  • National Bridge Inventory (NBI) Statistics
  • 52Number of bridges
  • 1,102ft / 336mTotal length
  • $677,266,000Total costs
  • 291,784Total average daily traffic
  • 10,391Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Milledgeville
  • No street view available for this location

New bridges in Milledgeville, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 31940-1949
  • 111950-1959
  • 41960-1969
  • 41970-1979
  • 71980-1989
  • 81990-1999
  • 22000-2009
  • 92010-2019
Reconstructed bridges in Milledgeville, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 51980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Milledgeville, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 93.5%Good
  • 6.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Very good
  • 87.1%Good
  • 3.2%Satisfactory
  • 3.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.7%Very good
  • 67.7%Good
  • 16.1%Satisfactory
  • 6.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.5%Very good
  • 4.8%Good
  • 40.5%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 94.4%Good
  • 5.6%Satisfactory
Find on map >>   Show street view

Structure Number: 90002,  Location: 6.6 MI W OF MILLEDGEVILLE (Lat: 33.074169,  Lng: -83.340578),  Route carried "on" structure: State highway 22,  Year Built: 1955,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 7,380 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,070 (year 2031),  Design Load: HS 20,  Features Intersected: WATSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 44.26m (145.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $774,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90003,  Location: 3.7 MI W OF MILLEDGEVILLE (Lat: 33.085933,  Lng: -83.290861),  Route carried "on" structure: State highway 22,  Year Built: 1955,  Year Reconstructed: 1986,  Status: Posted for load,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 7,460 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,190 (year 2031),  Design Load: HS 20,  Features Intersected: LITTLE FISHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90004,  Location: 2.1 MI NW OF MILLEDGEVILL (Lat: 33.095308,  Lng: -83.259028),  Route carried "on" structure: State highway 22,  Year Built: 1955,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 10,090 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,135 (year 2031),  Design Load: HS 20,  Features Intersected: NS RR (279851V)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $791,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 90006,  Location: 0.6 MI W OF MILLEDGEVILLE (Lat: 33.082261,  Lng: -83.237125),  Route carried "on" structure: State highway 22,  Year Built: 1955,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 6,370 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,555 (year 2031),  Design Load: HS 20,  Features Intersected: NS RR. (733024N)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,359,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90007,  Location: 0.7 MI E OF MILLEDGEVILLE (Lat: 33.083628,  Lng: -83.215339),  Route carried "on" structure: State highway 22,  Year Built: 1971,  Status: Open,  Structure Length: 39.14m (128.41ft),  Average Daily Traffic: 16,510 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,765 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 13,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 9001,  Location: 3.3 MI NW OF MILLEDGEVILL (Lat: 33.120336,  Lng: -83.261867),  Route carried "on" structure: US 441,  Year Built: 1948,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 16,990 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,485 (year 2031),  Design Load: H 15,  Features Intersected: TOBLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 90011,  Location: 8.5 MI NW OF MILLEDGEVILL (Lat: 33.189744,  Lng: -83.292883),  Route carried "on" structure: US 441,  Year Built: 1952,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 11.67m (38.29ft),  Average Daily Traffic: 18,680 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,020 (year 2031),  Design Load: H 20,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.015,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 51.91m (170.31ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $904,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $1,496,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90012,  Location: 6.6 MI S OF MILLEDGEVILLE (Lat: 32.986203,  Lng: -83.212050),  Route carried "on" structure: US 441,  Year Built: 1936,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,165 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 90014,  Location: 0.7 MI S OF MILLEDGEVILLE (Lat: 33.070828,  Lng: -83.224211),  Route carried "on" structure: Business US 441,  Year Built: 1949,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 10,020 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,030 (year 2031),  Design Load: HS 20,  Features Intersected: FISHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,377,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,065,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90015,  Location: 1.3 MI W OF MILLEDGEVILLE (Lat: 33.074069,  Lng: -83.248339),  Route carried "on" structure: State highway 49,  Year Built: 1955,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 11,500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,250 (year 2031),  Design Load: HS 20,  Features Intersected: FISHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,368,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,051,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90016,  Location: 3.3 MI S OF MILLEDGEVILLE (Lat: 33.035775,  Lng: -83.209131),  Route carried "on" structure: State highway 112,  Year Built: 1962,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 3,280 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,920 (year 2031),  Design Load: HS 20,  Features Intersected: CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,125,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90017,  Location: 0.7 MI S OF MILLEDGEVILLE (Lat: 33.072700,  Lng: -83.221183),  Route carried "on" structure: State highway 112,  Year Built: 1963,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 8,560 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,840 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,464,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $3,696,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90025,  Location: 3 MI NE OF MILLEDGEVILLE (Lat: 33.108953,  Lng: -83.186961),  Route carried "on" structure: County highway 782,  Year Built: 1957,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,890 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,835 (year 2031),  Design Load: H 15,  Features Intersected: BLACK SPRING BRANCH,  Facility Carried by Structure: LAKE LAUREL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 90026,  Location: 3.3 MI NE OF MILLEDGEVILL (Lat: 33.116519,  Lng: -83.188689),  Route carried "on" structure: County highway 782,  Year Built: 1957,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,890 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,835 (year 2031),  Design Load: H 15,  Features Intersected: CHAMPION CREEK,  Facility Carried by Structure: LAKE LAUREL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 90027,  Location: 2.4 MI N OF MILLEDGEVILLE (Lat: 33.116061,  Lng: -83.233042),  Route carried "on" structure: County highway 3102,  Year Built: 1950,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 7,430 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,145 (year 2031),  Design Load: H 15,  Features Intersected: TOBLER CREEK,  Facility Carried by Structure: N JEFFERSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $651,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90034,  Location: 0.7 MI S OF MILLEDGEVILLE (Lat: 33.071756,  Lng: -83.222664),  Route carried "on" structure: City street 3101,  Year Built: 1966,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 750 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: S JEFFERSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,642,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $2,464,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90035,  Location: 0.5 MI N OF MILLEDGEVILLE (Lat: 33.087211,  Lng: -83.227028),  Route carried "on" structure: County highway 3102,  Year Built: 1940,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 18,060 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,090 (year 2031),  Design Load: H 15,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: N JEFFERSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90036,  Location: 0.7 MI S OF MILLEDGEVILLE (Lat: 33.070631,  Lng: -83.225856),  Route carried "on" structure: City street 3105,  Year Built: 1964,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 4,910 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,365 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: S WILKINSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,377,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,065,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90037,  Location: 1.4 MI N OF MILLEDGEVILLE (Lat: 33.099531,  Lng: -83.239758),  Route carried "on" structure: City street 3108,  Year Built: 1982,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,210 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,815 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: LAKESIDE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 90041,  Location: 2.4 MI W OF MILLEDGEVILLE (Lat: 33.081703,  Lng: -83.269281),  Route carried "on" structure: City street 3120,  Year Built: 1970,  Status: Posted for load,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 4,300 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,450 (year 2031),  Design Load: HS 15,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: BLANDY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 45.75m (150.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90042,  Location: 2.1 MI NW OF MILLEDGEVILL (Lat: 33.095428,  Lng: -83.258808),  Route carried "on" structure: State highway 22,  Year Built: 1986,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 10,090 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,135 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RR (279851V)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $990,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90048,  Location: 1.9 MI W OF MILLEDGEVILLE (Lat: 33.082328,  Lng: -83.260128),  Route carried "on" structure: US 441,  Year Built: 1987,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 14,760 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,140 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: SR 29 (NBL) - US 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,110,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90049,  Location: 1.9 MI W OF MILLEDGEVILLE (Lat: 33.082347,  Lng: -83.260408),  Route carried "on" structure: US 441,  Year Built: 1987,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 14,760 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,140 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: SR 29 (SBL) - US 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,110,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95013,  Location: 6.9 MI SW OF MILLEDGEVILL (Lat: 33.055689,  Lng: -83.340528),  Route carried "on" structure: County highway 95,  Year Built: 1985,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: H 15,  Features Intersected: FISHING CREEK TRIB,  Facility Carried by Structure: BONNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 95021,  Location: 5.3 MI SE OF MILLEDGEVILL (Lat: 33.035097,  Lng: -83.154978),  Route carried "on" structure: County highway 179,  Year Built: 1986,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: STEMBRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 95024,  Location: 6.3 MI NE OF MILLEDGEVILL (Lat: 33.149336,  Lng: -83.158119),  Route carried "on" structure: County highway 202,  Year Built: 1979,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROCKY CREEK,  Facility Carried by Structure: GUMM CEMETERY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 95025,  Location: 1.2 MI S OF MILLEDGEVILLE (Lat: 33.063419,  Lng: -83.222578),  Route carried "on" structure: County highway 241,  Year Built: 1950,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 270 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 405 (year 2031),  Features Intersected: FISHING CREEK TRIB,  Facility Carried by Structure: HORNE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 42.06m (137.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95027,  Location: 0.6 MI NW OF MILLEDGEVILL (Lat: 33.083769,  Lng: -83.236828),  Route carried "on" structure: City street 556,  Year Built: 1979,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RR. (733025V),  Facility Carried by Structure: THOMAS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 95028,  Location: 0.7 MI S OF MILLEDGEVILLE (Lat: 33.070203,  Lng: -83.223550),  Route carried "on" structure: City street 595,  Year Built: 1980,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK TRIB,  Facility Carried by Structure: E ANDREWS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 95031,  Location: 0.4 MI N OF MILLIDGEVILLE (Lat: 33.086942,  Lng: -83.228733),  Route carried "on" structure: City street 3104,  Year Built: 1991,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 2,260 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,390 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: NORTH WAYNE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $369,000
Find on map >>   Show street view

Structure Number: 95032,  Location: CITY OF MILLEDGEVILLE (Lat: 33.087939,  Lng: -83.230594),  Route carried "on" structure: City street 531,  Year Built: 1993,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: N WILKINSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $311,000
Find on map >>   Show street view

Structure Number: 95033,  Location: CITY OF MILLEDGEVILLE (Lat: 33.090419,  Lng: -83.233000),  Route carried "on" structure: City street 624,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: WALTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000
Find on map >>   Show street view

Structure Number: 95034,  Location: CITY OF MILLEDGEVILLE (Lat: 33.091775,  Lng: -83.233506),  Route carried "on" structure: City street 521,  Year Built: 1992,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 12,900 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,350 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: MITCHELL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 95035,  Location: CITY OF MILLEDGEVILLE (Lat: 33.089136,  Lng: -83.231550),  Route carried "on" structure: City street 526,  Year Built: 1994,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TANYARD BRANCH,  Facility Carried by Structure: HALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 95036,  Location: CITY OF MILLEDGEVILLE (Lat: 33.087856,  Lng: -83.231714),  Route carried "on" structure: City street 527,  Year Built: 1994,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROCKY CREEK,  Facility Carried by Structure: SIMMON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $132,000
Find on map >>   Show street view

Structure Number: 95039,  Location: 3.6 MI NW OF MILLEDGEVILL (Lat: 33.126503,  Lng: -83.253756),  Route carried "on" structure: County highway 579,  Year Built: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: H 15,  Features Intersected: TOBLER CREEK TRIB,  Facility Carried by Structure: CORDS BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 9504,  Location: 6.3 MI W OF MILLEDGEVILLE (Lat: 33.073456,  Lng: -83.336069),  Route carried "on" structure: County highway 72,  Year Built: 2003,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: PETTIGREW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $762,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,143,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95042,  Location: 0.6 MI W OF MILLEDGEVILLE (Lat: 33.082117,  Lng: -83.237944),  Route carried "on" structure: State highway 22,  Year Built: 2008,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 6,370 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,555 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TATTNALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 22.7m (74.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $725,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,087,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95046,  Location: 4.5 MI S OF MILLEDGEVILLE (Lat: 33.012917,  Lng: -83.194781),  Route carried "on" structure: State highway 243,  Year Built: 2015,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 2,675 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,250 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.49m (34.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $25,456,000,  Roadway Improvement Cost: $2,546,000,  Total Project Cost: $38,184,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95047,  Location: 4.5 MI S OF MILLEDGEVILLE (Lat: 33.013117,  Lng: -83.195067),  Route carried "on" structure: State highway 243,  Year Built: 2015,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 3,200 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,250 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.49m (34.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $25,456,000,  Roadway Improvement Cost: $2,546,000,  Total Project Cost: $38,184,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95048,  Location: 4.7 MI SE OF MILLEDGEVILL (Lat: 33.024231,  Lng: -83.185567),  Route carried "on" structure: State highway 243,  Year Built: 2015,  Status: Open,  Structure Length: 45.72m (150.00ft),  Average Daily Traffic: 2,675 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,250 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 54.86m (179.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $133,200,000,  Roadway Improvement Cost: $13,320,000,  Total Project Cost: $199,800,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Discuss Milledgeville, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.