Load: HL 93,  Features Intersected: HILINE ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.832,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11195,  Location: 4.6 W. INKOM (Lat: 42.799053,  Lng: -112.340847),  Route carried "on" structure: Interstate 15,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 9,250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 13,875 (year 2039),  Design Load: HS 20,  Features Intersected: BLACKROCK RD.GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.303,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 112,  Location: 4.6 W. INKOM (Lat: 42.798681,  Lng: -112.341000),  Route carried "on" structure: Interstate 15,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 9,250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 13,875 (year 2039),  Design Load: HS 20,  Features Intersected: BLACKROCK RD.GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.305,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11205,  Location: 3.6 S. POCATELLO (Lat: 42.799028,  Lng: -112.363250),  Route carried "on" structure: Interstate 15,  Year Built: 1963,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 9,250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 13,875 (year 2039),  Design Load: HS 20,  Features Intersected: STC 1762;PORTNEUF RD IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.308,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,372,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,058,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1121,  Location: 3.6 S. POCATELLO (Lat: 42.798861,  Lng: -112.363639),  Route carried "on" structure: Interstate 15,  Year Built: 1963,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 9,250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 13,875 (year 2039),  Design Load: HS 20,  Features Intersected: STC 1762;PORTNEUF RD IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.310,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,372,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,058,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11225,  Location: 2.6 S. POCATELLO (Lat: 42.839333,  Lng: -112.410444),  Route carried "on" structure: Interstate 15,  Year Built: 1965,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HS 20,  Features Intersected: I 15B;S.POCATELLO IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.462,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.42m (30.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,141,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $3,212,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1123,  Location: 2.6 S. POCATELLO (Lat: 42.840417,  Lng: -112.411222),  Route carried "on" structure: Interstate 15,  Year Built: 1965,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HS 20,  Features Intersected: I 15B;S.POCATELLO IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.464,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.42m (30.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,141,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $3,212,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 11235,  Location: 1.7 S. POCATELLO (Lat: 42.851778,  Lng: -112.415194),  Route carried "on" structure: Interstate 15,  Year Built: 1964,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: BARTON RD.GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.899,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 11245,  Location: 0.6 S. POCATELLO (Lat: 42.866889,  Lng: -112.421000),  Route carried "on" structure: Interstate 15,  Year Built: 1964,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: SMA 7461;E. TERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.721,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,261,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,892,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1125,  Location: 0.6 S. POCATELLO (Lat: 42.867222,  Lng: -112.421528),  Route carried "on" structure: Interstate 15,  Year Built: 1964,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: SMA 7461;E. TERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.723,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,261,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,892,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 11256,  Location: IN POCATELLO (Lat: 42.875358,  Lng: -112.424822),  Route carried "on" structure: Interstate 15,  Year Built: 2007,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HL 93,  Features Intersected: STP 7341; CENTER ST. IC.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.634,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11261,  Location: IN POCATELLO (Lat: 42.875681,  Lng: -112.425331),  Route carried "on" structure: Interstate 15,  Year Built: 2007,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HL 93,  Features Intersected: STP 7341; CENTER ST. IC.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.635,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11271,  Location: IN POCATELLO (Lat: 42.897247,  Lng: -112.435228),  Route carried "on" structure: Interstate 15,  Year Built: 1999,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 19,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,500 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: I 15B;POCATELLO CREEK IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.226,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11276,  Location: IN POCATELLO (Lat: 42.897608,  Lng: -112.435753),  Route carried "on" structure: Interstate 15,  Year Built: 1998,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 19,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,500 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: I 15B;POCATELLO CREEK IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.228,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13696,  Location: POCATELLO WCL (Lat: 42.906833,  Lng: -112.512167),  Route carried "on" structure: US 30,  Year Built: 2000,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 4,900 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,350 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 534.058,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1749,  Location: IN POCATELLO;QUINN ROAD (Lat: 42.905833,  Lng: -112.457500),  Route carried "on" structure: US 91,  Year Built: 1986,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 22,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 33,750 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: UPRR;QUINN ROAD OP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.397,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19145,  Location: 0.2 N. 5.8 W. INKOM (Lat: 42.795417,  Lng: -112.363667),  Route carried "on" structure: County highway 1762,  Year Built: 1983,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,250 (year 2039),  Design Load: HS 20,  Features Intersected: PORTNEUF R;FT HALL MINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21305,  Location: IN POCATELLO;MAIN ARTHUR (Lat: 42.885639,  Lng: -112.477083),  Route carried "on" structure: City street 7151,  Year Built: 1957,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 9,200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,800 (year 2039),  Design Load: HS 20,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 71,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2131,  Location: IN POCATELLO;MAIN ARTHUR (Lat: 42.881417,  Lng: -112.473556),  Route carried "on" structure: City street 7151,  Year Built: 1957,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 9,200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,800 (year 2039),  Design Load: HS 20,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.156,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 71,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21315,  Location: IN POCATELLO;BENTON ST. (Lat: 42.859556,  Lng: -112.446472),  Route carried "on" structure: City street 7151,  Year Built: 1967,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 27.25m (89.40ft),  Average Daily Traffic: 10,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,750 (year 2039),  Design Load: HS 20,  Features Intersected: S.1ST AVE;UPRR;BENTON OP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.632,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 71,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 27.43m (89.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $9,207,000,  Roadway Improvement Cost: $921,000,  Total Project Cost: $13,811,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 2135,  Location: IN POCATELLO;GOULD ST (Lat: 42.873333,  Lng: -112.462056),  Route carried "on" structure: City street 7181,  Year Built: 1982,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 11,500 (year 2019),  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: HARRISON AVE;GOULD ST OP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 71,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $716,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,074,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21355,  Location: IN POCATELLO;GOULD ST (Lat: 42.873694,  Lng: -112.461500),  Route carried "on" structure: City street 7181,  Year Built: 1982,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 11,500 (year 2019),  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: UPRR;GOULD ST OP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.229,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 71,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.08m (26.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,711,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $4,066,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2136,  Location: IN POCATELLO;GOULD ST (Lat: 42.874583,  Lng: -112.460083),  Route carried "on" structure: City street 7181,  Year Built: 1982,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 11,500 (year 2019),  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: FIRST AVE;GOULD ST OP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.420,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 71,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $716,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,074,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21375,  Location: IN POCATELLO;CARSON ST. (Lat: 42.868361,  Lng: -112.465889),  Route carried "on" structure: City street 7221,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 3,900 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,850 (year 2039),  Design Load: H 15,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.023,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,050,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21405,  Location: IN POCATELLO;CUSTER ST. (Lat: 42.865472,  Lng: -112.463917),  Route carried "on" structure: City street 7261,  Year Built: 1953,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 4,900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,350 (year 2039),  Design Load: H 15,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,050,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2143,  Location: IN POCATELLO;FREMONT ST. (Lat: 42.861444,  Lng: -112.457917),  Route carried "on" structure: City street 7301,  Year Built: 1968,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,400 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,600 (year 2039),  Design Load: H 15,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.462,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21515,  Location: 2.0 S. POCATELLO (Lat: 42.842528,  Lng: -112.428694),  Route carried "on" structure: County highway 7391,  Year Built: 1967,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 7,700 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,550 (year 2039),  Design Load: H 20,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.414,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 73,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,250,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2194,  Location: 0.2 N. 4.0 W. INKOM (Lat: 42.795194,  Lng: -112.329417),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2039),  Design Load: HS 20,  Features Intersected: PORTNEUF R;NW.INKOM BR,  Facility Carried by Structure: W BLACKROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.197,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 22151,  Location: IN POCATELLO (Lat: 42.891861,  Lng: -112.433472),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 2,300 (year 2019),  Average Future Daily Traffic: 3,450 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: I 15;MONTE VISTA AVE GS,  Facility Carried by Structure: MONTE VISTA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.977,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22175,  Location: IN POCATELLO;BENTON ST (Lat: 42.857028,  Lng: -112.450417),  Route carried "on" structure: City street 7151,  Year Built: 1969,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 3,300 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,950 (year 2039),  Design Load: H 15,  Features Intersected: PORTNEUF RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.174,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $919,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2218,  Location: IN POCATELLO;CENTER ST (Lat: 42.859361,  Lng: -112.455000),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,850 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,275 (year 2039),  Design Load: H 15,  Features Intersected: PORTNEUF RIVER,  Facility Carried by Structure: CENTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 480.715,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22186,  Location: IN POCATELLO; LEWIS ST (Lat: 42.858750,  Lng: -112.453917),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 2,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,750 (year 2039),  Design Load: HL 93,  Features Intersected: PORTNEUF RIVER,  Facility Carried by Structure: LEWIS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.346,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22196,  Location: IN POCATELLO; CLARK ST. (Lat: 42.859917,  Lng: -112.456167),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2039),  Design Load: HS 20,  Features Intersected: PORTNEUF RIVER,  Facility Carried by Structure: CLARK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.224,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3452,  Location: 1.0 W. OF I-15 IC (Lat: 42.829200,  Lng: -112.412200),  Route carried "on" structure: City street 7217,  Year Built: 2016,  Status: Open,  Structure Length: 12.89m (42.29ft),  Average Daily Traffic: 5,200 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,800 (year 2039),  Design Load: HL 93,  Features Intersected: S 2ND;PORTNEUF R;UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.475,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 69.2m (227.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34525,  Location: 0.3 W. of I15 IC (Lat: 42.830639,  Lng: -112.409028),  Route carried "on" structure: City street 7217,  Year Built: 2016,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5,200 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,800 (year 2039),  Design Load: HL 93,  Features Intersected: AMI TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.869,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018
Find on map >>   Show street view

Structure Number: 3454,  Location: 3.35 SE POCATELLO (Lat: 42.830531,  Lng: -112.405758),  Route carried "on" structure: Interstate 15,  Year Built: 2015,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HL 93,  Features Intersected: SMA 5697;SOUTH VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.498,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.9m (176.8ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing